[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3229937":3,"bid-history-3229937":37,"bid-related-3229937":41,"union-latest":124},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":21,"deadlineTime":22,"openingDate":23,"qualificationText":24,"aiSummary":25,"aiSummaryGated":26,"aiSummaryTruncated":27,"sourceUrl":28,"dataSourceCode":29,"budgetTaxIncluded":15,"documentUrls":30,"businessExperience":27,"localOffice":27,"securityRequirement":32,"qualifications":33,"certifications":35,"organization":36},3229937,"R8・9能越道 池田川橋下部その1工事",89,17,2,16,1,"国土交通省北陸地方整備局","石川県","2026-08-03T15:00:00.000Z","2026-08-25T15:00:00.000Z",null,"closed","能登復興事務所","橋梁","一般競争入札","橋梁工事（橋台下部工）","石川県輪島市山ノ上町地先","13:00:00","2027-01-06T15:00:00.000Z","・予決令第70条及び第71条の規定に該当しない者であること\n・北陸地方整備局における令和7・8年度一般競争参加資格者で一般土木工事の認定を受けていること\n・経営事項評価点数が1,200点以上であること（地域JVのうち代表者以外の構成員を除く）\n・会社更生法又は民事再生法に基づき手続開始の申立てがされていないこと（再認定を受けた者を除く）\n・地域JVの場合は構成員の1者以上が発注工事対応業種の許可を受けた本店が石川県内にあること\n・平成23年度以降に元請として完成した、鉄筋コンクリート構造の橋台又は橋脚で躯体高さ10ｍ以上の施工実績を有すること\n・建設共同企業体の構成員実績は、特定JV・地域JV・異工種JVは均等割の6\u002F10以上、経常JVは20％以上のものに限定\n・同一企業が複数形態で同一入札に同時参加することは認めない\n・1級土木施工管理技士又はこれと同等以上の資格を有する主任技術者又は監理技術者を配置できること\n・主任技術者又は監理技術者は平成23年度以降に要件を満たす工事の施工経験を有すること\n・監理技術者の場合は監理技術者資格者証及び監理技術者講習修了証を有する者であること\n・入札参加者間に資本関係又は人事関係がないこと\n・暴力団員が実質的に経営を支配する者又はこれに準ずるものとして国土交通省が排除要請している状態でないこと\n・過去に調査基準価格を下回った価格で契約し工事成績評定が60点未満の通知を受けた場合、その通知日から1年経過していること\n・入札説明書及び全配付資料（変更分を含む）をダウンロードした者又は指定方法で交付を受けた者であること\n・設計業務等の受託者及び当該受託者と資本若しくは人事面において関連がある建設業者でないこと","【案件概要】\n国土交通省北陸地方整備局が、能登地震の復興事業の一環として、能越自動車道池田川橋下部その1工事の一般競争入札（段階選抜型）を実施します。工事場所は石川県輪島市山ノ上町地先。工期は工事の始期から406日間で、令和9年2月19日までに着工する必要があります。本工事は施工体制確認型総合評価落札方式（技術提案評価型S型）の試行工事であり、一次審査で上位","10者（同点者含む）に絞られた後、二次審査で技術提案を評価します。\n\n【業務内容】\n- 橋台工1式\n- 深礎工9本\n- 橋台躯体工1基\n- 仮設工1式\n- 施工体制確認型総合評価落札方式による価格と技術提案の総合評価\n- 契約後VE方式への対応\n- BIM\u002FCIM適用工事\n- ICT活用工事（橋脚・橋台施工者希望Ⅱ型）\n- 新技術活用工事の実施\n- 建設キャリアアップシステム義務化モデル工事への対応\n\n【応募要件】\n・予決令第70条・71条の規定に該当しない者であること\n・北陸地方整備局における令和7・8年度一般競争参加資格者で一般土木工事の認定を受けていること\n・経営事項評価点数が1,200点以上であること（地域JVの代表者以外構成員を除く）\n・平成23年度以降に元請として完成した、鉄筋コンクリート構造の橋台又は橋脚で躯体高さ10ｍ以上の施工実績を有すること\n・1級土木施工管理技士又はこれと同等以上の資格を有する主任技術者又は監理技術者を配置できること\n・当該技術者は平成23年度以降に要件を満たす工事の施工経験を有すること\n・特定JV、地域JV、または経常JVによる参加、または単体有資格業者での参加が可能\n・地域JVの場合は構成員の1者以上が石川県内に本店を有すること\n・入札参加者間に資本関係または人的関係がないこと\n・暴力団排除要件に該当しないこと\n・過去に調査基準価格を下回り工事成績評定が60点未満となった通知日から1年以上経過していること\n・入札説明書及び全配付資料をダウンロードした者であること\n\n【工期・期間】\n工事の始期から406日間。令和9年2月19日（金）までに工事着手が必須。契約締結日の翌日から工事始期までは主任技術者又は監理技術者の配置不要。",true,"(redacted)","ippi-koji",[31],{"url":28,"name":28},false,[34],3,[],{"id":6,"name":11,"categoryId":7,"parentId":15,"parentName":15,"bidInfoUrl":15},[38],{"year":39,"count":40},2026,214,{"sameOrganization":42,"samePrefecture":67,"similar":93},[43,49,55,61,64],{"id":44,"title":45,"organizationName":11,"prefectureName":12,"publishedDate":46,"deadlineDate":47,"budget":15,"status":48},4377088,"R8・9 