[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-2587031":3,"bid-history-2587031":38,"bid-related-2587031":42,"union-latest":113},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":21,"deadlineTime":22,"openingDate":23,"qualificationText":24,"aiSummary":25,"aiSummaryGated":26,"aiSummaryTruncated":27,"sourceUrl":28,"dataSourceCode":29,"budgetTaxIncluded":15,"documentUrls":30,"businessExperience":27,"localOffice":27,"securityRequirement":32,"qualifications":33,"certifications":35,"organization":36},2587031,"横浜国立大学(常盤台)理工学系事務棟等改修工事",485,14,2,12,1,"国立大学法人横浜国立大学","神奈川県","2026-07-16T15:00:00.000Z","2026-07-26T15:00:00.000Z",null,"active","施設部施設企画課総務・契約係","建築","一般競争入札","工事","神奈川県横浜市","17:00:00","2026-08-25T15:00:00.000Z","・開札時において文部科学省における建築一式工事に係る令和7・8年度のA又はB等級の一般競争参加資格の認定を受けていること\n・平成23年度以降に、元請として完成・引渡しが完了した鉄筋コンクリート造、鉄骨造又は鉄骨鉄筋コンクリート造の建物における内装工事を含む延床面積1,000㎡以上の新営又は改修工事(改修の場合は改修延床面積1,000㎡以上)の施工実績を有すること\n・1級建築施工管理技士又は一級建築士の資格、もしくは国土交通大臣特別認定者である監理技術者又は主任技術者を配置できること\n・平成23年度以降に上記施工実績工事の経験を有する者であること\n・監理技術者にあっては監理技術者資格者証及び監理技術者講習修了証を有すること\n・配置予定の主任(監理)技術者は直接的かつ恒常的な雇用関係があることを明示できる資料が必要\n・申請書及び資料提出期限から開札までの期間に文部科学省から指名停止を受けていないこと\n・本工事の設計業務受託者と資本又は人事面において関連がない建設業者であること\n・入札参加者間に資本関係又は人的関係がないこと\n・神奈川県又は東京都、埼玉県、千葉県、群馬県、栃木県、茨城県、山梨県内に建設業法に基づく本店、支店又は営業所が所在すること\n・暴力団員が実質的に経営を支配する建設業者でないこと\n・建設業法施行規則第18条の2に定める経営事項審査を受審していること","【案件概要】\n国立大学法人横浜国立大学が、常盤台キャンパスの理工学系事務棟等の改修工事について一般競争入札を実施します。公告日は令和8年7月17日。本工事は総合評価落札方式(実績評価型)を採用し、「企業の技術力」及び「企業の信頼性・社会性」を含めた総合的評価で落札者を決定します。対象地域は神奈川県横浜市保土ケ谷区。工期は契約日の翌日から令和9年3月26日まで","(大学院工学研究棟は令和8年12月15日完了)。電気設備工事と機械設備工事は別途発注予定。\n\n【業務内容】\n- 理工学系事務棟(RC造4階建、延べ面積2,130㎡)の改修工事(無人改修)\n- 土木工学研究棟(RC造3階建、延べ面積1,474㎡)の改修工事(無人改修)\n- 大学院工学研究棟(SRC造9階建、延べ面積4,131㎡、改修面積166㎡)の改修工事(居ながら改修)\n- 建設工事に係る資材の再資源化等に関する法律に基づく分別解体等及び特定建設資材廃棄物の再資源化等の実施\n\n【応募要件】\n- 開札時において文部科学省における建築一式工事に係る令和7・8年度のA又はB等級の一般競争参加資格の認定を受けていること\n- 平成23年度以降に、元請として完成・引渡しが完了した、鉄筋コンクリート造、鉄骨造又は鉄骨鉄筋コンクリート造の建物における内装工事を含む延床面積1,000㎡以上の新営又は改修工事(改修の場合は改修延床面積1,000㎡以上)の施工実績を有すること\n- 1級建築施工管理技士又は一級建築士の資格、もしくは国土交通大臣特別認定者である監理技術者又は主任技術者を配置できること\n- 平成23年度以降に上記施工実績工事の経験を有する者であること\n- 監理技術者にあっては監理技術者資格者証及び監理技術者講習修了証を有すること\n- 配置予定の主任(監理)技術者は直接的かつ恒常的な雇用関係があることを明示できる資料が必要\n- 申請書及び資料提出期限から開札までの期間に文部科学省から指名停止を受けていないこと\n- 本工事の設計業務受託者と資本又は人事面において関連がない建設業者であること(一級建築士事務所神向寺設計、株式会社阿波設計事務所)\n- 入札参加者間に資本関係又は人的関係がないこと\n- 神奈川県又は東京都、埼玉県、千葉県、群馬県、栃木県、茨城県、山梨県内に建設業法に基づく本店、支店又は営業所が所在すること\n- 暴力団員が実質的に経営を支配する建設業者でないこと\n- 建設業法施行規則第18条の2に定める経営事項審査を受審していること\n\n【評価項目】\n- 企業の施工能力：過去15年間の施工実績及び令和6・7年度の工事成績評定点の平均点\n- 配置予定技術者の能力：過去15年間における監理技術者等の施工経験及び令和4・5・6・7年度完成工事の工事成績評定点\n- 法令遵守・事故及び不誠実な行為\n- 地域の精通度：神奈川県または東京都内における建築一式工事実績及び技術者・資機材等の拠点の有無\n- ワーク・ライフ・バランス等の取組状況\n\n【工期・期間】\n契約日の翌日から令和9年3月26日まで。ただし大学院工学研究棟の改修については令和8年12月15日までに完了とし、指定部分に係る部分引き渡しを行う。",true,"(redacted)","kkj",[31],{"url":28,"name":28},false,[34],3,[],{"id":6,"name":11,"categoryId":37,"parentId":15,"parentName":15,"bidInfoUrl":15},131,[39],{"year":40,"count":41},2026,11,{"sameOrganization":43,"samePrefecture":63,"similar":90},[44,47,50,55,58],{"id":45,"title":46,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},2587032,"横浜国立大学(常盤台)理工学系事務棟等改修機械設備工事",{"id":48,"title":49,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},2587030,"横浜国立大学(常盤台)理工学系事務棟等改修電気設備工事",{"id":51,"title":52,"organizationName":11,"prefectureName":12,"publishedDate":53,"deadlineDate":54,"budget":15,"status":16},2536911,"デスクトップX線回折装置の供給","2026-07-15T15:00:00.000Z","2026-07-28T15:00:00.000Z",{"id":56,"title":57,"organizationName":11,"prefectureName":12,"publishedDate":53,"deadlineDate":54,"budget":15,"status":16},2536910,"GPUラックマウントサーバの供給",{"id":59,"title":60,"organizationName":11,"prefectureName":12,"publishedDate":61,"deadlineDate":62,"budget":15,"status":16},2249701,"マルチチャンネル電気化学測定システム(ポテンショガルバノスタッド)","2026-07-08T15:00:00.000Z","2026-09-02T15:00:00.000Z",[64,70,76,80,85],{"id":65,"title":66,"organizationName":67,"prefectureName":12,"publishedDate":68,"deadlineDate":69,"budget":15,"status":16},2698196,"統合人事システムの構築及び運用・保守業務","国立研究開発法人新エネルギー・産業技術総合開発機構","2026-07-20T15:00:00.000Z","2026-09-07T15:00:00.000Z",{"id":71,"title":72,"organizationName":73,"prefectureName":12,"publishedDate":68,"deadlineDate":74,"budget":75,"status":16},2698179,"軽量空気ボンベ及び空気呼吸器購入","神奈川県逗子市","2026-08-04T15:00:00.000Z",1852000,{"id":77,"title":78,"organizationName":73,"prefectureName":12,"publishedDate":68,"deadlineDate":74,"budget":79,"status":16},2698178,"現場作業用公用車賃貸借",710400,{"id":81,"title":82,"organizationName":83,"prefectureName":12,"publishedDate":68,"deadlineDate":84,"budget":15,"status":16},2697250,"R8京浜河川自動車(4×4G)1台交換購入 [PDF:84KB]","国土交通省関東地方整備局京浜河川事務所","2026-08-26T15:00:00.000Z",{"id":86,"title":87,"organizationName":88,"prefectureName":12,"publishedDate":68,"deadlineDate":89,"budget":15,"status":16},2697248,"Open Smart URデジタルサイネージ点検等業務 (令和8年7月21日)","独立行政法人都市再生機構本社","2026-08-27T15:00:00.000Z",[91,96,99,103,108],{"id":92,"title":93,"organizationName":11,"prefectureName":12,"publishedDate":94,"deadlineDate":95,"budget":15,"status":16},2043493,"横浜国立大学(立野他)体育館改修機械設備工事","2026-07-02T15:00:00.000Z","2026-08-03T15:00:00.000Z",{"id":97,"title":98,"organizationName":11,"prefectureName":12,"publishedDate":94,"deadlineDate":95,"budget":15,"status":16},2043492,"横浜国立大学(鎌倉他)体育館改修工事",{"id":100,"title":101,"organizationName":11,"prefectureName":12,"publishedDate":94,"deadlineDate":102,"budget":15,"status":16},2043491,"横浜国立大学(立野他)体育館改修電気設備工事","2026-08-02T15:00:00.000Z",{"id":104,"title":105,"organizationName":11,"prefectureName":12,"publishedDate":94,"deadlineDate":106,"budget":15,"status":107},2043490,"横浜国立大学(立野)附属横浜小学校体育館改修工事","2026-07-12T15:00:00.000Z","closed",{"id":109,"title":110,"organizationName":11,"prefectureName":12,"publishedDate":111,"deadlineDate":112,"budget":15,"status":107},750217,"横浜国立大学(常盤台)教育学部第1研究棟空調機電源増設工事(再公告)","2026-05-21T15:00:00.000Z","2026-05-31T15:00:00.000Z",[114,120,126,131],{"title":115,"link":116,"date":117,"thumb":118,"cat":119},"契約保証金とは？保証率・納入方法・免除条件を実務担当者向けに解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fcontract-bond\u002F","2026-07-15T12:00:35","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_contract-bond-300x167.webp","参加の準備",{"title":121,"link":122,"date":123,"thumb":124,"cat":125},"入札保証金とは？契約保証金との違い・金額・免除条件を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-bond\u002F","2026-07-15T11:59:32","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-bond-300x167.webp","実務ノウハウ",{"title":127,"link":128,"date":129,"thumb":130,"cat":125},"入札参加表明書の書き方｜記載項目・提出手順・注意点を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-participation-form\u002F","2026-07-15T11:51:41","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-participation-form-300x167.webp",{"title":132,"link":133,"date":134,"thumb":135,"cat":119},"電子入札のICカード完全ガイド｜取得方法・費用・使い方まで解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-ic-card\u002F","2026-07-15T11:45:14","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F06\u002Fthumb_e-bidding-ic-card-300x167.webp"]