[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3239075":3,"bid-history-3239075":36,"bid-related-3239075":40,"union-latest":91},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":15,"documentUrls":29,"businessExperience":31,"localOffice":26,"securityRequirement":31,"qualifications":32,"certifications":33,"organization":34},3239075,"河川高潮第7323-0-002号 (二)千種川水系 加里屋川 柳 橋 橋梁下部工事(その2)",2686,28,2,16,1,"兵庫県 西播磨県民局 本局(総務防災課 - 土木・まちづくり)","兵庫県","2026-08-03T15:00:00.000Z","2026-09-06T15:00:00.000Z",null,"active","橋梁","一般競争入札","一般土木","赤穂市加里屋","12:00:00","2026-09-02T15:00:00.000Z","・兵庫県の建設工事入札参加資格者名簿の一般土木工事においてA等級又はB等級であること\n・相生市、赤穂市、赤穂郡上郡町又は佐用郡佐用町に建設業の許可を受けた主たる営業所を有すること\n・土木工事業に係る特定建設業の許可を有すること\n・技術・社会貢献評価数値の合計点数が110点以上であること(工事成績の加算申請が可能)\n・建設業法第26条に定める技術者を配置すること\n・資本関係又は人的関係がある者同士の同一入札への参加を制限する運用基準に該当しないこと\n・単独企業による応募であること","【案件概要】\n兵庫県西播磨県民局が千種川水系加里屋川の柳橋橋梁下部工事(その2)を制限付き一般競争入札(事後審査型・総合評価落札方式)で発注。赤穂市加里屋地先での橋梁下部工事で、工事場所は兵庫県赤穂市。契約締結予定日は令和8年8月4日で、全体工期は令和9年7月31日までのフレックス方式を採用。週休2日制度の対象工事であり、ICT活用工事でもある。\n\n【業務内","容】\n- 橋梁下部工事(延長L=10.40m、幅員W=5.60m)\n- A1橋台(逆T式)の施工 1.0式\n- 既製杭圧入(鋼管回転杭)の施工 8本\n- 3次元起工測量・設計データ作成・出来形管理等のICT活用施工(受注者選択)\n\n【応募要件】\n- 兵庫県の建設工事入札参加資格者名簿の一般土木工事においてA等級又はB等級であること\n- 相生市、赤穂市、赤穂郡上郡町又は佐用郡佐用町に建設業の許可を受けた主たる営業所を有すること\n- 土木工事業に係る特定建設業の許可を有すること\n- 技術・社会貢献評価数値の合計点数が110点以上であること(工事成績の加算申請が可能)\n- 建設業法第26条に定める技術者を配置すること\n- 資本関係又は人的関係がある者同士の同一入札への参加を制限する運用基準に該当しないこと\n- 単独企業による応募であること\n\n【工期・期間】\n履行期間は令和9年7月31日まで。フレックス方式により、受注者は余裕期間内で工期の始期日及び終期日を任意に設定可能。余裕期間内は現場代理人の常駐不要で、他工事従事中の現場代理人を充てることができる。\n\n【スケジュール】\n入札参加申込書受付:令和8年8月4日(火)から8月31日(月)まで \u002F 質問書受付:令和8年8月4日(火)から8月17日(月)まで \u002F 入札書・技術資料受付:令和8年9月4日(金)から9月7日(月)まで(正午から午後1時を除く、最終日は午前9時から正午まで) \u002F 開札:令和8年9月3日(木)午後2時10分 \u002F 資格確認資料提出:令和8年9月1日(火)から9月2日(水)まで",true,"(redacted)","ppi-core-hyogo",[30],{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":35,"parentId":15,"parentName":15,"bidInfoUrl":15},15,[37],{"year":38,"count":39},2026,9,{"sameOrganization":41,"samePrefecture":59,"similar":83},[42,45,49,53,56],{"id":43,"title":44,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":15,"budget":15,"status":16},3239079,"河川高潮第7322-0-001号 (二)千種川水系 千種川 堤防 改修工事(その7)",{"id":46,"title":47,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":48,"budget":15,"status":16},3239078,"道路防災安第7057-0-001号 (一)竜泉那波線 道路改良工 事その8","2026-08-30T15:00:00.000Z",{"id":50,"title":51,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":52,"budget":15,"status":16},3239077,"広域河川第8205-0-002号 (二)千種川水系 千種川 護岸 工事(與井新地区)その8","2026-09-01T15:00:00.000Z",{"id":54,"title":55,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":52,"budget":15,"status":16},3239076,"公園施設第8008-0-001号 赤穂海浜公園 展望施設整備工事 (その3)",{"id":57,"title":58,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":52,"budget":15,"status":16},3239074,"通常砂防第8002-5-001号 (砂)古木谷川 砂防堰堤工事( その2)",[60,65,70,74,79],{"id":61,"title":62,"organizationName":63,"prefectureName":12,"publishedDate":64,"deadlineDate":15,"budget":15,"status":16},2954301,"播磨中継加圧ポンプ場電気設備更新工事","兵庫県 企業庁 利水事務所","2027-03-24T15:00:00.000Z",{"id":66,"title":67,"organizationName":68,"prefectureName":12,"publishedDate":69,"deadlineDate":15,"budget":15,"status":16},3890505,"(二)夢前川水系 菅生川 護岸修繕工事","兵庫県 中播磨県民センター 本局(総務防災課 - 土木・まちづくり)","2026-08-24T15:00:00.000Z",{"id":71,"title":72,"organizationName":68,"prefectureName":12,"publishedDate":69,"deadlineDate":73,"budget":15,"status":16},3887729,"(二)夢前川水系 夢前川 護岸修繕工事","2026-09-08T15:00:00.000Z",{"id":75,"title":76,"organizationName":77,"prefectureName":12,"publishedDate":69,"deadlineDate":78,"budget":15,"status":16},3885181,"R8円山川河川整備計画とりまとめ他業務","国土交通省近畿地方整備局","2026-09-03T15:00:00.000Z",{"id":80,"title":81,"organizationName":82,"prefectureName":12,"publishedDate":69,"deadlineDate":15,"budget":15,"status":16},3885025,"(二)武庫川水系大池川 福島大池流域貯留浸透施設整備工 事","兵庫県 阪神北県民局 本局(総務防災課 - 土木・まちづくり)",[84],{"id":85,"title":86,"organizationName":87,"prefectureName":12,"publishedDate":88,"deadlineDate":89,"budget":15,"status":90},3061573,"(二)千種川水系 千種川 護岸修繕工事","兵庫県 西播磨県民局 龍野土木事務所","2026-07-30T15:00:00.000Z","2026-08-23T15:00:00.000Z","closed",[92,98,104,110],{"title":93,"link":94,"date":95,"thumb":96,"cat":97},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":99,"link":100,"date":101,"thumb":102,"cat":103},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":105,"link":106,"date":107,"thumb":108,"cat":109},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":111,"link":112,"date":113,"thumb":114,"cat":115},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]