[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-2966652":3,"bid-history-2966652":42,"bid-related-2966652":46,"union-latest":116},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":11,"publishedDate":12,"deadlineDate":13,"budget":14,"status":15,"department":16,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":11,"deadlineTime":20,"openingDate":21,"qualificationText":22,"aiSummary":23,"aiSummaryGated":24,"aiSummaryTruncated":25,"sourceUrl":26,"dataSourceCode":27,"budgetTaxIncluded":14,"documentUrls":28,"businessExperience":25,"localOffice":25,"securityRequirement":37,"qualifications":38,"certifications":39,"organization":40},2966652,"こうち動物愛護センター(仮称)空調設備工事(債機第8-7号)",138,39,2,20,1,"高知県","2026-07-27T15:00:00.000Z","2026-08-06T15:00:00.000Z",null,"closed","高知県健康政策部薬務衛生課","管・空調","一般競争入札","工事","17:00:00","2026-09-06T15:00:00.000Z","・令和8年度高知県建設工事競争入札参加資格で管工事A等級、総合点数790点以上\n・高知県内に建設業法第3条第1項に規定する主たる営業所を置く者\n・平成23年度以降に元請として完成・引渡しが完了した工事の施工実績を有すること\n・工事の発注者が国又は地方公共団体等であること\n・受注形態が単体又は出資比率20%以上の共同企業体であること\n・最終請負金額（税込）が4,500万円以上であること\n・建築物に係る管工事であること\n・施工場所が高知県内であること\n・1級管工事施工管理技士、2級管工事施工管理技士又はこれらと同等以上の資格を有する主任技術者又は監理技術者を配置できること\n・監理技術者にあっては1級管工事施工管理技士又はこれと同等以上の資格を有し、監理技術者資格者証及び監理技術者講習修了証を有する者\n・公告日以前に申請者に採用され、申請時において引き続き雇用されている者（専任配置が必要な場合は申請時において3か月以上雇用）\n・建設業法第7条第1号若しくは第15条第1号に規定される経営業務の管理責任者でないこと\n・配置予定技術者が同種工事（国又は地方公共団体等発注、最終請負金額税込4,500万円以上、建築物に係る管工事）への従事実績を有し、従事期間が工期の半分を超えていること","【案件概要】\n高知県が実施する「こうち動物愛護センター（仮称）空調設備工事」の一般競争入札。高知県高知市高須地内に新築するセンター施設（事務所・畜舎棟：延べ面積1,495.79㎡、自転車駐車場：延べ面積32.4㎡）に対する空調設備工事一式を対象。工事期間は341日（余裕期間を含み、工事開始日は令和8年10月16日）。入札方式は紙入札による事前審査方式で、最低","制限価格を設定。予定価格は事後公表。\n\n【業務内容】\n- こうち動物愛護センター（仮称）新築工事に伴う空調設備工事\n- 事務所・畜舎棟（木造一部鉄筋コンクリート造平屋建）の空調設備設計・施工\n- 自転車駐車場等の空調関連設備工事\n\n【応募要件】\n- 令和8年度高知県建設工事競争入札参加資格で管工事A等級、総合点数790点以上\n- 高知県内に主たる営業所を置くこと\n- 平成23年度以降、元請として完成・引渡し完了した同種工事の施工実績を有すること（国又は地方公共団体等の発注、最終請負金額税込4,500万円以上、建築物に係る管工事、高知県内施工）\n- 1級又は2級管工事施工管理技士、若しくは同等以上の資格を持つ主任技術者または監理技術者を配置できること\n- 配置技術者は公告日以前に採用され、申請時に引き続き雇用されていること（専任配置が必要な場合は申請時に3か月以上雇用）\n- 建設業法第7条第1号若しくは第15条第1号に規定される経営業務の管理責任者でないこと\n- 配置予定技術者が、配置実績に関する同種工事（国又は地方公共団体発注、最終請負金額税込4,500万円以上、建築物に係る管工事）での従事経験を有すること（従事期間が工期の半分を超えていることが必要）\n\n【工期・期間】\n令和8年10月16日から令和9年末日までの341日間（余裕期間を含む）。契約締結日から工事開始日までの間に余裕期間が設定される。\n\n【申請・入札スケジュール】\n- 申請書等提出期限：令和8年8月7日（金）午後5時\n- 設計図書等の質疑提出期限：令和8年8月25日（火）午後5時（回答は令和8年9月1日）\n- 入札参加資格の有無通知：令和8年8月24日（月）\n- 入札日時：令和8年9月7日（月）午前10時\n- 入札場所：高知県職員能力開発センター202室",true,"(redacted)","kkj",[29,30,31,32,33,34,35,36],{"url":26,"name":26},{"url":26,"name":26},{"url":26,"name":26},{"url":26,"name":26},{"url":26,"name":26},{"url":26,"name":26},{"url":26,"name":26},{"url":26,"name":26},false,[],[],{"id":6,"name":11,"categoryId":41,"parentId":14,"parentName":14,"bidInfoUrl":14},50,[43],{"year":44,"count":45},2026,263,{"sameOrganization":47,"samePrefecture":69,"similar":91},[48,54,57,61,66],{"id":49,"title":50,"organizationName":11,"prefectureName":11,"publishedDate":51,"deadlineDate":52,"budget":14,"status":53},4424162,"国道321号(松田川橋)橋梁修繕工事(道老対(橋梁) 第1-11-9号)(令和8年9月4日公告)","2026-09-03T15:00:00.000Z","2026-09-27T15:00:00.000Z","active",{"id":55,"title":56,"organizationName":11,"prefectureName":11,"publishedDate":51,"deadlineDate":52,"budget":14,"status":53},4424161,"大西ノ川 