[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3046131":3,"bid-history-3046131":32,"bid-related-3046131":36,"union-latest":87},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":14,"status":15,"department":11,"bidCategoryName":16,"bidTypeName":17,"categoryText":18,"regionText":19,"deadlineTime":14,"openingDate":14,"qualificationText":14,"aiSummary":20,"aiSummaryGated":21,"aiSummaryTruncated":22,"sourceUrl":23,"dataSourceCode":24,"budgetTaxIncluded":14,"documentUrls":25,"businessExperience":27,"localOffice":27,"securityRequirement":27,"qualifications":28,"certifications":29,"organization":30},3046131,"高知工業高専専攻科棟空調設備更新工事(現場説明書).zip",470,39,2,20,6,"独立行政法人国立高等専門学校機構高知工業高等専門学校","高知県","2026-07-29T15:00:00.000Z",null,"active","管・空調","その他・不明","工事","高知県南国市","【案件概要】\n独立行政法人国立高等専門学校機構高知工業高等専門学校が、専攻科棟空調設備更新工事を実施する。本工事は高知県南国市に位置する同校の老朽化した空調設備を更新するもので、教育環境の改善と施設の機能維持を目的としている。公告日は2026年7月30日。詳細な工事仕様書・現場説明書がzipファイル形式で提供されている。\n\n【業務内容】\n- 高知工業高等専門","学校専攻科棟の空調設備更新工事\n- 既存空調設備の撤去・廃棄\n- 新規空調設備の設計・施工・据付\n- 関連する配管・配線工事",true,"(redacted)","kkj",[26],{"url":23,"name":23},false,[],[],{"id":6,"name":11,"categoryId":31,"parentId":14,"parentName":14,"bidInfoUrl":14},320,[33],{"year":34,"count":35},2026,5,{"sameOrganization":37,"samePrefecture":57,"similar":79},[38,41,45,50,53],{"id":39,"title":40,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":14,"status":15},3046132,"高知工業高専専攻科棟空調設備更新工事(設計図).zip",{"id":42,"title":43,"organizationName":11,"prefectureName":12,"publishedDate":44,"deadlineDate":14,"budget":14,"status":15},2773869,"・入札説明書別記様式.zip","2026-07-22T15:00:00.000Z",{"id":46,"title":47,"organizationName":11,"prefectureName":12,"publishedDate":44,"deadlineDate":48,"budget":14,"status":49},2770296,"【入札公告】高知工業高専専攻科棟空調設備更新工事.pdf","2026-08-04T15:00:00.000Z","closed",{"id":51,"title":52,"organizationName":11,"prefectureName":12,"publishedDate":44,"deadlineDate":14,"budget":14,"status":15},2770295,"・高知工業高専専攻科棟空調設備更新工事 入札説明書等一式.zip",{"id":54,"title":55,"organizationName":11,"prefectureName":12,"publishedDate":56,"deadlineDate":14,"budget":14,"status":49},1960923,"令和8年度「第2次」高知工業高等専門学校における発注の見通しの公表について(工事).pdf","2026-06-30T15:00:00.000Z",[58,64,68,71,75],{"id":59,"title":60,"organizationName":61,"prefectureName":12,"publishedDate":62,"deadlineDate":63,"budget":14,"status":15},4424163,"森林環境保全整備事業(大谷鹿伏山2003保育間伐【活用型】)","林野庁四国森林管理局安芸森林管理署","2026-09-03T15:00:00.000Z","2026-10-06T15:00:00.000Z",{"id":65,"title":66,"organizationName":12,"prefectureName":12,"publishedDate":62,"deadlineDate":67,"budget":14,"status":15},4424162,"国道321号(松田川橋)橋梁修繕工事(道老対(橋梁) 第1-11-9号)(令和8年9月4日公告)","2026-09-27T15:00:00.000Z",{"id":69,"title":70,"organizationName":12,"prefectureName":12,"publishedDate":62,"deadlineDate":67,"budget":14,"status":15},4424161,"大西ノ川 河川災害復旧工事(7災 第81号)(令和8年9月4日公告)",{"id":72,"title":73,"organizationName":12,"prefectureName":12,"publishedDate":62,"deadlineDate":74,"budget":14,"status":15},4424160,"高知港海岸(港町地区)高潮対策工事(港高潮(広域)第6-22号)","2026-09-13T15:00:00.000Z",{"id":76,"title":77,"organizationName":78,"prefectureName":12,"publishedDate":62,"deadlineDate":63,"budget":14,"status":15},4424159,"【安芸森林管理署】森林環境保全整備事業(大谷鹿伏山2003保育間伐【活用型】)","農林水産省",[80],{"id":81,"title":82,"organizationName":83,"prefectureName":84,"publishedDate":85,"deadlineDate":86,"budget":14,"status":49},1900724,"【現場説明書に修正あり】【工事費内訳書に修正あり】【質問回答書2あり】【質問回答書あり、 入札時積算数量書に修正あり】【CCUS(推奨)】令和8年度第1112-ア-15号 小林秀峰高校第54棟(屋内運動場)床改修工事","宮崎県 総務部 営繕課(令和7年度から)","宮崎県","2026-06-15T15:00:00.000Z","2026-07-06T15:00:00.000Z",[88,94,100,106],{"title":89,"link":90,"date":91,"thumb":92,"cat":93},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":95,"link":96,"date":97,"thumb":98,"cat":99},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":101,"link":102,"date":103,"thumb":104,"cat":105},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":107,"link":108,"date":109,"thumb":110,"cat":111},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]