[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-2717833":3,"bid-history-2717833":36,"bid-related-2717833":40,"union-latest":108},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":5,"regionText":19,"deadlineTime":20,"openingDate":21,"qualificationText":22,"aiSummary":23,"aiSummaryGated":24,"aiSummaryTruncated":25,"sourceUrl":26,"dataSourceCode":27,"budgetTaxIncluded":25,"documentUrls":28,"businessExperience":25,"localOffice":25,"securityRequirement":30,"qualifications":31,"certifications":32,"organization":33},2717833,"本庁舎空調用冷温水ポンプ交換修繕",2033,12,2,20,1,"成田市 総務部 契約検査課","千葉県","2026-07-21T15:00:00.000Z","2026-08-05T15:00:00.000Z",9526000,"active","管・空調","一般競争入札","成田市花崎町760番地","16:00:00","2026-08-06T15:00:00.000Z","・令和8・9年度成田市入札参加資格者名簿の「建設工事」部門に登載されている者\n・公告日から開札日までに指名停止措置又は入札参加除外を受けていない者\n・成田市内業者として登載され、管工事について建設業法第3条で規定する建設業の許可を有する者\n・管工事の経営事項審査の総合評点が1,000点未満で登載されている者\n・管工事について監理技術者又は主任技術者を配置すること\n・配置技術者は公告日現在、3か月以上の直接的・恒常的な雇用関係にあることが必要\n・現場代理人を常駐で配置すること（市が定めた要件を満たした場合を除く）\n・官公庁等が平成28年度以降に発注した管工事について、元請として受注し、施工完了した実績があること\n・手形交換所による取引停止処分を受けて2年間を経過していないこと\n・開札日前6か月以内に手形・小切手を不渡りにしていないこと\n・会社更生法又は民事再生法の適用申請により裁判所からの手続開始決定がされていないこと\n・本工事に係る設計業務等の受託者又は当該受託者と資本若しくは人事面において関連がない者\n・開札日以前3ヶ月以内に工事完成検査結果通知書で評定点60点未満の通知を受けていないこと\n・健康保険法、厚生年金保険法、雇用保険法の規定による届出の義務を履行していること","【案件概要】\n成田市総務部契約検査課が本庁舎空調用冷温水ポンプ交換修繕工事を実施する制限付一般競争入札（事後審査型）。工事場所は成田市花崎町760番地。予定価格は9,526,000円（消費税含む、入札書比較価格8,660,000円）。最低制限価格は8,662,500円（消費税含む、入札書比較価格7,875,000円）。工事期間は契約締結日の翌日から令和9年3","月12日（金）まで。電子入札により実施される。\n\n【業務内容】\n- 地下2階空調機械室にある一次側（1台）及び二次側（1台）の空調用冷温水ポンプ交換\n- ポンプ機器：多段渦巻ポンプ（P-1一次ポンプ100φ×730L\u002Fmin×48m、P-2二次ポンプ125φ×1080L\u002Fmin×55m）\n- 付属品：スプリング防振架台、圧力計、連成計、吸込ユニット、フート弁、防振継手等の設置\n- 配管工事：SGP加工管、SUS304加工管の保温・配管付属品、材工\n- ポンプ撤去及び既存配管撤去\n- 発生材運搬・処分（解体系混合廃棄物4m³）\n- 電源接続工事\n- 上記に伴う修繕一式\n\n【応募要件】\n- 令和8・9年度成田市入札参加資格者名簿の「建設工事」部門に登載されている者\n- 公告日から開札日までに指名停止措置又は入札参加除外を受けていない者\n- 成田市内業者として資格者名簿に登載されている者で、管工事について建設業法第3条で規定する建設業の許可を有し、経営事項審査の総合評点が1,000点未満で登載されている者\n- 管工事について、建設業法第26条第2項の監理技術者又は同条第1項の主任技術者を配置すること。配置技術者は公告日現在、3か月以上の直接的・恒常的な雇用関係にあることが必要\n- 特例監理技術者を配置する場合は、監理技術者補佐を専任で配置し、同一の特例監理技術者が配置できる工事は本工事を含め同時に2件までとする\n- 成田市建設工事請負契約書約款第10条第3項の現場代理人を常駐で配置すること\n- 官公庁等が平成28年度以降に発注した管工事について、元請として受注し、施工完了した実績があること\n- 手形交換所による取引停止処分を受けて2年間を経過していない者又は開札日前6か月以内に手形・小切手を不渡りにした者でないこと\n- 会社更生法又は民事再生法の適用を申請した者で、裁判所からの手続開始決定がされていない者でないこと\n- 本工事に係る設計業務等の受託者又は当該受託者と資本若しくは人事面において関連がある建設業者でないこと\n- 開札日以前3ヶ月以内に工事完成検査結果通知書で評定点60点未満の通知を受けていないこと\n- 健康保険法、厚生年金保険法、雇用保険法の規定による届出の義務を履行していること\n- 開札日の前日において、自らの責めに帰すべき事由により成田市発注の工事を工期内に完成することができず、工事目的物の引渡しを行っていない者でないこと\n\n【工期・期間】\n契約締結日の翌日から令和9年3月12日（金）まで\n\n【入札スケジュール】\n- 質問期限：令和8年7月28日（火）午後4時\n- 入札送信期間：令和8年7月31日（金）午前8時～8月6日（木）午後4時\n- 開札日時：令和8年8月7日（金）午前9時24分\n- 契約締結：落札者決定後7日以内",true,"(redacted)","ppi-core-chiba",[29],{"url":26,"name":26},false,[],[],{"id":6,"name":11,"categoryId":34,"parentId":35,"parentName":35,"bidInfoUrl":35},15,null,[37],{"year":38,"count":39},2026,63,{"sameOrganization":41,"samePrefecture":62,"similar":85},[42,46,50,54,58],{"id":43,"title":44,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":45,"status":16},2718235,"物件調査委託(西三里塚大清水線)",1562000,{"id":47,"title":48,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":49,"status":16},2718234,"急傾斜地崩壊対策事業実施設計委託(台方2)",4917000,{"id