[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-2484154":3,"bid-history-2484154":36,"bid-related-2484154":40,"union-latest":103},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":11,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":29,"documentUrls":30,"businessExperience":26,"localOffice":26,"securityRequirement":29,"qualifications":32,"certifications":33,"organization":34},2484154,"令和8年度 上水道事業 市道長貞1号線ほか老朽配水管布設替工事(1工区)",1286,28,2,25,1,"兵庫県加東市","兵庫県","2026-07-14T15:00:00.000Z","2026-07-23T15:00:00.000Z",null,"active","加東市総務財政部管財課","上水道","一般競争入札","工事","17:15:00","2026-08-05T15:00:00.000Z","・「令和8年度加東市建設工事入札参加資格者名簿」に登録されていること(公告日現在)\n・加東市内に本店を有する者\n・建設業法(昭和24年法律第100号)に規定する水道施設工事業の建設業許可を有する者\n・水道施設工事にかかる経営規模等評価結果通知書の総合評定値が575点以上かつ水道施設工事の完成工事高を有する者\n・水道施設工事業の技術者資格を有する自社正社員(公告日現在で3ヶ月以上の雇用契約がある者)を本工事に配置できる者\n・地方自治法施行令第167条の4第2項の規定に基づく加東市の入札参加資格基準による資格制限に該当しないこと\n・経営規模等評価結果通知書の有効期間が契約締結予定日(令和8年8月中旬予定)まで有効であること\n・入札参加申込期限日において加東市の指名停止を受けておらず、同基準に基づく指名停止の措置要件に該当しないこと\n・会社更生法(平成14年法律第154号)に基づく更生手続き開始の申立て及び民事再生法(平成11年法律第225号)に基づく再生手続き開始の申立てがなされていないこと\n・加東市における暴力団の排除の推進に関する条例(平成24年加東市条例第22号)第2条に規定する暴力団、暴力団員及び暴力団密接関係者でないこと\n・入札参加申込期限日において、加東市の資本関係又は人的関係がある者同士の同一入札への参加を制限する運用基準に該当しない者であること","【案件概要】\n加東市が令和8年度上水道事業として、市道長貞1号線ほか地内における老朽配水管の布設替工事(1工区)を制限付一般競争入札(事後審査型)で実施する。工事番号は2026081300で、公告日は令和8年7月15日。本工事は配水管布設替工事であり、HPPE管φ75(L=643.7m)、φ50(L=64.4m)、DCIP(GX)管φ75(L=4.8m)、S","US管φ75(L=4.9m)の布設を予定している。開札日時は令和8年8月6日(木)10時00分(予定)で、加東市役所5階501会議室で実施される。施工期間は契約締結日の翌日から令和9年1月29日までである。\n\n【業務内容】\n- 配水管布設替工事\n- HPPE管φ75の布設(L=643.7m)\n- HPPE管φ50の布設(L=64.4m)\n- DCIP(GX)管φ75の布設(L=4.8m)\n- SUS管φ75の布設(L=4.9m)\n- 設計図書に基づく施工管理及び品質管理\n\n【応募要件】\n- 「令和8年度加東市建設工事入札参加資格者名簿」に登録されていること(公告日現在)\n- 加東市内に本店を有する者\n- 建設業法に規定する水道施設工事業の建設業許可を有する者\n- 水道施設工事にかかる経営規模等評価結果通知書の総合評定値が575点以上かつ水道施設工事の完成工事高を有する者\n- 水道施設工事業の技術者資格を有する自社正社員(公告日現在で3ヶ月以上の雇用契約がある者)を本工事に配置できる者\n- 加東市の入札参加資格基準による資格制限に該当しないこと\n- 経営規模等評価結果通知書の有効期間が契約締結予定日(令和8年8月中旬予定)まで有効であること\n- 入札参加申込期限日において加東市の指名停止を受けておらず、同基準に基づく措置要件に該当しないこと\n- 会社更生法または民事再生法に基づく手続き開始の申立てがなされていないこと\n- 加東市における暴力団の排除の推進に関する条例に規定する暴力団、暴力団員及び暴力団密接関係者でないこと\n- 資本関係又は人的関係がある者同士の同一入札参加制限運用基準に該当しない者であること\n\n【工期・期間】\n施工期間:契約締結日の翌日から令和9年1月29日まで\n設計図書等の配布期間:令和8年8月4日(火)9時00分から令和8年8月5日(水)15時00分まで\n入札参加申込期間:令和8年7月24日(金)17時15分まで\n質問受付期間:令和8年7月31日(金)17時15分まで\n開札日時:令和8年8月6日(木)10時00分(予定)",true,"(redacted)","kkj",false,[31],{"url":27,"name":27},[],[],{"id":6,"name":11,"categoryId":35,"parentId":15,"parentName":15,"bidInfoUrl":15},52,[37],{"year":38,"count":39},2026,31,{"sameOrganization":41,"samePrefecture":57,"similar":81},[42,45,48,51,54],{"id":43,"title":44,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},2484159,"令和8年度 社会資本整備総合交付金事業 市営住宅家原団地3号棟長寿命化工事",{"id":46,"title":47,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},2484158,"令和8年度 社会資本整備総合交付金事業 市営住宅下三草団地3号棟長寿命化工事",{"id":49,"title":50,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},2484157,"令和8年度 社会資本整備総合交付金事業 いきいき広場ほか遊具更新工事",{"id":52,"title":53,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},2484156,"令和8年度 社学園小学校遊具設置工事",{"id":55,"title":56,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},2484155,"令和8年度 