能越道越の原横田道路復旧その5工事","2026-09-03T15:00:00.000Z","2026-09-14T15:00:00.000Z","active",{"id":50,"title":51,"organizationName":11,"prefectureName":52,"publishedDate":53,"deadlineDate":54,"budget":15,"status":48},4314610,"R8羽越管内空中写真測量業務","新潟県","2026-09-02T15:00:00.000Z","2026-09-10T15:00:00.000Z",{"id":56,"title":57,"organizationName":11,"prefectureName":58,"publishedDate":59,"deadlineDate":60,"budget":15,"status":48},4254561,"令和8年度千曲川・犀川定期縦横断測量業務","長野県","2026-09-01T15:00:00.000Z","2026-09-13T15:00:00.000Z",{"id":62,"title":63,"organizationName":11,"prefectureName":58,"publishedDate":59,"deadlineDate":60,"budget":15,"status":48},4254560,"令和8年度千曲川管内護岸設計等その3業務",{"id":65,"title":66,"organizationName":11,"prefectureName":58,"publishedDate":59,"deadlineDate":60,"budget":15,"status":48},4254559,"令和8年度千曲川管内測量その2業務",[68,74,79,85,89],{"id":69,"title":70,"organizationName":71,"prefectureName":12,"publishedDate":46,"deadlineDate":72,"budget":73,"status":48},4424224,"市道C第142号線 舗装修繕工事(PDFファイル:139.9KB)","石川県加賀市","2026-09-30T15:00:00.000Z",34000000,{"id":75,"title":76,"organizationName":77,"prefectureName":12,"publishedDate":46,"deadlineDate":78,"budget":15,"status":48},4424220,"入札公告(石川工業高専校舎管理棟照明設備改修工事)","独立行政法人国立高等専門学校機構石川工業高等専門学校","2026-09-17T15:00:00.000Z",{"id":80,"title":81,"organizationName":82,"prefectureName":12,"publishedDate":53,"deadlineDate":83,"budget":84,"status":48},4426581,"白山市石立町土地区画整理事業 ほも川改修工事(1工区)\u002F白山市石立町土地区画整理事業 ほも川改修工事(2工区)\u002F若宮公園再整備 北側駐車場拡張工事 (PDF 230.4KB)","石川県白山市","2026-09-15T15:00:00.000Z",125370300,{"id":86,"title":87,"organizationName":82,"prefectureName":12,"publishedDate":53,"deadlineDate":83,"budget":88,"status":48},4426580,"(都)相木成線 消雪施設設置工事(2工区) (PDF 210.6KB)",15059000,{"id":90,"title":91,"organizationName":82,"prefectureName":12,"publishedDate":53,"deadlineDate":83,"budget":92,"status":48},4426579,"令和8年度 御手洗地区防風柵修繕工事 (PDF 198.1KB)",10472000,[94,100,107,113,119],{"id":95,"title":96,"organizationName":97,"prefectureName":98,"publishedDate":99,"deadlineDate":15,"budget":15,"status":48},2954301,"播磨中継加圧ポンプ場電気設備更新工事","兵庫県 企業庁 利水事務所","兵庫県","2027-03-24T15:00:00.000Z",{"id":101,"title":102,"organizationName":103,"prefectureName":104,"publishedDate":46,"deadlineDate":105,"budget":106,"status":48},4433419,"第26号 町道芝原森崎線舗装補修工事","熊本県嘉島町","熊本県","2026-12-17T15:00:00.000Z",6343000,{"id":108,"title":109,"organizationName":110,"prefectureName":104,"publishedDate":46,"deadlineDate":111,"budget":112,"status":48},4433416,"関の谷川第二災害復旧工事","熊本県八代市","2026-10-01T15:00:00.000Z",36710000,{"id":114,"title":115,"organizationName":116,"prefectureName":116,"publishedDate":46,"deadlineDate":117,"budget":118,"status":48},4433399,"公告日 令和8\u002F9\u002F4 【施工体制確認型総合評価方式案件(特別簡易型・技術資料の事後審査型)】 【建設キャリアアップシステム活用モデル工事(発注者指定型)案件】 【予定価格事後公表試行案件】 令和8年度防災安全・地 第 A010-11分0003号 一般県道高奈上三瀬線(高奈~長ケ)ほか1線道路改良ほか工事","三重県","2026-10-04T15:00:00.000Z",5858600,{"id":120,"title":121,"organizationName":116,"prefectureName":116,"publishedDate":46,"deadlineDate":122,"budget":123,"status":48},4433397,"公告日 令和8\u002F9\u002F4 令和8年度 第1号 交通安全施設撤去工事","2026-09-23T15:00:00.000Z",39600000,[125,131,137,143],{"title":126,"link":127,"date":128,"thumb":129,"cat":130},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":132,"link":133,"date":134,"thumb":135,"cat":136},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":138,"link":139,"date":140,"thumb":141,"cat":142},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":144,"link":145,"date":146,"thumb":147,"cat":148},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]