[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-3008614":3,"bid-history-3008614":36,"bid-related-3008614":40,"union-latest":110},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":15,"documentUrls":29,"businessExperience":31,"localOffice":26,"securityRequirement":31,"qualifications":32,"certifications":33,"organization":34},3008614,"藤五郎池地区ため池改修工事その3",2681,28,2,14,1,"兵庫県 北播磨県民局 加古川流域土地改良事務所","兵庫県","2026-07-29T15:00:00.000Z","2026-08-26T15:00:00.000Z",null,"closed","土木","一般競争入札","一般土木","加東市高岡","12:00:00","2026-08-27T15:00:00.000Z","・兵庫県建設工事入札参加資格者名簿に登載されている者\n・入札参加資格工種：一般土木工事\n・加東市又は小野市内に建設業の許可を受けた主たる営業所を有すること\n・格付等級がB又はC等級であること\n・技術・社会貢献評価数値の合計点数が60点以上であること\n・土木工事業に係る建設業の許可を有すること\n・建設業法第26条による主任技術者又は監理技術者として適正に配置でき、直接的かつ恒常的な雇用関係（入札参加申込期限日以前に3か月以上）がある者であること\n・本件工事は建設業法第26条第3項第2号の規定の適用を受ける監理技術者の配置を認める工事\n・単独企業による応募（共同企業体不可）","【案件概要】\n兵庫県北播磨県民局が、藤五郎池地区ため池改修工事その3を制限付き一般競争入札（事後審査型）で実施する。工事場所は加東市高岡で、堤体工、洪水吐工、2号取水施設工、付帯工、仮設工を実施する。工期は令和9年5月28日限りで、令和8年9月上旬に契約締結予定。年割支払を採用し、令和8年度61%、令和9年度39%の支払予定。週休2日制度の対象工事であり、I","CT活用を希望する場合は複数の施工プロセスを原則選択。\n\n【業務内容】\n- 堤体工 1.0式\n- 洪水吐工 1.0式\n- 2号取水施設工 1.0式\n- 付帯工 1.0式\n- 仮設工 1.0式\n- 3次元起工測量、3次元設計データ作成、ICT建設機械による施工、3次元出来形管理等施工管理、納品（ICT活用を希望する場合）\n\n【応募要件】\n- 兵庫県建設工事入札参加資格者名簿に登載されている者であること\n- 入札参加資格工種：一般土木工事\n- 加東市又は小野市内に建設業の許可を受けた主たる営業所を有すること\n- 格付等級がB又はC等級であること\n- 技術・社会貢献評価数値の合計点数が60点以上であること。ただし、兵庫県発注工事成績を有しない者は、国土交通省近畿地方整備局等発注の工事成績（令和2年度から令和6年度に完成したもので施工場所全部又は一部が県内であるもの等）を1件限り申請できる場合あり\n- 同種工事の施工実績要件：無\n- 土木工事業に係る建設業の許可を有すること\n- 建設業法第26条による主任技術者又は監理技術者を適正に配置できること。直接的かつ恒常的な雇用関係（入札参加申込期限日以前に3か月以上）があること\n- 本件工事は建設業法第26条第3項第2号の規定の適用を受ける監理技術者の配置を認める工事\n- 入札保証金：不要\n- 単独企業による応募（共同企業体不可）\n\n【工期・期間】\n契約締結予定日：令和8年9月上旬\n工期：令和9年5月28日限り\n履行期間中、年割支払として令和8年度61%、令和9年度39%の支払予定\n\n【入札手続スケジュール】\n- 建設工事請負契約書等閲覧：令和8年7月30日（木）～8月25日（火）\n- 設計図書交付：令和8年7月30日（木）～8月25日（火）\n- 入札参加申込書受付：令和8年7月30日（木）～8月10日（月）\n- 質問書受付：令和8年7月31日（金）～8月18日（火）\n- 回答書閲覧：令和8年8月21日（金）～8月25日（火）\n- 入札書受付：令和8年8月26日（水）～8月27日（木）正午まで\n- 工事費内訳書受付：令和8年8月26日（水）～8月27日（木）\n- 開札：令和8年8月28日（金）午前10時30分\n\n【その他】\n最低制限価格を設定。設計業務受託者はNTCコンサルタンツ株式会社。電子入札システムを使用。落札金額が200万円（消費税込）を超える場合は、暴力団排除、労働条件確保、社会保険加入対策に関する誓約書を提出すること。",true,"(redacted)","ppi-core-hyogo",[30],{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":35,"parentId":15,"parentName":15,"bidInfoUrl":15},50,[37],{"year":38,"count":39},2026,18,{"sameOrganization":41,"samePrefecture":61,"similar":84},[42,48,51,54,57],{"id":43,"title":44,"organizationName":11,"prefectureName":12,"publishedDate":45,"deadlineDate":46,"budget":15,"status":47},4256834,"草谷川I期地区用水路修繕工事その2","2026-09-01T15:00:00.000Z","2026-09-16T15:00:00.000Z","active",{"id":49,"title":50,"organizationName":11,"prefectureName":12,"publishedDate":45,"deadlineDate":46,"budget":15,"status":47},4248407,"大門大池地区ため池改修工事その