":51,"title":52,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":53,"status":16},2718233,"急傾斜地崩壊対策事業実施設計委託(伊能2)",6039000,{"id":55,"title":56,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":57,"status":16},2718232,"測量調査及び実施設計委託(小野羽黒台2号線)",9669000,{"id":59,"title":60,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":61,"status":16},2718231,"第7分団第10部(本三里塚)消防器具庫新築工事設計業務委託",2739000,[63,67,71,75,80],{"id":64,"title":65,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":66,"status":16},2718230,"第7分団第8部(十余三)消防器具庫設計業務委託",3888500,{"id":68,"title":69,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":70,"status":16},2718229,"根木名川雨水1号幹線測量調査委託(不動ケ岡他)",11748000,{"id":72,"title":73,"organizationName":74,"prefectureName":12,"publishedDate":13,"deadlineDate":21,"budget":35,"status":16},2718228,"千葉県立市原八幡高等学校管理諸室・特別教室空調設備設計","千葉県 教育庁(県立学校) 千葉県立市原八幡高等学校",{"id":76,"title":77,"organizationName":78,"prefectureName":12,"publishedDate":13,"deadlineDate":79,"budget":35,"status":16},2718028,"秋田川 排水路実施設計業務","千葉県 農林水産部 海匝農業事務所","2026-08-17T15:00:00.000Z",{"id":81,"title":82,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":83,"budget":84,"status":16},2717835,"下水道管路施設改築工事(ストックマネジメント)(加良部三丁目他)","2026-08-26T15:00:00.000Z",91564000,[86,90,93,98,101],{"id":87,"title":88,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":89,"status":16},2717832,"玉造中継ポンプ場他自家発電設備更新工事",10054000,{"id":91,"title":92,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":35,"status":16},2709779,"水槽付消防ポンプ自動車(I-B型)購入",{"id":94,"title":95,"organizationName":96,"prefectureName":12,"publishedDate":13,"deadlineDate":97,"budget":35,"status":16},2707275,"柏市立逆井中学校他2校屋内消火栓ポンプ修繕","柏市 財政部 契約課","2026-08-13T15:00:00.000Z",{"id":99,"title":100,"organizationName":96,"prefectureName":12,"publishedDate":13,"deadlineDate":97,"budget":35,"status":16},2707274,"柏市立十余二小学校他2校屋内消火栓ポンプ修繕",{"id":102,"title":103,"organizationName":104,"prefectureName":105,"publishedDate":13,"deadlineDate":106,"budget":107,"status":16},2707065,"農業集落排水マンホールポンプ場 機械設備改修工事(第1工区)","前橋市水道局経営企画課","群馬県","2026-08-18T15:00:00.000Z",5250000,[109,115,121,127],{"title":110,"link":111,"date":112,"thumb":113,"cat":114},"官公需適格組合とは？中小企業が入札で有利になる仕組みをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fkankojyu-cooperative\u002F","2026-07-22T18:07:27","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_kankojyu-cooperative-300x167.webp","参加の準備",{"title":116,"link":117,"date":118,"thumb":119,"cat":120},"随意契約とは？定義・要件・金額基準をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fdiscretionary-contract\u002F","2026-07-22T18:06:15","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_discretionary-contract-300x167.webp","入札の基礎",{"title":122,"link":123,"date":124,"thumb":125,"cat":126},"入札公告の見方を完全解説｜記載項目・確認手順・活用法まで","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-announcement\u002F","2026-07-22T18:04:37","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-announcement-300x167.webp","情報収集・効率化",{"title":128,"link":129,"date":130,"thumb":131,"cat":114},"電子入札のデメリットを徹底解説｜初期費用・操作スキル・システム障害まで対策付きで紹介","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-demerit\u002F","2026-07-22T18:02:16","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-demerit-300x167.webp"]