[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-2450811":3,"bid-history-2450811":37,"bid-related-2450811":41,"union-latest":89},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":7,"organizationName":10,"prefectureName":11,"publishedDate":12,"deadlineDate":13,"budget":14,"status":15,"department":16,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":14,"documentUrls":29,"businessExperience":26,"localOffice":26,"securityRequirement":31,"qualifications":32,"certifications":34,"organization":35},2450811,"石狩川応急対策工事の内 月寒排水機場無水化更新工事",12,1,2,22,"国土交通省北海道開発局","北海道","2026-07-14T15:00:00.000Z","2026-07-27T15:00:00.000Z",null,"active","札幌開発建設部本部(本部事業課)","機械器具","一般競争入札","工事","北海道札幌市","11:00:00","2026-10-08T15:00:00.000Z","・北海道開発局における工事区分「機械装置」に係る一般競争参加資格の決定を受けていること\n・平成23年4月1日から公告開始日までに、揚水機場または排水機場（救急排水機場を除く）におけるポンプ設備の「製作及び据付」または「修繕」を元請けとして施工した実績を有すること\n・北海道開発局発注工事に係る工事成績評定点の平均点が65点以上であること（令和5・6年度完成工事、又は令和3・4年度完成工事に限る）\n・技術士（機械部門又は総合技術監理部門）の資格を有する者又はこれと同等以上の資格を有する者を主任技術者または監理技術者として配置できること\n・現地での据付期間（令和9年11月1日から令和10年3月17日）に専任で配置できる主任技術者または監理技術者を有すること\n・監理技術者にあっては、監理技術者資格者証（機械器具設置工事業）及び監理技術者講習修了証を有すること\n・詳細設計技術者として、技術士（機械部門又は総合技術監理部門）の資格を有する者又は建設業法第7条第2号イ若しくはロに該当する者又はRCCM（機械）の資格を有する者を配置すること\n・北海道内に本工事を施工するために必要な建設業許可を受けた本店、支店又は営業所が所在すること\n・会社更生法又は民事再生法に基づき再生手続開始の申立てがなされていないこと（再決定を受けた者を除く）\n・申請書の提出期限の日から開札の時までの期間に、北海道開発局の指名停止を受けていないこと\n・予算決算及び会計令第70条及び第71条の規定に該当しない者であること\n・暴力団員が実質的に経営を支配する者又はこれに準ずるものとして国土交通省公共事業等からの排除要請があり、当該状態が継続している者でないこと","【案件概要】\n国土交通省北海道開発局札幌開発建設部が石狩川応急対策工事の一部として月寒排水機場無水化更新工事を一般競争入札に付す。本工事は排水機場の冬期対策を目的として排水ポンプ設備の改造・更新を行うもので、北海道札幌市を工事場所とする。総合評価落札方式（施工能力評価型Ⅱ型）の試行工事であり、施工体制確認型の評価を実施する。公告日は令和8年7月15日、申請書","提出期限は同年7月28日11時、開札日は同年10月9日を予定。\n\n【業務内容】\n- 主ポンプ設備の改造（2台分）\n- 主原動機の製作・据付（2台分）\n- 減速機の製作・据付（2台分）\n- 空気圧縮機の製作・据付（2台分）\n- 空気槽の製作・据付（2台分）\n- 監視操作制御設備の改造（1式）\n- 分別解体等及び特定建設資材廃棄物の再資源化等の実施\n- 詳細設計の実施\n- 新技術の活用（原則1技術以上）\n- 生産性向上チャレンジの実施\n- カーボンニュートラルに資する取組\n- インフラ分野のAI活用に資する取組\n\n【応募要件】\n- 北海道開発局における工事区分「機械装置」に係る一般競争参加資格の決定を受けていること\n- 平成23年4月1日から公告開始日までに、揚水機場または排水機場（救急排水機場を除く）におけるポンプ設備の「製作及び据付」または「修繕」を元請けとして施工した実績を有すること\n- 北海道開発局発注工事に係る工事成績評定点の平均点が65点以上であること（令和5・6年度完成工事、又は令和3・4年度完成工事）\n- 技術士（機械部門又は総合技術監理部門）の資格を有する者又はこれと同等以上の資格を有する監理技術者等を配置できること\n- 現地での据付期間（令和9年11月1日から令和10年3月17日まで）に専任で配置できる主任技術者または監理技術者を有すること\n- 監理技術者にあっては、監理技術者資格者証（機械器具設置工事業）及び監理技術者講習修了証を有すること\n- 詳細設計技術者として、技術士（機械部門又は総合技術監理部門）の資格を有する者又は建設業法第7条第2号イ若しくはロに該当する者又はRCCM（機械）の資格を有する者を配置すること\n- 北海道内に本工事を施工するために必要な建設業許可を受けた本店、支店又は営業所が所在すること\n- 暴力団員が実質的に経営を支配する者又はこれに準ずるものとして国土交通省公共事業等からの排除要請があり、当該状態が継続している者でないこと\n- 予算決算及び会計令第70条及び第71条の規定に該当しない者であること\n\n【工期・期間】\n契約締結日の翌日から令和10年3月17日まで。