1",{"id":52,"title":53,"organizationName":11,"prefectureName":12,"publishedDate":45,"deadlineDate":46,"budget":15,"status":47},4248406,"二番目池地区ため池改修工事その1",{"id":55,"title":56,"organizationName":11,"prefectureName":12,"publishedDate":22,"deadlineDate":15,"budget":15,"status":47},4009337,"七ツヶ谷池地区ため池改修工事その1",{"id":58,"title":59,"organizationName":11,"prefectureName":12,"publishedDate":22,"deadlineDate":60,"budget":15,"status":47},4009336,"在田南部地区笹倉工区その2工事","2026-09-23T15:00:00.000Z",[62,67,73,76,79],{"id":63,"title":64,"organizationName":65,"prefectureName":12,"publishedDate":66,"deadlineDate":15,"budget":15,"status":47},2954301,"播磨中継加圧ポンプ場電気設備更新工事","兵庫県 企業庁 利水事務所","2027-03-24T15:00:00.000Z",{"id":68,"title":69,"organizationName":70,"prefectureName":12,"publishedDate":71,"deadlineDate":72,"budget":15,"status":47},4439147,"第2工場排水処理設備塔類保守点検業務委託","尼崎市","2026-09-03T15:00:00.000Z","2026-09-24T15:00:00.000Z",{"id":74,"title":75,"organizationName":70,"prefectureName":12,"publishedDate":71,"deadlineDate":72,"budget":15,"status":47},4433338,"尼崎市遊具点検業務委託",{"id":77,"title":78,"organizationName":70,"prefectureName":12,"publishedDate":71,"deadlineDate":60,"budget":15,"status":47},4433327,"燃料油(令和8年10月・11月分)",{"id":80,"title":81,"organizationName":82,"prefectureName":12,"publishedDate":71,"deadlineDate":83,"budget":15,"status":47},4433322,"軽4輪車(バン型EV車)借上","西宮市","2026-09-29T15:00:00.000Z",[85,92,99,103,106],{"id":86,"title":87,"organizationName":88,"prefectureName":89,"publishedDate":71,"deadlineDate":90,"budget":91,"status":47},4426994,"流第8号 柳谷下池改修工事(9月30日開札)","愛媛県新居浜市","愛媛県","2026-09-28T15:00:00.000Z",19680000,{"id":93,"title":94,"organizationName":95,"prefectureName":96,"publishedDate":71,"deadlineDate":97,"budget":98,"status":47},4424002,"室谷池改修工事","広島県府中市","広島県","2026-09-27T15:00:00.000Z",15237000,{"id":100,"title":101,"organizationName":95,"prefectureName":96,"publishedDate":71,"deadlineDate":97,"budget":102,"status":47},4424001,"丸山上池改修工事",70900000,{"id":104,"title":105,"organizationName":11,"prefectureName":12,"publishedDate":22,"deadlineDate":15,"budget":15,"status":47},4009335,"大村皿池地区ため池改修工事その1",{"id":107,"title":108,"organizationName":11,"prefectureName":12,"publishedDate":109,"deadlineDate":15,"budget":15,"status":47},3918522,"野々池地区ため池改修工事その6","2026-08-25T15:00:00.000Z",[111,117,123,129],{"title":112,"link":113,"date":114,"thumb":115,"cat":116},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":118,"link":119,"date":120,"thumb":121,"cat":122},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":124,"link":125,"date":126,"thumb":127,"cat":128},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":130,"link":131,"date":132,"thumb":133,"cat":134},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]