社会資本整備総合交付金事業 老朽配水管布設替工事(高区系統第6工区)",[58,63,66,72,76],{"id":59,"title":60,"organizationName":61,"prefectureName":12,"publishedDate":62,"deadlineDate":22,"budget":15,"status":16},2702249,"市野瀬有馬線道路改良工事(その7)","兵庫県 北播磨県民局 本局(総務防災課 - 土木・まちづくり)","2026-07-21T15:00:00.000Z",{"id":64,"title":65,"organizationName":61,"prefectureName":12,"publishedDate":62,"deadlineDate":22,"budget":15,"status":16},2702248,"神戸加東線道路改良工事(その6)",{"id":67,"title":68,"organizationName":69,"prefectureName":12,"publishedDate":70,"deadlineDate":71,"budget":15,"status":16},2702308,"令和8年度指定管理鳥獣捕獲等事業実施計画策定業務","環境部自然鳥獣共生課","2026-07-20T15:00:00.000Z","2026-07-26T15:00:00.000Z",{"id":73,"title":74,"organizationName":75,"prefectureName":12,"publishedDate":70,"deadlineDate":15,"budget":15,"status":16},2702247,"西相野地区伍池改修工事","兵庫県 阪神北県民局 阪神農林振興事務所",{"id":77,"title":78,"organizationName":79,"prefectureName":12,"publishedDate":70,"deadlineDate":80,"budget":15,"status":16},2702235,"兵庫県姫路家畜保健衛生所焼却炉1式の購入","出納局物品管理課","2026-08-03T15:00:00.000Z",[82,87,90,95,98],{"id":83,"title":84,"organizationName":85,"prefectureName":86,"publishedDate":62,"deadlineDate":15,"budget":15,"status":16},2693722,"令和08年度 水源林等整備推進事業(伊香保森林公園 下刈) 渋川市伊香保町伊香保(二ツ岳)地内","群馬県環境森林部渋川森林事務所","群馬県",{"id":88,"title":89,"organizationName":85,"prefectureName":86,"publishedDate":62,"deadlineDate":15,"budget":15,"status":16},2693721,"令和08年度 水源林等整備推進事業(赤城森林公園 下刈) 前橋市富士見町赤城山(赤城山)地内",{"id":91,"title":92,"organizationName":15,"prefectureName":93,"publishedDate":62,"deadlineDate":94,"budget":15,"status":16},2693701,"令和8年度大阪のまちづくりグランドデザイン推進方策検討業務","大阪府","2026-07-27T15:00:00.000Z",{"id":96,"title":97,"organizationName":79,"prefectureName":12,"publishedDate":70,"deadlineDate":80,"budget":15,"status":16},2702234,"令和8年度（下半期）用品単価契約【PPC用紙（B4、A3、A4）】",{"id":99,"title":100,"organizationName":101,"prefectureName":93,"publishedDate":70,"deadlineDate":102,"budget":15,"status":16},2698194,"プルーフ貨幣セット用化粧ケース 40,400個 令和8年8月6日","独立行政法人造幣局","2026-08-02T15:00:00.000Z",[104,110,116,121],{"title":105,"link":106,"date":107,"thumb":108,"cat":109},"契約保証金とは？保証率・納入方法・免除条件を実務担当者向けに解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fcontract-bond\u002F","2026-07-15T12:00:35","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_contract-bond-300x167.webp","参加の準備",{"title":111,"link":112,"date":113,"thumb":114,"cat":115},"入札保証金とは？契約保証金との違い・金額・免除条件を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-bond\u002F","2026-07-15T11:59:32","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-bond-300x167.webp","実務ノウハウ",{"title":117,"link":118,"date":119,"thumb":120,"cat":115},"入札参加表明書の書き方｜記載項目・提出手順・注意点を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-participation-form\u002F","2026-07-15T11:51:41","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-participation-form-300x167.webp",{"title":122,"link":123,"date":124,"thumb":125,"cat":109},"電子入札のICカード完全ガイド｜取得方法・費用・使い方まで解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-ic-card\u002F","2026-07-15T11:45:14","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F06\u002Fthumb_e-bidding-ic-card-300x167.webp"]