[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3057878":3,"bid-history-3057878":42,"bid-related-3057878":46,"union-latest":128},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":14,"qualificationText":22,"aiSummary":23,"aiSummaryGated":24,"aiSummaryTruncated":25,"sourceUrl":26,"dataSourceCode":27,"budgetTaxIncluded":15,"documentUrls":28,"businessExperience":25,"localOffice":25,"securityRequirement":37,"qualifications":38,"certifications":39,"organization":40},3057878,"26川越公園流水・飛び込みプール循環配管改修工事",1772,11,2,20,1,"埼玉県 都市整備部 大宮公園事務所","埼玉県","2026-07-30T15:00:00.000Z","2026-09-01T15:00:00.000Z",null,"active","管・空調","一般競争入札","管工事業、給排水設備工事","川越市大字池辺地内","10:00:00","・建設業法第3条の規定による管工事業の許可を受けていること\n・令和7・8年度埼玉県建設工事等競争入札参加資格者名簿に、管工事業でA級に登載されていること\n・令和6年度及び令和7年度に完成した埼玉県発注工事の工事成績点数が、いずれの年度においても65点以上であること\n・本店又は主たる営業所が埼玉県内にあること\n・1回の契約金額50百万円以上の給排水設備工事について、国又は地方公共団体等との請負契約による施工実績を平成28年4月1日以降に有すること（民間事業者との契約、埼玉県発注工事の1次下請負契約の実績も認める）\n・建設業法に規定された資格を有する主任技術者又は監理技術者を配置すること\n・配置予定技術者は、確認申請書提出期限日の3月以前から恒常的な雇用関係にあること\n・入札公告日において、健康保険、厚生年金保険及び雇用保険に事業主として加入していること\n・管工事業について、開札日から1年7月前の日以降の日を審査基準日とする経営事項審査を受けていること\n・電子入札システムで利用可能な電子証明書を取得し、利用者登録が完了していること\n・施行令第167条の4に該当しないこと\n・埼玉県財務規則第91条に該当しないこと\n・会社更生法又は民事再生法に基づき手続開始の申立てがなされていないこと（再審査を受けている場合を除く）\n・入札参加停止措置を受けていないこと\n・暴力団排除措置を受けていないこと\n・資本関係又は人的関係がある者同士の同一入札への参加をしていないこと\n・本工事に係る設計業務等の受託者（株式会社雙設備研究所）でないこと及び当該受託者と資本若しくは人事面において関連がないこと","【案件概要】\n埼玉県都市整備部大宮公園事務所が「26川越公園流水・飛び込みプール循環配管改修工事」の一般競争入札を実施。本件は一抜け方式により落札者を決定する案件で、2つの工事対象がある。工事場所は川越市大字池辺地内、工期は契約確定から令和9年4月28日まで。本工事は埼玉県営繕工事における「週休2日制モデル工事（現場閉所型）」の試行対象工事である。設計金額は","入札執行後に公表される予定。参加申請書受付期間は令和8年8月3日午前9時から8月28日午後5時までで、入札書提出期間は8月31日午前9時から9月2日午前10時まで。開札日時は令和8年9月2日（水）午前10時30分（工事－1）および同日午前11時30分（工事－2）。\n\n【業務内容】\n- 流水プール循環配管改修工事（一式）\n- 飛び込みプール循環配管改修工事（一式）\n- 配管の撤去・新設、給水設備、土工事、発生材処理等を含む\n- 造波プール循環配管改修工事（一抜け対象工事－2）\n\n【応募要件】\n・埼玉県建設工事等競争入札参加資格申請により、管工事業でA級に登載されていること\n・建設業法第3条の規定による管工事業の許可を受けていること\n・令和7・8年度埼玉県建設工事等競争入札参加資格者名簿に登載されていること\n・令和6年度及び令和7年度に完成した埼玉県発注工事の工事成績点数が、いずれの年度においても65点以上であること\n・本店又は主たる営業所が埼玉県内にあること\n・過去の施工実績：国又は地方公共団体等との請負契約により、1回の契約金額が50百万円以上の給排水設備工事を平成28年4月1日以降に完成させた実績があること。なお、民間事業者との請負契約による施工実績（令和3年4月1日以降）及び埼玉県発注工事の1次下請負契約による施工実績（令和3年4月1日以降）も認める\n・建設業法に規定された資格を有する主任技術者又は監理技術者を配置すること\n・配置予定技術者は、確認申請書提出期限日の3月以前から恒常的な雇用関係にあること\n・埼玉県発注工事の設計業務等の受託者は参加できないこと（株式会社雙設備研究所）\n・入札公告日において、健康保険、厚生年金保険及び雇用保険に事業主として加入していること\n・経営事項審査（管工事業）を、開札日から1年7月前の日以降の日を審査基準日として受けていること\n・電子入札システムで利用可能な電子証明書を取得し、利用者登録が完了していること\n・施行令第167条の4の規定に該当しないこと、および埼玉県財務規則第91条に該当しないこと\n・会社更生法又は民事再生法に基づき手続開始の申立てがなされていないこと（ただし再審査を受けている場合は除く）\n・入札参加停止措置及び暴力団排除措置を受けていないこと\n・資本関係又は人的関係がある者（同族企業）同士の同一入札への参加制限に該当しないこと\n\n【工期・期間】\n余裕期間は契約締結日から工期始期の前日までの期間。現場施工期間は令和8年10月5日（月）から令和9年4月28日（水）まで。ただし、プール期間（契約日～令和8年10月4日まで）および小江戸川越ハーフマラソン準備・片付け・実施期間（11月27日～11月30日）は作業不可。猛暑による作業不能日数として2日間を見込んでいる。",true,"(redacted)","koukai-saitama",[29,30,31,32,33,34,35,36],{"url":26,"name":26},{"url":26,"name":26},{"url":26,"name":26},{"url":26,"name":26},{"url":26,"name":26},{"url":26,"name":26},{"url":26,"name":26},{"url":26,"name":26},false,[],[],{"id":6,"name":11,"categoryId":41,"parentId":15,"parentName":15,"bidInfoUrl":15},52,[43],{"year":44,"count":45},2026,6,{"sameOrganization":47,"samePrefecture":68,"similar":94},[48,53,58,61,65],{"id":49,"title":50,"organizationName":11,"prefectureName":12,"publishedDate":51,"deadlineDate":52,"budget":15,"status":16},3526839,"26