[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3048296":3,"bid-history-3048296":56,"bid-related-3048296":59,"union-latest":111},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":21,"deadlineTime":22,"openingDate":23,"qualificationText":24,"aiSummary":25,"aiSummaryGated":26,"aiSummaryTruncated":27,"sourceUrl":28,"dataSourceCode":29,"budgetTaxIncluded":15,"documentUrls":30,"businessExperience":27,"localOffice":27,"securityRequirement":50,"qualifications":51,"certifications":53,"organization":54},3048296,"小勝治山工事",660,46,2,14,1,"林野庁九州森林管理局鹿児島森林管理署","鹿児島県","2026-07-29T15:00:00.000Z","2026-08-13T15:00:00.000Z",null,"closed","鹿児島森林管理署 総務グループ","土木","一般競争入札","森林土木工事（山腹工）","鹿児島県鹿児島市","15:00:00","2026-09-08T15:00:00.000Z","・九州森林管理局における土木一式工事に係るC又はD等級の一般競争参加資格の認定を受けていること\n・平成23年度以降公告日の前日までに元請として、治山関係事業における渓間工事若しくは山腹工事、林道の新設工事若しくは改良工事若しくは災害復旧工事、保安林管理道の新設工事若しくは改良工事若しくは災害復旧工事、又は林道規定に定める自動車道2級以上に相当する作業道の新設工事のいずれかの森林土木工事を施工した実績を有すること\n・技術士（建設部門又は森林部門）、2級土木施工管理技士、2級建設機械施工技士又は林業技士（森林土木部門）以上の資格を有する主任（監理）技術者を配置できること\n・主任（監理）技術者は平成23年度以降公告日の前日までに、森林土木工事において主任（監理）技術者、主任（監理）技術者の下での工程管理・出来形管理・品質管理・安全管理のうち2以上の職務経験、又は現場代理人の経験を有すること\n・森林管理局長等が発注した森林土木工事で過去3年間（令和5年4月1日から令和8年3月31日まで）に完成した工事で工事成績評定を受けた工事がある場合、評定点合計の平均が65点以上であること\n・九州森林管理局管内の市町村に本店又は支店若しくは営業所が所在すること\n・健康保険法第48条、厚生年金保険法第27条、雇用保険法第7条の規定による届出の義務を履行していること\n・暴力団員が実質的に経営を支配する建設業者でないこと\n・入札に参加しようとする者の間に資本関係又は人的関係がないこと（資本関係又は人的関係がある者のすべてが共同企業体の代表者以外の構成員である場合を除く）\n・競争参加資格確認申請書等の提出期限から開札の時までの期間に指名停止を受けていないこと\n・下請契約において社会保険等未加入建設業者を相手方にしないこと（適用除外者を除く）","【案件概要】\n林野庁九州森林管理局鹿児島森林管理署が小勝治山工事の一般競争入札（政府調達対象外）を実施します。本工事は鹿児島県大島郡宇検村小勝地内の水源かん養保安林において山腹工0.06haを施工するもので、施工体制確認型総合評価落札方式（簡易型）により落札者を決定します。電子入札システム及び電子契約システムの試行対象案件であり、週休2日制の促進と省人化建設","機械の試行も含まれています。契約締結日の翌日から令和9年3月19日までが工期で、令和8年10月8日までに工事着手が必須です。\n\n【業務内容】\n- 山腹工事（0.06ha）の施工\n- 施工体制確認型総合評価落札方式に基づく施工能力等の評価対応\n- 週休2日制（通期必須、月単位での取り組み）の実施\n- 省人化建設機械（チルトローテータ）を用いた施工（受注者希望）\n- ICT活用工事への対応（受注者希望型）\n- 分別解体及び特定建設資材廃棄物の再資源化等の実施\n- 3次元データを活用した施工管理、出来形管理、検査\n- 工事成績評定対象となる施工体制の確保と品質管理\n\n【応募要件】\n・「予算決算及び会計令」第70条及び第71条の規定に該当しないこと\n・九州森林管理局における土木一式工事に係るC又はD等級の一般競争参加資格の認定を受けていること\n・平成23年度以降公告日前日までに元請として森林土木工事（治山関係事業における渓間工事・山腹工事、林道・保安林管理道の新設・改良・災害復旧工事、または作業道の新設工事）を施工した実績を有すること（共同企業体の場合は出資比率20%以上）\n・森林管理局長等が発注した工事の場合、工事成績評定点合計が65点以上であること\n・技術士（建設部門又は森林部門）、2級土木施工管理技士、2級建設機械施工技士又は林業技士（森林土木部門）以上の資格を有する主任(監理)技術者を配置可能であること\n・主任(監理)技術者が平成23年度以降、森林土木工事における所定の職務経験を有すること\n・監理技術者にあっては、監理技術者資格者証及び監理技術者講習修了証を有すること\n・申請書提出期限から開札時までの期間に指名停止を受けていないこと\n・過去3年間（令和5年4月1日～令和8年3月31日）に完成した森林土木工事の工事成績評定を受けた場合、評定点合計の平均が65点以上であること\n・本工事の設計業務等の受託者又は当該受託者と資本・人事面で関連のない建設業者であること\n・入札参加者間に資本関係又は人的関係がないこと（共同企業体の代表者以外の構成員である場合を除く）\n・建設業法に基づく本店又は支店・営業所が九州森林管理局管内の市町村に所在すること\n・暴力団員が実質的に経営を支配する建設業者でないこと\n・健康保険法、厚生年金保険法、雇用保険法に基づく届出義務を履行していること\n・下請契約において社会保険等未加入建設業者を相手方としないこと\n\n【工期・期間】\n契約締結日の翌日から令和9年3月19日まで（工期は「4週8休」を標準として設定）。令和8年10月8日までに工事着手期限に達すること。