[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3238089":3,"bid-history-3238089":35,"bid-related-3238089":39,"union-latest":106},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":8,"organizationName":10,"prefectureName":11,"publishedDate":12,"deadlineDate":13,"budget":13,"status":14,"department":15,"bidCategoryName":16,"bidTypeName":17,"categoryText":18,"regionText":19,"deadlineTime":13,"openingDate":13,"qualificationText":20,"aiSummary":21,"aiSummaryGated":22,"aiSummaryTruncated":23,"sourceUrl":24,"dataSourceCode":25,"budgetTaxIncluded":13,"documentUrls":26,"businessExperience":31,"localOffice":31,"securityRequirement":31,"qualifications":32,"certifications":33,"organization":34},3238089,"人権第17号　新庄集会所子ども室解体工事",2914,26,2,13,"福知山市","京都府","2026-08-03T15:00:00.000Z",null,"active","総務部 契約監理課","解体","指名競争入札","解体工事","福知山市新庄地内","・公共建築工事標準仕様書、標準図及び公共建築改修工事標準仕様書に基づく施工能力を有すること\n・工事現場ごとに専任の主任技術者又は監理技術者を配置すること\n・施工計画書を提出すること\n・下請契約がある場合は施工体制台帳及び施工体系図を作成・提出すること\n・特別管理産業廃棄物を生じる場合は特別管理産業廃棄物管理責任者を設置すること\n・交通誘導員Ｂ級以上の有資格者を配置すること\n・建設副産物の適正処理及び再生資源利用計画・促進計画を作成・提出すること\n・石綿含有の事前調査を実施し関係機関に報告すること\n・法定外労災保険に加入すること\n・火災保険、工事保険等に加入すること\n・人権研修を1回以上実施すること\n・週休2日制を確保すること","【案件概要】\n福知山市建設交通部建築住宅課が実施する解体工事の一般競争入札。新庄集会所子ども室の老朽化に伴い、木造平家建ての建物及び設備の解体を行う。本工事は工事情報共有システム、建設キャリアアップシステム、建設現場の遠隔臨場、完成図書等の電子納品についての試行工事であり、ウィークリースタンスの対象工事。工事場所は福知山市新庄地内の市街化調整区域に立地し、周","辺は田園及び住宅地。予定価格（税込）の記載なし。工期は令和8年12月14日までを予定。\n\n【業務内容】\n- 新庄集会所の子ども室（昭和45年頃増築の木造平家建て）及び集会室棟の解体工事\n- 建物、設備機器類の設計、製作、調達、運搬、据付及び工事\n- 工事施工、納入のための関係機関への書類作成及び諸手続き\n- 建設副産物（建設発生土、産業廃棄物等）の適正処分及び再生資源利用\n- 交通誘導員（Ｂ級4名）の配置\n- 建設発生土の福知山市環境パーク不燃物埋立処分場への運搬\n- アスベスト事前調査及び関係官庁への報告\n- 完成図書等の電子納品（試行）\n- 熱中症対策の強化（作業不能日数9日間を見込む）\n- 工事情報共有システム、建設キャリアアップシステム、遠隔臨場の試行実施\n\n【応募要件】\n- 公共建築工事標準仕様書、標準図及び公共建築改修工事標準仕様書に基づく施工能力\n- 工事現場ごとに専任の主任技術者又は監理技術者の配置\n- 施工計画書の提出（契約金額250万円未満で維持工事等簡易な工事は一部省略可）\n- 下請契約がある場合は施工体制台帳及び施工体系図の作成・提出\n- 特別管理産業廃棄物を生じる場合は特別管理産業廃棄物管理責任者の設置\n- 交通誘導員Ｂ級以上の有資格者の配置\n- 建設副産物の適正処理及び再生資源利用計画・促進計画の作成・提出\n- 石綿含有の事前調査及び関係機関への報告\n- 法定外労災保険（工事請負契約約款第50条関係）への加入\n- 火災保険、工事保険等の加入\n- 人権研修の実施（1回以上）\n- 週休2日制の確保\n\n【工期・期間】\n契約締結後、令和8年（2026年）12月14日までの完成を予定。標準工期は3.3か月。作業時間は平日一般が午前9時00分～午後6時00分、騒音を伴う場合は午後3時00分～午後5時00分を原則とし、事前に施設管理者・入居者・近隣自治会等と調整する。猛暑による作業不能日数は9日間を見込んでいる。",true,"(redacted)","efftis-kyoto",[27,28,29,30],{"url":24,"name":24},{"url":24,"name":24},{"url":24,"name":24},{"url":24,"name":24},false,[],[],{"id":6,"name":10,"categoryId":13,"parentId":13,"parentName":13,"bidInfoUrl":13},[36],{"year":37,"count":38},2026,38,{"sameOrganization":40,"samePrefecture":62,"similar":84},[41,46,50,54,58],{"id":42,"title":43,"organizationName":10,"prefectureName":11,"publishedDate":44,"deadlineDate":45,"budget":13,"status":14},4388725,"道河第70号　