[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3057891":3,"bid-history-3057891":35,"bid-related-3057891":39,"union-latest":91},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":8,"organizationName":10,"prefectureName":11,"publishedDate":12,"deadlineDate":13,"budget":14,"status":15,"department":16,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":14,"documentUrls":29,"businessExperience":31,"localOffice":31,"securityRequirement":31,"qualifications":32,"certifications":33,"organization":34},3057891,"舗装維持管理計画策定業務委託",1788,11,2,15,"神川町 (総合政策課) 総合政策課","埼玉県","2026-07-30T15:00:00.000Z","2026-08-26T15:00:00.000Z",null,"active","神川町総合政策課","舗装","指名競争入札","舗装維持管理計画策定業務","神川町内","17:00:00","2026-08-27T15:00:00.000Z","・埼玉県電子入札共同システムの利用要件を満たす事業者\n・神川町建設工事請負等指名競争入札参加者心得に従う事業者\n・過去1年間に贈賄などの不正行為により逮捕または工事事故を起こしていないこと\n・下請、労働及び資材購入等については、可能な限り神川町内の1社以上の業者に発注すること","【案件概要】\n神川町総合政策課が舗装維持管理計画策定業務の指名競争入札を実施。対象地域は神川町内。履行期間は契約締結日から令和9年3月15日まで。契約保証金は契約金の10%以上が必要。入札は埼玉県電子入札共同システムを利用して実施される。\n\n【業務内容】\n- 舗装維持管理計画の策定\n- 神川町内における舗装の維持管理に関する計画の作成\n\n【応募要件】\n- 埼","玉県電子入札共同システムの利用要件を満たす事業者\n- 神川町建設工事請負等指名競争入札参加者心得に従う事業者\n- 過去1年間に贈賄などの不正行為により逮捕または工事事故を起こしていないこと\n- 下請、労働及び資材購入等については、可能な限り神川町内の1社以上の業者に発注すること\n\n【工期・期間】\n契約締結日から令和9年3月15日まで\n\n【入札スケジュール】\n- 入札受付期間：令和8年8月26日（水）午前9時00分から8月27日（木）午後5時00分まで\n- 開札日時：令和8年8月28日（金）午前10時00分",true,"(redacted)","koukai-saitama",[30],{"url":27,"name":27},false,[],[],{"id":6,"name":10,"categoryId":14,"parentId":14,"parentName":14,"bidInfoUrl":14},[36],{"year":37,"count":38},2026,9,{"sameOrganization":40,"samePrefecture":58,"similar":83},[41,44,48,51,54],{"id":42,"title":43,"organizationName":10,"prefectureName":11,"publishedDate":12,"deadlineDate":13,"budget":14,"status":15},3057890,"神川町都市計画基礎調査業務委託",{"id":45,"title":46,"organizationName":10,"prefectureName":11,"publishedDate":47,"deadlineDate":14,"budget":14,"status":15},3057980,"水路改修工事(二ノ宮地内)(その1)","2026-07-29T15:00:00.000Z",{"id":49,"title":50,"organizationName":10,"prefectureName":11,"publishedDate":47,"deadlineDate":14,"budget":14,"status":15},3057979,"道路改良工事(町道11133号線)",{"id":52,"title":53,"organizationName":10,"prefectureName":11,"publishedDate":47,"deadlineDate":13,"budget":14,"status":15},3057978,"高牛山村生活安全対策工事(加古山沢)",{"id":55,"title":56,"organizationName":10,"prefectureName":11,"publishedDate":57,"deadlineDate":14,"budget":14,"status":15},1904283,"令和8年度阿久原16地籍調査(地籍簿・原図作成)業務委託","2026-06-25T15:00:00.000Z",[59,65,69,74,78],{"id":60,"title":61,"organizationName":62,"prefectureName":11,"publishedDate":63,"deadlineDate":64,"budget":14,"status":15},3891891,"御蔵中央通線(3工区)環境調査業務(R8)","さいたま市 建設局道路部 (建設局道路部)","2026-08-24T15:00:00.000Z","2026-08-25T15:00:00.000Z",{"id":66,"title":67,"organizationName":68,"prefectureName":11,"publishedDate":63,"deadlineDate":14,"budget":14,"status":15},3891890,"道路側溝台帳図修正業務(北建道安R8)","さいたま市 建設局北部建設事務所 道路安全対策課",{"id":70,"title":71,"organizationName":72,"prefectureName":11,"publishedDate":63,"deadlineDate":13,"budget":73,"status":15},3891889,"上尾特別支援学校フェンス設置工事","埼玉県 教育機関 上尾特別支援学校",2376000,{"id":75,"title":76,"organizationName":77,"prefectureName":11,"publishedDate":63,"deadlineDate":14,"budget":14,"status":15},3891888,"河川改修工事(中川・綾瀬川ブロック(大場川)河川整備計画変更検討業務委託)","埼玉県 県土整備部 総合治水事務所",{"id":79,"title":80,"organizationName":81,"prefectureName":11,"publishedDate":63,"deadlineDate":82,"budget":14,"status":15},3891860,"大型インクジェットプリンターの購入","埼玉県 産業労働部 産業技術総合センター","2026-09-03T15:00:00.000Z",[84],{"id":85,"title":86,"organizationName":87,"prefectureName":88,"publishedDate":89,"deadlineDate":47,"budget":14,"status":90},2459414,"舗装維持管理計画策定業務委託(1・2級幹線道路)","流山市 市長部局他 総務部財産活用課","千葉県","2026-07-14T15:00:00.000Z","closed",[92,98,104,110],{"title":93,"link":94,"date":95,"thumb":96,"cat":97},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":99,"link":100,"date":101,"thumb":102,"cat":103},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":105,"link":106,"date":107,"thumb":108,"cat":109},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":111,"link":112,"date":113,"thumb":114,"cat":115},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]