\n\n【入札スケジュール】\n資格確認申請書提出期間：令和8年7月31日～8月14日（最終日は15時まで）\n入札説明書配布期間：令和8年7月30日～9月8日\n入札締切：令和8年9月9日9時30分\n開札：令和8年9月9日9時35分",true,"(redacted)","kkj",[31,32,33,34,35,36,37,38,39,40,41,42,43,44,45,46,47,48,49],{"url":28,"name":28},{"url":28,"name":28},{"url":28,"name":28},{"url":28,"name":28},{"url":28,"name":28},{"url":28,"name":28},{"url":28,"name":28},{"url":28,"name":28},{"url":28,"name":28},{"url":28,"name":28},{"url":28,"name":28},{"url":28,"name":28},{"url":28,"name":28},{"url":28,"name":28},{"url":28,"name":28},{"url":28,"name":28},{"url":28,"name":28},{"url":28,"name":28},{"url":28,"name":28},false,[52],3,[],{"id":6,"name":11,"categoryId":55,"parentId":15,"parentName":15,"bidInfoUrl":15},140,[57],{"year":58,"count":9},2026,{"sameOrganization":60,"samePrefecture":83,"similar":106},[61,64,69,74,79],{"id":62,"title":63,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},3048295,"桜島地区治山工事(西道川第2支流第3分流)",{"id":65,"title":66,"organizationName":11,"prefectureName":12,"publishedDate":67,"deadlineDate":68,"budget":15,"status":16},2772075,"令和8年度 鹿児島森林管理署官用自動車点検等業務請負(17台)","2026-07-22T15:00:00.000Z","2026-08-19T15:00:00.000Z",{"id":70,"title":71,"organizationName":11,"prefectureName":12,"publishedDate":72,"deadlineDate":15,"budget":15,"status":73},2588070,"入札公告の取り止めに関する公告(小勝治山工事)","2026-07-16T15:00:00.000Z","active",{"id":75,"title":76,"organizationName":11,"prefectureName":12,"publishedDate":77,"deadlineDate":78,"budget":15,"status":16},2442633,"建設機械借上単価契約(姶良地区 川西国有林外)","2026-07-13T15:00:00.000Z","2026-08-04T15:00:00.000Z",{"id":80,"title":81,"organizationName":11,"prefectureName":12,"publishedDate":82,"deadlineDate":78,"budget":15,"status":16},2297961,"令和8年度鹿児島森林管理署収穫調査委託(官行造林)","2026-07-09T15:00:00.000Z",[84,90,93,98,102],{"id":85,"title":86,"organizationName":87,"prefectureName":12,"publishedDate":88,"deadlineDate":89,"budget":15,"status":73},3882948,"令和8年度交換による自動車1台","国土交通省九州地方整備局鹿児島港湾・空港整備事務所","2026-08-23T15:00:00.000Z","2026-09-27T15:00:00.000Z",{"id":91,"title":86,"organizationName":92,"prefectureName":12,"publishedDate":88,"deadlineDate":89,"budget":15,"status":73},3882947,"国土交通省",{"id":94,"title":95,"organizationName":96,"prefectureName":12,"publishedDate":97,"deadlineDate":15,"budget":15,"status":73},3747968,"入札公告の取りやめに関する公告(日平(飯ヶ谷)林道災害復旧工事)","林野庁九州森林管理局大隅森林管理署","2026-08-20T15:00:00.000Z",{"id":99,"title":100,"organizationName":101,"prefectureName":12,"publishedDate":97,"deadlineDate":15,"budget":15,"status":73},3747964,"20260821%20hune65%20bessi.pdf","海上保安庁第十管区海上保安本部",{"id":103,"title":104,"organizationName":101,"prefectureName":12,"publishedDate":97,"deadlineDate":105,"budget":15,"status":73},3746530,"20メートル型巡視艇定期修理(8−6)","2026-09-09T15:00:00.000Z",[107],{"id":108,"title":5,"organizationName":11,"prefectureName":12,"publishedDate":109,"deadlineDate":110,"budget":15,"status":16},1572793,"2026-06-18T15:00:00.000Z","2026-07-02T15:00:00.000Z",[112,118,124,130],{"title":113,"link":114,"date":115,"thumb":116,"cat":117},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":119,"link":120,"date":121,"thumb":122,"cat":123},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":125,"link":126,"date":127,"thumb":128,"cat":129},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":131,"link":132,"date":133,"thumb":134,"cat":135},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]