[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3074895":3,"bid-history-3074895":36,"bid-related-3074895":40,"union-latest":110},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":15,"documentUrls":29,"businessExperience":26,"localOffice":26,"securityRequirement":31,"qualifications":32,"certifications":33,"organization":34},3074895,"浸水対策重点地域緊急工事(一宮川第三調節池・連通管工その2)",1958,12,2,14,1,"千葉県 県土整備部 一宮川改修事務所","千葉県","2026-07-30T15:00:00.000Z","2026-09-03T15:00:00.000Z",null,"active","土木","一般競争入札","土木一式工事","二級河川一宮川水系 一宮川 長生郡長柄町 小榎本","17:00:00","2026-09-07T15:00:00.000Z","・千葉県建設工事等入札参加資格者名簿において土木一式工事の格付がA等級である者\n・建設業の許可を有する者\n・長生土木事務所、千葉土木事務所、山武土木事務所、夷隅土木事務所、君津土木事務所又は市原土木事務所管内に主たる営業所（本店）を有する者\n・過去15年間に、水門、樋門又は樋管工事を元請で施工した実績がある者\n・指名停止措置を受けていない者\n・手形交換所による取引停止処分を受けてから2年間を経過している者\n・入札日前6か月以内に手形・小切手を不渡りしていない者\n・経常JVで参加した場合、その構成員は参加することができない者\n・本案件に係る設計業務等の受託者又は当該受託者と資本若しくは人事面において関連がない者","【案件概要】\n千葉県知事の発注により、浸水対策重点地域緊急工事（一宮川第三調節池・連通管工その２）の一般競争入札を実施する。本工事は河川改修に伴い整備する一宮川第三調節池の中央部において、上池と下池をつなぐための連通管工を行うもので、工事箇所は長生郡長柄町小榎本である。入札方式は事後審査Ⅱ型による一般競争入札で、落札者決定方式は総合評価方式（特別簡易型Ａ）が","適用される。公告期間は令和８年７月３１日（金）から令和８年８月２７日（木）まで。\n\n【業務内容】\n- 一宮川第三調節池の中央部における上池と下池を連通する管工の施工\n- プレキャストボックスカルバート（B＝3.5m、H＝2.5m、L＝16m）の設置\n- 工事延長L＝30.6m、連通管工N＝1基\n- 河川土工に伴う床掘り、埋戻し、整地等の土工作業\n- 建設リサイクル法対象工事としての分別解体等及び特定建設資材廃棄物の再資源化\n\n【応募要件】\n- 千葉県建設工事等入札参加資格者名簿において土木一式工事の格付がA等級である者\n- 建設業の許可を有する者\n- 長生土木事務所、千葉土木事務所、山武土木事務所、夷隅土木事務所、君津土木事務所又は市原土木事務所管内に主たる営業所（本店）を有する者\n- 過去15年間に、水門、樋門又は樋管工事を元請で施工した実績がある者\n- 千葉県建設工事等入札参加資格者名簿に登載された者のうち、指名停止措置を受けていない者\n- 手形交換所による取引停止処分を受けてから2年間を経過している者であり、入札日前6か月以内に手形・小切手を不渡りしていない者\n- 経常JVで参加した場合、その構成員は参加することはできない\n- 本案件に係る設計業務等の受託者（株式会社建設技術研究所）又は当該受託者と資本・人事面において関連がない者\n\n【工期・期間】\n契約締結日から210日間の工期を要する。入札書受付期間は令和８年９月３日（木）から令和８年９月４日（金）午後５時まで。開札日は令和８年９月８日（火）午後2時30分。落札者決定通知日は令和８年９月２４日（木）予定。設計図書等の縦覧期間は令和８年７月３１日（金）から令和８年９月２日（水）まで。",true,"(redacted)","ppi-core-chiba",[30],{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":35,"parentId":15,"parentName":15,"bidInfoUrl":15},50,[37],{"year":38,"count":39},2026,16,{"sameOrganization":41,"samePrefecture":63,"similar":85},[42,46,51,55,60],{"id":43,"title":44,"organizationName":11,"prefectureName":12,"publishedDate":45,"deadlineDate":22,"budget":15,"status":16},3683759,"浸水対策重点地域緊急委託(一宮川第三調節池・樋門設備設計)","2026-08-20T15:00:00.000Z",{"id":47,"title":48,"organizationName":11,"prefectureName":12,"publishedDate":49,"deadlineDate":22,"budget":50,"status":16},3564635,"県単河川改良工事(大芝外・市道復旧工その2)","2026-08-17T15:00:00.000Z",49709000,{"id":52,"title":53,"organizationName":11,"prefectureName":12,"publishedDate":49,"deadlineDate":22,"budget":54,"status":16},3564634,"県単河川改良工事(茂原外・市道復旧工その3)",48587000,{"id":56,"title":57,"organizationName":11,"prefectureName":12,"publishedDate":58,"deadlineDate":59,"budget":15,"status