[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-2785657":3,"bid-history-2785657":36,"bid-related-2785657":40,"union-latest":91},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":15,"documentUrls":29,"businessExperience":26,"localOffice":26,"securityRequirement":31,"qualifications":32,"certifications":33,"organization":34},2785657,"武庫川水系 武庫川南武橋撤去工事(その4)",2675,28,2,14,1,"兵庫県 阪神南県民センター 本局(総務防災課 - 土木・まちづくり)","兵庫県","2026-07-23T15:00:00.000Z","2026-08-30T15:00:00.000Z",null,"active","土木","一般競争入札","一般土木","尼崎市元浜町","12:00:00","2026-08-31T15:00:00.000Z","・兵庫県の建設工事入札参加資格者名簿に登載されている者\n・土木工事業に係る特定建設業の許可を有すること\n・入札参加資格者名簿における工種が一般土木工事であること\n・建設業法の総合評定値通知書が令和8年9月下旬まで有効であること\n・県内に建設業の許可を受けた主たる営業所を有し、格付等級A等級10点以上であること\n・一般土木工事における技術・社会貢献評価数値の合計点数180点以上であること\n・平成23年度以降に仮桟橋工事を元請として完成させた施工実績を有すること\n・県の指名停止を受けていないこと\n・会社更生法・民事再生法による手続開始の申立てを受けていないこと\n・本件工事の設計業務受託者でなく、受託者との関係がないこと\n・県発注工事で調査基準価格未満の契約を未完了の場合は平均工事成績点65点以上であること\n・電子署名及び認証に基づくICカードを電子入札システムに登録していること\n・資本関係又は人的関係に係る入札制限運用基準に該当しないこと\n・建設業法の土木工事の監理技術者資格者証及び監理技術者講習修了証を有する監理技術者を専任で配置できること\n・平成23年度以降に仮桟橋工事の施工実績を有する配置予定技術者を配置すること\n・現場代理人を適正に配置でき、申込期限日前3か月以上の直接的かつ恒常的な雇用関係を有すること\n・入札書と同時に技術資料を提出すること","【案件概要】\n兵庫県阪神南県民センターが武庫川水系武庫川南武橋撤去工事（その4）の公募型一般競争入札（事後審査型）を実施。工事場所は尼崎市元浜町で、工種は一般土木工事、下部工撤去2基を対象。工期は令和8年10月1日から令和9年6月30日まで（余裕期間：契約締結日から工期始期日前日まで）。総合評価落札方式（施工能力評価型）及び施工体制確認型総合評価落札方式を適","用し、低入札価格調査基準価格及び失格基準価格が設定される。電子入札システムを使用し、週休2日制度対象工事である。\n\n【業務内容】\n- 武庫川南武橋の下部工撤去工事（2基）\n- 発注者指定方式による工事施工（余裕期間内は資材準備等を実施可能）\n- 仮桟橋工事を含む撤去工事の施工\n- 契約後VE方式の技術提案受付\n- ICTの活用による施工（受注者希望型）\n- 週休2日制度による工事実施\n- 快適トイレ設置及び熱中症対策への対応\n- SDGs目標等を記載した看板の工事現場設置\n\n【応募要件】\n- 兵庫県の建設工事入札参加資格者名簿に登載されている者\n- 土木工事業に係る特定建設業の許可を有すること\n- 入札参加資格者名簿における工種が一般土木工事であること\n- 建設業法の総合評定値通知書が令和8年9月下旬まで有効であること\n- 県内に建設業の許可を受けた主たる営業所を有する者\n- 一般土木工事における格付等級A等級10点以上\n- 一般土木工事における技術・社会貢献評価数値の合計点数180点以上（平成23年度以降の工事成績による加算可）\n- 平成23年度以降に仮桟橋工事を元請として完成させた施工実績を有すること\n- 県の指名停止を受けていないこと\n- 会社更生法・民事再生法による手続開始の申立てを受けていないこと\n- 本件工事の設計業務受託者でないこと、及び受託者との関係がないこと\n- 県発注の一般土木工事で調査基準価格未満の契約を未完了の場合は平均工事成績点65点以上\n- 電子署名及び認証に基づくICカードを電子入札システムに登録していること\n- 資本関係又は人的関係に係る入札制限運用基準に該当しないこと\n- 監理技術者を専任で配置できること（工場製作期間を除く）\n- 平成23年度以降に仮桟橋工事の施工実績を有する配置予定技術者を配置すること\n- 現場代理人を適正に配置でき、直接的かつ恒常的な雇用関係（申込期限日前3か月以上）を有すること\n- 入札書と同時に技術資料を提出すること\n\n【工期・期間】\n工期：令和8年10月1日から令和9年6月30日まで\n（余裕期間：契約締結日から工期始期日の前日まで。余裕期間内は主任技術者及び監理技術者の配置は不要だが現場代理人の配置は要する。常駐は不要で他工事従事中の現場代理人を充てることが可能）\n入札参加申込期間：令和8年7月24日（金）から8月3日（月）まで（午前9時から午後4時まで）\n入札期間：令和8年8月28日（金）から8月31日（月）まで（8月31日は正午まで）\n開札日時：令和8年9月1日（火）午前10時00分\n入札参加資格確認資料提出期間：開札後2日以内（休日除く）",true,"(redacted)","ppi-core-hyogo",[30],{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":35,"parentId":15,"parentName":15,"bidInfoUrl":15},15,[37],{"year":38,"count":39},2026,6,{"sameOrganization":41,"samePrefecture":66,"similar":90},[42,47,53,57,62],{"id":43,"title":44,"organizationName":11,"prefectureName":12,"publishedDate":45,"deadlineDate":46,"budget":15,"status":16},2610704,"武庫川水系 