川越公園多目的プール循環配管改修工事","2026-08-13T15:00:00.000Z","2026-09-06T15:00:00.000Z",{"id":54,"title":55,"organizationName":11,"prefectureName":12,"publishedDate":56,"deadlineDate":57,"budget":15,"status":16},3531003,"大宮公園清掃・警備業務委託","2026-08-06T15:00:00.000Z","2026-09-15T15:00:00.000Z",{"id":59,"title":60,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},3057877,"26川越公園造波プール循環配管改修工事",{"id":62,"title":63,"organizationName":11,"prefectureName":12,"publishedDate":64,"deadlineDate":15,"budget":15,"status":16},3057904,"公園等施設補修工事(権現堂公園樹木点検診断業務委託)","2026-07-29T15:00:00.000Z",{"id":66,"title":67,"organizationName":11,"prefectureName":12,"publishedDate":64,"deadlineDate":15,"budget":15,"status":16},3057903,"公園等施設補修工事(久喜菖蒲公園外樹木点検診断業務委託)",[69,75,79,85,89],{"id":70,"title":71,"organizationName":72,"prefectureName":12,"publishedDate":73,"deadlineDate":74,"budget":15,"status":16},3891891,"御蔵中央通線(3工区)環境調査業務(R8)","さいたま市 建設局道路部 (建設局道路部)","2026-08-24T15:00:00.000Z","2026-08-25T15:00:00.000Z",{"id":76,"title":77,"organizationName":78,"prefectureName":12,"publishedDate":73,"deadlineDate":15,"budget":15,"status":16},3891890,"道路側溝台帳図修正業務(北建道安R8)","さいたま市 建設局北部建設事務所 道路安全対策課",{"id":80,"title":81,"organizationName":82,"prefectureName":12,"publishedDate":73,"deadlineDate":83,"budget":84,"status":16},3891889,"上尾特別支援学校フェンス設置工事","埼玉県 教育機関 上尾特別支援学校","2026-08-26T15:00:00.000Z",2376000,{"id":86,"title":87,"organizationName":88,"prefectureName":12,"publishedDate":73,"deadlineDate":15,"budget":15,"status":16},3891888,"河川改修工事(中川・綾瀬川ブロック(大場川)河川整備計画変更検討業務委託)","埼玉県 県土整備部 総合治水事務所",{"id":90,"title":91,"organizationName":92,"prefectureName":12,"publishedDate":73,"deadlineDate":93,"budget":15,"status":16},3891860,"大型インクジェットプリンターの購入","埼玉県 産業労働部 産業技術総合センター","2026-09-03T15:00:00.000Z",[95,103,110,117,122],{"id":96,"title":97,"organizationName":98,"prefectureName":99,"publishedDate":100,"deadlineDate":101,"budget":102,"status":16},3883135,"水族館整備工事(アザラシプール柵改修工事)","北海道稚内市","北海道","2026-08-23T15:00:00.000Z","2026-08-30T15:00:00.000Z",9911000,{"id":104,"title":105,"organizationName":106,"prefectureName":107,"publishedDate":100,"deadlineDate":108,"budget":109,"status":16},3882654,"08市ス第85号国府B&G・清見B&Gプール照明LED改修工事","岐阜県高山市","岐阜県","2026-09-07T15:00:00.000Z",23232000,{"id":111,"title":112,"organizationName":113,"prefectureName":114,"publishedDate":115,"deadlineDate":116,"budget":15,"status":16},3746529,"草牟田小学校プール新築その他本体工事請負契約に係る総合評価落札方式による事後審査型制限付き一般競争入札(公告)","鹿児島県鹿児島市","鹿児島県","2026-08-20T15:00:00.000Z","2026-09-16T15:00:00.000Z",{"id":118,"title":119,"organizationName":120,"prefectureName":121,"publishedDate":115,"deadlineDate":93,"budget":15,"status":16},3744686,"旧吉島屋内プールほか1施設解体工事実施設計業務","広島県広島市","広島県",{"id":123,"title":124,"organizationName":125,"prefectureName":114,"publishedDate":126,"deadlineDate":14,"budget":127,"status":16},3692509,"平和公園レジャープールろ過ポンプ配管改修工事(R8)【再公告】","鹿児島県鹿屋市","2026-08-19T15:00:00.000Z",3447400,[129,135,141,147],{"title":130,"link":131,"date":132,"thumb":133,"cat":134},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":136,"link":137,"date":138,"thumb":139,"cat":140},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":142,"link":143,"date":144,"thumb":145,"cat":146},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":148,"link":149,"date":150,"thumb":151,"cat":152},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]