河川災害復旧工事(7災 第81号)(令和8年9月4日公告)",{"id":58,"title":59,"organizationName":11,"prefectureName":11,"publishedDate":51,"deadlineDate":60,"budget":14,"status":53},4424160,"高知港海岸(港町地区)高潮対策工事(港高潮(広域)第6-22号)","2026-09-13T15:00:00.000Z",{"id":62,"title":63,"organizationName":11,"prefectureName":11,"publishedDate":64,"deadlineDate":65,"budget":14,"status":53},4061201,"室戸高等学校外41校で使用する電気の調達に係る一般競争入札について","2026-08-27T15:00:00.000Z","2026-09-29T15:00:00.000Z",{"id":67,"title":68,"organizationName":11,"prefectureName":11,"publishedDate":64,"deadlineDate":65,"budget":14,"status":53},4061200,"高知県の所管する施設で使用する電気の調達に係る一般競争入札について",[70,75,79,85,88],{"id":71,"title":72,"organizationName":73,"prefectureName":11,"publishedDate":51,"deadlineDate":74,"budget":14,"status":53},4424163,"森林環境保全整備事業(大谷鹿伏山2003保育間伐【活用型】)","林野庁四国森林管理局安芸森林管理署","2026-10-06T15:00:00.000Z",{"id":76,"title":77,"organizationName":78,"prefectureName":11,"publishedDate":51,"deadlineDate":74,"budget":14,"status":53},4424159,"【安芸森林管理署】森林環境保全整備事業(大谷鹿伏山2003保育間伐【活用型】)","農林水産省",{"id":80,"title":81,"organizationName":82,"prefectureName":11,"publishedDate":83,"deadlineDate":84,"budget":14,"status":53},4363550,"高知市斎場火葬棟トイレ等改修電気設備工事","高知県高知市","2026-09-02T15:00:00.000Z","2026-09-17T15:00:00.000Z",{"id":86,"title":87,"organizationName":82,"prefectureName":11,"publishedDate":83,"deadlineDate":84,"budget":14,"status":53},4363549,"江ノ口鴨田堰ゲート操作盤更新工事",{"id":89,"title":90,"organizationName":82,"prefectureName":11,"publishedDate":83,"deadlineDate":84,"budget":14,"status":53},4363548,"朝倉丙字明法谷測量設計委託業務",[92,97,103,108,113],{"id":93,"title":94,"organizationName":95,"prefectureName":96,"publishedDate":51,"deadlineDate":14,"budget":14,"status":53},4467391,"ALSOKぐんま総合スポーツセンター松くい虫被害木伐採等業務","群馬県地域創生部スポーツ振興課","群馬県",{"id":98,"title":99,"organizationName":100,"prefectureName":101,"publishedDate":51,"deadlineDate":84,"budget":102,"status":53},4427003,"天ケ森社会福祉センター解体工事.pdf","青森県三沢市","青森県",21879000,{"id":104,"title":105,"organizationName":106,"prefectureName":107,"publishedDate":51,"deadlineDate":52,"budget":14,"status":53},4425413,"吉田文化体育センター空気調和設備改修その他電気設備工事請負契約に係る総合評価落札方式による事後審査型制限付き一般競争入札(公告)","鹿児島県鹿児島市","鹿児島県",{"id":109,"title":110,"organizationName":111,"prefectureName":111,"publishedDate":51,"deadlineDate":112,"budget":14,"status":53},4425391,"【環境センター】紀本電子工業株式会社製大気常時監視自動測定機器構成部品一式の購入に係る条件付一般競争入札について","佐賀県","2026-09-14T15:00:00.000Z",{"id":114,"title":115,"organizationName":111,"prefectureName":111,"publishedDate":51,"deadlineDate":112,"budget":14,"status":53},4425390,"【環境センター】東亜ディーケーケー株式会社製大気常時監視自動測定機器構成部品一式の購入に係る条件付一般競争入札について",[117,123,129,135],{"title":118,"link":119,"date":120,"thumb":121,"cat":122},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":124,"link":125,"date":126,"thumb":127,"cat":128},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":130,"link":131,"date":132,"thumb":133,"cat":134},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":136,"link":137,"date":138,"thumb":139,"cat":140},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]