[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-2939018":3,"bid-history-2939018":42,"bid-related-2939018":46,"union-latest":102},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":29,"documentUrls":30,"businessExperience":29,"localOffice":26,"securityRequirement":29,"qualifications":37,"certifications":38,"organization":39},2939018,"(太)新田木崎町配水管布設替工事(太D-216)",2843,10,2,25,1,"群馬東部水道企業団太田本所総務課","群馬県","2026-07-27T15:00:00.000Z","2026-08-18T15:00:00.000Z",21070000,"closed","上水道","一般競争入札","水道施設","太田市　新田木崎町　地内","17:00:00","2026-08-20T15:00:00.000Z","・群馬東部水道企業団競争入札参加資格者名簿の建設工事「水道施設」に登録された業者であること\n・水道施設A等級の認定を有する業者であること\n・太田市内に入札契約等の権限を持つ本店を有する業者\n・建設業法第26条に規定する主任技術者または監理技術者を配置可能であること\n・監理技術者にあっては監理技術者資格者証及び監理技術者講習修了証を有する者\n・現場代理人を常駐で配置すること（他工事との兼務不可）\n・給水装置工事主任技術者を配置可能であること\n・配管技能者講習修了者を配置可能であること（日本ダクタイル鉄管協会継手接合研修会受講証「耐震管（φ450以下）」または平成25年度以降取得の日本水道協会配水管技能者登録証「耐震継手」を有する者）\n・配管施工講習受講者を配置可能であること（配水用ポリエチレンパイプシステム協会の水道配水用ポリエチレン配管施工講習受講証を有する者）\n・配置技術者は入札書提出までに3箇月以上の雇用関係があること\n・水道法第16条の2第1項に定める指定給水装置工事事業者として企業団の指定を受けていること\n・地方自治法施行令第167条の4第1項に該当しないこと\n・建設業法第27条の23に基づく経営事項審査が終了し、有効期限内であること\n・企業団入札参加資格停止期間中でないこと\n・会社更生法または民事再生法の手続開始申し立てを受けていない者\n・同一入札に参加する親会社・子会社・同一親会社の子会社同士でないこと","【案件概要】\n群馬東部水道企業団が太田市新田木崎町地内における配水管布設替工事の一般競争入札を実施する。案件番号は261026、電子入札による条件付一般競争入札（事後審査型）で、予定価格は21,070,000円（税抜）。施工延長は180.0m、ダクタイル鋳鉄管（φ75、160.0m）および水道配水用ポリエチレン管（φ50、17.6m）の布設替、仕切弁・消火栓","設置、給水管切替19箇所を予定している。履行期間は令和8年9月7日から令和9年1月22日まで。\n\n【業務内容】\n- GX形（S種）ダクタイル鋳鉄管φ75、L=160.0mの布設\n- 水道配水用ポリエチレン管φ50、L=17.6mの布設\n- ソフトシール仕切弁（S）φ75、1基および φ50、2基の設置\n- 単口消火栓φ75×φ75、1基の設置\n- 給水管切替19箇所\n- 建設リサイクル法対応\n\n【応募要件】\n- 群馬東部水道企業団競争入札参加資格者名簿の建設工事「水道施設」に登録された業者であること\n- 水道施設A等級の認定を有する業者であること\n- 太田市内に入札契約等の権限を持つ本店を有する業者\n- 建設業法第26条に規定する主任技術者または監理技術者を配置可能であること\n- 監理技術者にあっては監理技術者資格者証及び監理技術者講習修了証を有する者\n- 現場代理人を常駐で配置すること（他工事との兼務不可）\n- 給水装置工事主任技術者を配置可能であること\n- 配管技能者講習修了者（日本ダクタイル鉄管協会継手接合研修会受講証「耐震管（φ450以下）」または平成25年度以降取得の日本水道協会配水管技能者登録証「耐震継手」を有する者）を配置可能\n- 配管施工講習受講者（配水用ポリエチレンパイプシステム協会（POLITEC）の水道配水用ポリエチレン配管施工講習受講証を有する者）を配置可能\n- 配置技術者は入札書提出までに3箇月以上の雇用関係があること\n- 水道法第16条の2第1項に定める指定給水装置工事事業者として企業団の指定を受けていること\n- 地方自治法施行令第167条の4第1項に該当しない者\n- 建設業法第27条の23に基づく経営事項審査が終了し、有効期限内であること\n- 企業団入札参加資格停止期間中でないこと\n- 会社更生法または民事再生法の手続開始申し立てを受けていない者\n- 同一入札に参加する親会社・子会社・同一親会社の子会社同士でないこと\n- 役員の兼務関係に該当しないこと\n\n【工期・期間】\n履行期間：令和8年9月7日から令和9年1月22日まで\nスケジュール：入札参加申請期間は令和8年7月28日9:00～8月4日17:00、入札期間は令和8年8月17日9:00～8月19日17:00、開札日は令和8年8月21日9:00、入札結果公表日は令和8年8月28日17:00までに公表、契約予定日は令和8年9月4日",true,"(redacted)","gunma-cals",false,[31,32,33,34,35,36],{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},[],[],{"id":6,"name":11,"categoryId":40,"parentId":41,"parentName":41,"bidInfoUrl":41},15,null,[43],{"year":44,"count":45},2026,22,{"sameOrganization":47,"samePrefecture":71,"similar":92},[48,54,58,62,67],{"id":49,"title":50,"organizationName":11,"prefectureName":12,"publishedDate":51,"deadlineDate":41,"budget":52,"status":53},3876331,"群馬東部水道企業団太田本所 