広小路勅使線道路改良工事","2026-09-03T15:00:00.000Z","2026-09-09T15:00:00.000Z",{"id":47,"title":48,"organizationName":10,"prefectureName":11,"publishedDate":49,"deadlineDate":13,"budget":13,"status":14},4323308,"道河第53号　厚1号線道路改良工事","2026-09-02T15:00:00.000Z",{"id":51,"title":52,"organizationName":10,"prefectureName":11,"publishedDate":53,"deadlineDate":13,"budget":13,"status":14},4258813,"道河第50号　谷川浚渫工事","2026-09-01T15:00:00.000Z",{"id":55,"title":56,"organizationName":10,"prefectureName":11,"publishedDate":57,"deadlineDate":13,"budget":13,"status":14},4210964,"水道工第12号　市寺地内消火栓取替工事","2026-08-31T15:00:00.000Z",{"id":59,"title":60,"organizationName":10,"prefectureName":11,"publishedDate":61,"deadlineDate":13,"budget":13,"status":14},4172453,"教総第36号　雀部小学校北校舎軒天改修工事","2026-08-30T15:00:00.000Z",[63,69,73,77,81],{"id":64,"title":65,"organizationName":66,"prefectureName":11,"publishedDate":44,"deadlineDate":67,"budget":68,"status":14},4424861,"(最高裁判決を踏まえた保護費等の追加給付事務)文書運搬業務委託について","京都府京都市","2026-09-10T15:00:00.000Z",2500000,{"id":70,"title":71,"organizationName":66,"prefectureName":11,"publishedDate":44,"deadlineDate":67,"budget":72,"status":14},4424860,"移動式照明器具及び防雨防塵型電工ドラムの購入(西賀茂中学校)",1418300,{"id":74,"title":75,"organizationName":66,"prefectureName":11,"publishedDate":44,"deadlineDate":67,"budget":76,"status":14},4424859,"教師用及び児童用理科実験台(西京極西小学校)",3178450,{"id":78,"title":79,"organizationName":66,"prefectureName":11,"publishedDate":44,"deadlineDate":67,"budget":80,"status":14},4424858,"令和8年度京都市森林経営管理事業間伐業務(京都集計R7-16ほか)",7504000,{"id":82,"title":83,"organizationName":66,"prefectureName":11,"publishedDate":44,"deadlineDate":67,"budget":68,"status":14},4424857,"軽自動車税事務所(分室)における通話録音システム(IVR)調達及び構築設置業務委託",[85,93,99],{"id":86,"title":87,"organizationName":88,"prefectureName":89,"publishedDate":90,"deadlineDate":91,"budget":13,"status":92},2160292,"旧両神学童保育室解体工事","小鹿野町 (総合政策課) 総合政策課","埼玉県","2026-07-05T15:00:00.000Z","2026-07-20T15:00:00.000Z","closed",{"id":94,"title":95,"organizationName":96,"prefectureName":97,"publishedDate":98,"deadlineDate":90,"budget":13,"status":92},3327340,"清水中学校木金工室解体工事","佐世保市","長崎県","2026-06-16T15:00:00.000Z",{"id":100,"title":101,"organizationName":102,"prefectureName":103,"publishedDate":104,"deadlineDate":105,"budget":13,"status":92},80156,"横須賀米軍(8)ボイラー室解体工事","防衛省南関東防衛局","神奈川県","2026-04-16T15:00:00.000Z","2026-05-11T15:00:00.000Z",[107,113,119,125],{"title":108,"link":109,"date":110,"thumb":111,"cat":112},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":114,"link":115,"date":116,"thumb":117,"cat":118},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":120,"link":121,"date":122,"thumb":123,"cat":124},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":126,"link":127,"date":128,"thumb":129,"cat":130},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]