武庫川河床掘削工事(南武橋上流その4)","2026-07-16T15:00:00.000Z","2026-08-17T15:00:00.000Z",{"id":48,"title":49,"organizationName":11,"prefectureName":12,"publishedDate":50,"deadlineDate":51,"budget":15,"status":52},2610703,"尼崎西宮芦屋港 尼崎閘門尼崎第1閘門機械設備改築工事( その2)","2026-06-28T15:00:00.000Z","2026-07-07T15:00:00.000Z","closed",{"id":54,"title":55,"organizationName":11,"prefectureName":12,"publishedDate":50,"deadlineDate":56,"budget":15,"status":52},2610702,"武庫川水系 武庫川南武橋撤去工事(その5)","2026-07-21T15:00:00.000Z",{"id":58,"title":59,"organizationName":11,"prefectureName":12,"publishedDate":60,"deadlineDate":61,"budget":15,"status":16},2610701,"武庫川水系 武庫川潮止堰撤去及び帯工設置工事(その2)","2026-06-24T15:00:00.000Z","2026-07-26T15:00:00.000Z",{"id":63,"title":64,"organizationName":11,"prefectureName":12,"publishedDate":65,"deadlineDate":50,"budget":15,"status":52},2610700,"新川・東川新川・東川統合排水機場本体工事(吐出管)","2026-06-15T15:00:00.000Z",[67,72,77,82,86],{"id":68,"title":69,"organizationName":70,"prefectureName":12,"publishedDate":13,"deadlineDate":71,"budget":15,"status":16},2794207,"西幹線・中央幹線水路(その7)工事","兵庫県 淡路県民局 本局(総務防災課 - 農林水産・環境)","2026-08-23T15:00:00.000Z",{"id":73,"title":74,"organizationName":75,"prefectureName":12,"publishedDate":13,"deadlineDate":76,"budget":15,"status":16},2790075,"福良江井岩屋線道路情報表示装置更新工事(郡家・尾崎)","兵庫県 淡路県民局 本局(総務防災課 - 土木・まちづくり)","2026-08-02T15:00:00.000Z",{"id":78,"title":79,"organizationName":80,"prefectureName":12,"publishedDate":13,"deadlineDate":81,"budget":15,"status":16},2790074,"(主)香住村岡線 舗装修繕工事","兵庫県 但馬県民局 新温泉土木事務所","2026-08-19T15:00:00.000Z",{"id":83,"title":84,"organizationName":85,"prefectureName":12,"publishedDate":13,"deadlineDate":81,"budget":15,"status":16},2790073,"(主)大屋波賀線 舗装修繕工事(中間A工区)","兵庫県 但馬県民局 養父土木事務所",{"id":87,"title":88,"organizationName":89,"prefectureName":12,"publishedDate":13,"deadlineDate":81,"budget":15,"status":16},2787368,"姫路港広畑地区臨港道路橋梁下部工事(第1工区)","国土交通省近畿地方整備局",[],[92,98,104,110],{"title":93,"link":94,"date":95,"thumb":96,"cat":97},"官公需適格組合とは？中小企業が入札で有利になる仕組みをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fkankojyu-cooperative\u002F","2026-07-22T18:07:27","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_kankojyu-cooperative-300x167.webp","参加の準備",{"title":99,"link":100,"date":101,"thumb":102,"cat":103},"随意契約とは？定義・要件・金額基準をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fdiscretionary-contract\u002F","2026-07-22T18:06:15","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_discretionary-contract-300x167.webp","入札の基礎",{"title":105,"link":106,"date":107,"thumb":108,"cat":109},"入札公告の見方を完全解説｜記載項目・確認手順・活用法まで","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-announcement\u002F","2026-07-22T18:04:37","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-announcement-300x167.webp","情報収集・効率化",{"title":111,"link":112,"date":113,"thumb":114,"cat":97},"電子入札のデメリットを徹底解説｜初期費用・操作スキル・システム障害まで対策付きで紹介","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-demerit\u002F","2026-07-22T18:02:16","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-demerit-300x167.webp"]