[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-2810889":3,"bid-history-2810889":33,"bid-related-2810889":37,"union-latest":110},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":15,"openingDate":21,"qualificationText":22,"aiSummary":23,"aiSummaryGated":24,"aiSummaryTruncated":25,"sourceUrl":26,"dataSourceCode":27,"budgetTaxIncluded":15,"documentUrls":28,"businessExperience":29,"localOffice":25,"securityRequirement":29,"qualifications":30,"certifications":31,"organization":32},2810889,"【総合評価】７繰債総防離国改補第２－４号 一般国道３８２号道路改良工事（樫滝３工区）",2802,42,2,14,1,"対馬振興局","長崎県","2026-07-20T15:00:00.000Z","2026-08-17T15:00:00.000Z",null,"closed","土木","一般競争入札","道路改良工事（土木工事）","対馬市上県町樫滝","2026-08-18T15:00:00.000Z","・土木工事業に係る特定建設業の許可を有すること\n・対馬振興局管内に主たる営業所を有する者で、土木一式工事に係る総合数値が900点以上かつ主観点数が30点以上で格付等級がAランク、又は長崎県内に主たる営業所を有し特認営業所を有する者で同等の格付要件を満たすこと\n・土木一式工事において年間平均完成工事高が3億円以上\n・以下の国家資格のいずれかを有する主任技術者（又は監理技術者）を専任で配置できること：1級建設機械施工管理技士、1級建設機械施工技士、1級土木施工管理技士、技術士（建設部門、農業部門、森林部門、水産部門、総合技術監理部門）\n・配置予定技術者と直接的かつ恒常的な雇用関係（3か月以上）にあること\n・資格確認資料提出期限日から過去3か月間に真にやむを得ない理由による技術者途中交代をしていないこと（途中交代技術者が同等以上の場合を除く）\n・経営事項審査の有効期間内であること","【案件概要】\n長崎県対馬振興局が実施する一般国道382号道路改良工事（樫滝3工区）の制限付一般競争入札。対馬市上県町樫滝を工事場所とし、総合評価落札方式（施工能力1型）を適用した工事である。工事延長L=516m、幅員W=7.0m程度で、掘削工V=1,300m³、盛土工V=7,200m³等を含む。工期は322日間の任意着手方式であり、受注者は契約締結から令和8","年10月14日までの間で工事着手日を任意に設定可能。電子入札システムを使用した入札であり、履行確実性評価方式試行要領を適用する。\n\n【業務内容】\n- 道路改良工事の設計・施工（工事延長516m、幅員7.0m）\n- 掘削工V=1,300m³の実施\n- 盛土工V=7,200m³の実施\n- 法面工A=2,150m²の施工\n- カルバート工L=23.6mの施工\n- 排水構造物工L=588mの施工\n- 仮設工の実施\n- 建設資材の再資源化等に関する法律に基づく分別解体等及び特定建設資材廃棄物の再資源化の実施\n- i-Construction対応の土工施工（土工1000m³未満）\n- 情報共有システムの活用\n- 快適トイレの設置（特記仕様書に記載の仕様を満たす）\n- 週休2日制の遵守\n\n【応募要件】\n- 土木工事業に係る特定建設業の許可を有すること\n- 以下のいずれかの条件を満たすこと：\n  ・対馬振興局管内に主たる営業所を有し、土木一式工事に係る総合数値が900点以上かつ主観点数が30点以上でA等級\n  ・長崎県内に主たる営業所を有し、特認営業所を有し、土木一式工事に係る総合数値が900点以上かつ主観点数が30点以上でA等級\n- 土木一式工事において年間平均完成工事高が3億円以上\n- 配置予定主任技術者（又は監理技術者）の要件：\n  ・1級建設機械施工管理技士、1級建設機械施工技士、1級土木施工管理技士、技術士（建設部門等）のいずれかの資格を有すること\n  ・又は監理技術者資格者証及び監理技術者講習修了証を有し、講習修了から5年以内であること\n  ・当該入札参加者と直接的かつ恒常的な雇用関係（3か月以上）にあること\n- 資格確認資料提出期限から過去3か月間に真にやむを得ない理由による技術者途中交代をしていないこと\n- 経営事項審査の有効期間が満了していないこと\n- 配置予定技術者は専任（他工事現場との兼任不可）であること。余裕期間中は配置不要\n\n【工期・期間】\n工期322日間（任意着手方式）。受注者は契約締結から令和8年10月14日（工期着手期限）までの間で工事着手日を任意に設定可能。余裕期間（契約締結日から工事始期前日まで）は受注者の責により資材準備等を行うことができるが、工事着手は禁止。実工期は工事始期から322日間。前金払、中間前金払又は部分払が可能（ただし、前払金は工事始期以降の請求に限定）。",true,"(redacted)","nagasaki-doboku-koukoku",[],false,[],[],{"id":6,"name":11,"categoryId":15,"parentId":15,"parentName":15,"bidInfoUrl":15},[34],{"year":35,"count":36},2026,5,{"sameOrganization":38,"samePrefecture":62,"similar":83},[39,45,48,53,58],{"id":40,"title":41,"organizationName":11,"prefectureName":12,"publishedDate":42,"deadlineDate":43,"budget":15,"status":44},3707712,"【総合評価】８債対漁生基第３－４号 三浦湾地区水産生産基盤整備工事（２工区）","2026-08-20T15:00:00.000Z","2026-09-13T15:00:00.000Z","active",{"id":46,"title":47,"organizationName":11,"prefectureName":12,"publishedDate":42,"deadlineDate":43,"budget":15,"status":44},3707711,"【総合評価】８債対漁機強第１－３号 阿須湾地区漁港施設機能強化工事（１工区）",{"id":49,"title":50,"organizationName":11,"prefectureName":12,"publishedDate":51,"deadlineDate":52,"budget":15,"status":44},3554702,"【価格競争】７補繰債対急基第１－２号 基礎調査（微地形調査及び区域設定）業務委託（厳原町）","2026-08-16T15:00:00.000Z","2026-09-07T15:00:00.000Z",{"id":54,"title":55,"organizationName":11,"prefectureName":12,"publishedDate":56,"deadlineDate":57,"budget":15,"status":44},3230009,"【総合評価】８起単改第４００１－２号 