機械警備業務委託(長期継続契約)","2026-08-24T15:00:00.000Z",3500000,"active",{"id":55,"title":56,"organizationName":11,"prefectureName":12,"publishedDate":51,"deadlineDate":41,"budget":57,"status":53},3876330,"群馬東部水道企業団新太田本所共用・管理部備品",8760000,{"id":59,"title":60,"organizationName":11,"prefectureName":12,"publishedDate":51,"deadlineDate":41,"budget":61,"status":53},3876329,"(み)笠懸町(市道笠懸4288号線)配水管布設替工事",12890000,{"id":63,"title":64,"organizationName":11,"prefectureName":12,"publishedDate":51,"deadlineDate":65,"budget":66,"status":53},3876328,"みどり塩原浄水場第二水源発電機蓄電池交換工事","2026-09-08T15:00:00.000Z",2620000,{"id":68,"title":69,"organizationName":11,"prefectureName":12,"publishedDate":51,"deadlineDate":65,"budget":70,"status":53},3876327,"(太)西本町(太田高校西)舗装本復旧工事",3320000,[72,77,82,86,89],{"id":73,"title":74,"organizationName":12,"prefectureName":12,"publishedDate":75,"deadlineDate":76,"budget":41,"status":53},4424953,"【入札公告】「納税通知書等作成業務委託」に係る一般競争入札","2026-09-03T15:00:00.000Z","2026-10-01T15:00:00.000Z",{"id":78,"title":79,"organizationName":80,"prefectureName":12,"publishedDate":75,"deadlineDate":81,"budget":41,"status":53},4424952,"薬品在庫管理システム 一式","厚生労働省","2026-09-30T15:00:00.000Z",{"id":83,"title":84,"organizationName":85,"prefectureName":12,"publishedDate":75,"deadlineDate":41,"budget":41,"status":53},4389233,"単独公共 単独交通安全対策事業(適管債)道路照明柱更新工事 主要地方道 前橋安中富岡線 高崎市井出町外地内","群馬県県土整備部高崎土木事務所",{"id":87,"title":88,"organizationName":85,"prefectureName":12,"publishedDate":75,"deadlineDate":41,"budget":41,"status":53},4389232,"補助公共 社会資本総合整備(防災・安全・一般)左折車線整備工事 分割2号 国道 354号綿貫町北交差点 高崎市綿貫町地内",{"id":90,"title":91,"organizationName":85,"prefectureName":12,"publishedDate":75,"deadlineDate":41,"budget":41,"status":53},4389231,"単独公共 単独砂防維持管理事業堆積土除去工事 烏川支川 大沢川 高崎市箕郷町松之沢地先",[93,98],{"id":94,"title":95,"organizationName":11,"prefectureName":12,"publishedDate":51,"deadlineDate":96,"budget":97,"status":53},3875822,"(太)新田木崎町配水管布設替工事(太D-200)","2026-09-14T15:00:00.000Z",21760000,{"id":99,"title":100,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":51,"budget":101,"status":16},2939017,"(太)新田木崎町配水管布設替工事(太D-211ほか)",23080000,[103,109,115,121],{"title":104,"link":105,"date":106,"thumb":107,"cat":108},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":110,"link":111,"date":112,"thumb":113,"cat":114},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":116,"link":117,"date":118,"thumb":119,"cat":120},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":122,"link":123,"date":124,"thumb":125,"cat":126},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]