":16},3550725,"浸水対策重点地域緊急委託(須田・三途川排水施設詳細設計)","2026-08-16T15:00:00.000Z","2026-09-01T15:00:00.000Z",{"id":61,"title":62,"organizationName":11,"prefectureName":12,"publishedDate":58,"deadlineDate":59,"budget":15,"status":16},3550724,"浸水対策重点地域緊急委託(須田・三途川地質調査)",[64,70,73,76,81],{"id":65,"title":66,"organizationName":67,"prefectureName":12,"publishedDate":68,"deadlineDate":69,"budget":15,"status":16},3893037,"千葉市稲毛区稲丘町11番地先外配水管整備工事に伴う設計業務委託","千葉県 企業局管理部 千葉水道事務所","2026-08-24T15:00:00.000Z","2026-09-08T15:00:00.000Z",{"id":71,"title":72,"organizationName":67,"prefectureName":12,"publishedDate":68,"deadlineDate":69,"budget":15,"status":16},3893036,"千葉市花見川区柏井町644番地先花見川水管橋外修繕工事に伴う設計業務委託",{"id":74,"title":75,"organizationName":67,"prefectureName":12,"publishedDate":68,"deadlineDate":69,"budget":15,"status":16},3893035,"千葉市中央区登戸1丁目6番地先外配水管整備工事に伴う設計業務委託",{"id":77,"title":78,"organizationName":79,"prefectureName":12,"publishedDate":68,"deadlineDate":80,"budget":15,"status":16},3892835,"県単河川総合開発委託(亀山ダム外資材価格等特別調査その2)","千葉県 県土整備部 亀山・片倉ダム管理事務所","2026-09-09T15:00:00.000Z",{"id":82,"title":83,"organizationName":79,"prefectureName":12,"publishedDate":68,"deadlineDate":84,"budget":15,"status":16},3892235,"県単河川総合開発委託(矢那川ダム堤体変位観測)","2026-09-02T15:00:00.000Z",[86,91,97,100,105],{"id":87,"title":88,"organizationName":11,"prefectureName":12,"publishedDate":89,"deadlineDate":90,"budget":15,"status":16},3567841,"浸水対策重点地域緊急工事(一宮川第三調節池・囲繞堤工)","2026-08-06T15:00:00.000Z","2026-09-10T15:00:00.000Z",{"id":92,"title":93,"organizationName":11,"prefectureName":12,"publishedDate":94,"deadlineDate":95,"budget":15,"status":96},2912564,"浸水対策重点地域緊急委託(一宮川第三調節池・旧堰撤去設計)","2026-07-26T15:00:00.000Z","2026-08-18T15:00:00.000Z","closed",{"id":98,"title":99,"organizationName":11,"prefectureName":12,"publishedDate":94,"deadlineDate":95,"budget":15,"status":96},2912563,"浸水対策重点地域緊急委託(一宮川第三調節池・掘削施工計画検討)",{"id":101,"title":102,"organizationName":11,"prefectureName":12,"publishedDate":103,"deadlineDate":104,"budget":15,"status":16},2769489,"浸水対策重点地域緊急工事(一宮川第三調節池・堰設置工)","2026-07-23T15:00:00.000Z","2026-08-27T15:00:00.000Z",{"id":106,"title":107,"organizationName":11,"prefectureName":12,"publishedDate":108,"deadlineDate":109,"budget":15,"status":96},2470569,"県単河川改良委託(一宮川第三調節池・伐竹)","2026-07-14T15:00:00.000Z","2026-07-27T15:00:00.000Z",[111,117,123,129],{"title":112,"link":113,"date":114,"thumb":115,"cat":116},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":118,"link":119,"date":120,"thumb":121,"cat":122},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":124,"link":125,"date":126,"thumb":127,"cat":128},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":130,"link":131,"date":132,"thumb":133,"cat":134},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]