主要地方道厳原豆酘美津島線道路改良工事（道路概略設計業務委託）","2026-08-03T15:00:00.000Z","2026-08-24T15:00:00.000Z",{"id":59,"title":60,"organizationName":11,"prefectureName":12,"publishedDate":61,"deadlineDate":57,"budget":15,"status":44},2949891,"【総合評価】８債対河第２－５号 久根川総合流域防災工事（１工区）","2026-07-27T15:00:00.000Z",[63,67,70,73,77],{"id":64,"title":65,"organizationName":66,"prefectureName":12,"publishedDate":57,"deadlineDate":15,"budget":15,"status":44},3894594,"大村市公共下水道事業農業集落排水施設統合に伴う基本設計業務委託","大村市",{"id":68,"title":69,"organizationName":66,"prefectureName":12,"publishedDate":57,"deadlineDate":15,"budget":15,"status":44},3894593,"鈴田川・東大川水系洪水関連標識検討業務委託",{"id":71,"title":72,"organizationName":66,"prefectureName":12,"publishedDate":57,"deadlineDate":15,"budget":15,"status":44},3894592,"ボートレース大村屋外観覧エリア監視カメラ増設工事",{"id":74,"title":75,"organizationName":12,"prefectureName":12,"publishedDate":57,"deadlineDate":76,"budget":15,"status":44},3894529,"令和８年度島原道路（瑞穂吾妻バイパス）建設工事に伴う埋蔵文化財発掘調査業務委託（乙宮A遺跡）","2026-09-08T15:00:00.000Z",{"id":78,"title":79,"organizationName":80,"prefectureName":12,"publishedDate":57,"deadlineDate":81,"budget":82,"status":44},3893175,"市道曙町稲佐町線道路改良工事【余任】","長崎市","2026-09-09T15:00:00.000Z",7068000,[84,91,96,101,106],{"id":85,"title":86,"organizationName":87,"prefectureName":88,"publishedDate":57,"deadlineDate":89,"budget":90,"status":44},3886579,"【総合評価・週休2日・快適トイレ・建設キャリアアップ・電子契約】08国補橋修第08-04-490-0-001号 滝川橋修繕工事","茨城県 土木部 常陸大宮土木事務所大子工務所","茨城県","2026-09-15T15:00:00.000Z",120054000,{"id":92,"title":93,"organizationName":94,"prefectureName":95,"publishedDate":57,"deadlineDate":15,"budget":15,"status":44},3885229,"一般国道122号蓮田岩槻バイパス(並木南)家屋事後調査業務(R8)","さいたま市 建設局北部建設事務所 道路建設課","埼玉県",{"id":97,"title":98,"organizationName":99,"prefectureName":88,"publishedDate":57,"deadlineDate":52,"budget":100,"status":44},3883343,"【総合評価】08県単橋修 第08-58-650-0-002号 外合併 長豊橋耐震・修繕工事(その2)","茨城県 土木部 竜ヶ崎工事事務所",73898000,{"id":102,"title":103,"organizationName":104,"prefectureName":88,"publishedDate":57,"deadlineDate":15,"budget":105,"status":44},3883342,"08県単急傾斜 第08-05-587-0-001号 07県単急傾斜 第07-05-587-0-002号 合併 急傾斜地崩壊対策工事 ※総合評価","茨城県 土木部 水戸土木事務所",30635000,{"id":107,"title":108,"organizationName":109,"prefectureName":12,"publishedDate":57,"deadlineDate":89,"budget":15,"status":44},3883341,"【総合評価】８債単造第１号 長崎北陽台高校運動場全面改修工事","土木部 営繕課",[111,117,123,129],{"title":112,"link":113,"date":114,"thumb":115,"cat":116},"電子入札 導入ガイド｜必要な環境・手順・メリットをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-introduction\u002F","2026-08-05T16:39:18","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-introduction-300x167.webp","参加の準備",{"title":118,"link":119,"date":120,"thumb":121,"cat":122},"総合評価 施工体制確認型とは？目的・評価項目・実務対応を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fsystem-confirmation-evaluation\u002F","2026-08-05T16:36:40","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_system-confirmation-evaluation-300x167.webp","実務ノウハウ",{"title":124,"link":125,"date":126,"thumb":127,"cat":128},"入札メール例文：問い合わせ・質問・委任状送付まで用途別に解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-email-templates\u002F","2026-08-05T16:34:07","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-email-templates-300x167.webp","情報収集・効率化",{"title":130,"link":131,"date":132,"thumb":133,"cat":134},"談合（入札談合）とは何か？定義・禁止理由・罰則をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-rigging\u002F","2026-08-05T16:28:42","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-rigging-300x167.webp","入札の基礎"]