[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3090369":3,"bid-history-3090369":36,"bid-related-3090369":40,"union-latest":89},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":11,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":26,"documentUrls":29,"businessExperience":26,"localOffice":26,"securityRequirement":31,"qualifications":32,"certifications":33,"organization":34},3090369,"耳成山公園他施設更新工事",1321,29,2,14,1,"奈良県橿原市","奈良県","2026-07-30T15:00:00.000Z","2026-08-04T15:00:00.000Z",7822100,"closed",null,"土木","一般競争入札","工事","12:00:00","2026-08-26T15:00:00.000Z","・橿原市競争入札参加資格者名簿の土木一式工事・土木工事に登録されている建設業者\n・土木一式工事について建設業法に規定する特定又は一般建設業の許可を有すること\n・橿原市内に建設業法第3条に規定する本店を有すること\n・土木一式工事について過去10年以内に契約金額300万円以上の元請実績を有すること\n・経営事項審査結果（最新版）の総合評定値に主観点を加減した点数が600点以上700点未満であること\n・土木工事業に係る資格を有する主任技術者を施工期間中配置できること\n・橿原市入札参加資格停止措置要綱に基づく資格停止措置期間中でないこと\n・入札に参加する者の中で同一人物が代表者を兼ねていないこと","【案件概要】\n奈良県橿原市が耳成山公園他施設更新工事について、事後審査型条件付き一般競争入札を実施。対象地域は橿原市木原町・上品寺町地内。工事内容は遊戯施設整備、構造物撤去、公園施設等撤去・移設。設計金額は7,822,100円（税込）、最低制限基準価格は7,013,600円（税込）。週休2日工事試行要綱に基づき、工事現場における週休2日の確保を前提とした工事","。電子入札にて実施。\n\n【業務内容】\n- 遊戯施設整備工一式\n- 構造物撤去工一式\n- 公園施設等撤去・移設工一式\n\n【応募要件】\n- 橿原市競争入札参加資格者名簿の土木一式工事・土木工事に登録されている建設業者\n- 土木一式工事について建設業法に規定する特定又は一般建設業の許可を有すること\n- 橿原市内に建設業法第3条に規定する本店を有すること\n- 土木一式工事について過去10年以内に契約金額300万円以上の元請実績を有すること\n- 経営事項審査結果（最新版）の総合評定値に主観点を加減した点数が600点以上700点未満であること\n- 土木工事業に係る資格を有する主任技術者を施工期間中配置できること\n- 橿原市入札参加資格停止措置要綱に基づく資格停止措置期間中でないこと\n- 入札に参加する者の中で同一人物が代表者を兼ねていないこと\n- 地方自治法施行令第167条の4第1項各号に該当しないこと\n\n【工期・期間】\n契約日の翌日から令和9年3月5日まで。週休2日工事（受注者希望方式、4週8休以上を前提に積算）",true,"(redacted)","kkj",[30],{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":35,"parentId":17,"parentName":17,"bidInfoUrl":17},52,[37],{"year":38,"count":39},2026,47,{"sameOrganization":41,"samePrefecture":62,"similar":88},[42,46,50,54,58],{"id":43,"title":44,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":45,"status":16},3090372,"市道路改良工事(寺田町・慈明寺町)",50795800,{"id":47,"title":48,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":49,"status":16},3090371,"排水路改善工事(十市町・葛本町)",21202500,{"id":51,"title":52,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":53,"status":16},3090370,"小房南街区公園施設更新工事",9711900,{"id":55,"title":56,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":57,"status":16},3090368,"市道路舗装維持修繕工事8-8",10981300,{"id":59,"title":60,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":61,"status":16},3090367,"市道路舗装維持修繕工事8−9",9233400,[63,70,76,80,84],{"id":64,"title":65,"organizationName":66,"prefectureName":12,"publishedDate":67,"deadlineDate":68,"budget":17,"status":69},3885126,"R8長殿道路1号橋上部工事","国土交通省近畿地方整備局","2026-08-24T15:00:00.000Z","2026-09-28T15:00:00.000Z","active",{"id":71,"title":72,"organizationName":73,"prefectureName":12,"publishedDate":74,"deadlineDate":75,"budget":17,"status":69},3882979,"明日香村立認定こども園明日香幼稚園 備品購入事業(明日香幼稚園)","奈良県明日香村","2026-08-23T15:00:00.000Z","2026-09-06T15:00:00.000Z",{"id":77,"title":78,"organizationName":73,"prefectureName":12,"publishedDate":74,"deadlineDate":75,"budget":79,"status":69},3882564,"ネットワーク道路整備工事(橘地内)",16188700,{"id":81,"title":82,"organizationName":73,"prefectureName":12,"publishedDate":74,"deadlineDate":75,"budget":83,"status":69},3882563,"マンホール蓋修繕・改築計画策定業務委託(明日香村内)",6237000,{"id":85,"title":86,"organizationName":87,"prefectureName":12,"publishedDate":74,"deadlineDate":68,"budget":17,"status":69},3882562,"Adobeソフトウェアライセンスの更新及び購入 一式","独立行政法人国立文化財機構奈良文化財研究所",[],[90,96,102,108],{"title":91,"link":92,"date":93,"thumb":94,"cat":95},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":97,"link":98,"date":99,"thumb":100,"cat":101},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":103,"link":104,"date":105,"thumb":106,"cat":107},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":109,"link":110,"date":111,"thumb":112,"cat":113},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]