現地での据付期間は令和9年11月1日から令和10年3月17日までを予定。",true,"(redacted)","ippi-koji",[30],{"url":27,"name":27},false,[33],3,[],{"id":6,"name":10,"categoryId":36,"parentId":14,"parentName":14,"bidInfoUrl":14},17,[38],{"year":39,"count":40},2026,796,{"sameOrganization":42,"samePrefecture":64,"similar":82},[43,48,53,57,60],{"id":44,"title":45,"organizationName":10,"prefectureName":11,"publishedDate":46,"deadlineDate":47,"budget":14,"status":15},2706202,"手稲山地区直轄地すべり対策事業の内 管理用通路整備工事","2026-07-21T15:00:00.000Z","2026-08-03T15:00:00.000Z",{"id":49,"title":50,"organizationName":10,"prefectureName":11,"publishedDate":51,"deadlineDate":52,"budget":14,"status":15},2697027,"除雪機械後方安全対策装置購入取付 (PDF:178KB)","2026-07-20T15:00:00.000Z","2026-09-14T15:00:00.000Z",{"id":54,"title":55,"organizationName":10,"prefectureName":11,"publishedDate":51,"deadlineDate":56,"budget":14,"status":15},2697026,"パーソナルコンピュータ229式の借入(再リース) (PDF:190KB)","2026-08-02T15:00:00.000Z",{"id":58,"title":59,"organizationName":10,"prefectureName":11,"publishedDate":51,"deadlineDate":56,"budget":14,"status":15},2697025,"北海道開発局RPAシナリオ保守等業務 (PDF:150KB)",{"id":61,"title":62,"organizationName":10,"prefectureName":11,"publishedDate":51,"deadlineDate":63,"budget":14,"status":15},2697024,"農地及び基幹水利施設に係る整備状況調査 (PDF:147KB)","2026-07-29T15:00:00.000Z",[65,70,73,76,79],{"id":66,"title":67,"organizationName":68,"prefectureName":11,"publishedDate":46,"deadlineDate":69,"budget":14,"status":15},2706175,"名寄(8)隊庁舎新設等機械工事","防衛省北海道防衛局","2026-08-23T15:00:00.000Z",{"id":71,"title":72,"organizationName":68,"prefectureName":11,"publishedDate":46,"deadlineDate":69,"budget":14,"status":15},2706174,"北恵庭(8)医務室等新設電気その他工事",{"id":74,"title":75,"organizationName":68,"prefectureName":11,"publishedDate":46,"deadlineDate":69,"budget":14,"status":15},2706173,"倶知安(8)隊庁舎等新設機械工事",{"id":77,"title":78,"organizationName":68,"prefectureName":11,"publishedDate":46,"deadlineDate":69,"budget":14,"status":15},2706172,"近文台(8)敷地造成工事",{"id":80,"title":81,"organizationName":11,"prefectureName":11,"publishedDate":46,"deadlineDate":14,"budget":14,"status":15},2705349,"令和8年度(2026年度)潜在的介護職員等活用推進事業委託業務契約に係る総合評価一般競争入札の実施について",[83],{"id":84,"title":85,"organizationName":10,"prefectureName":11,"publishedDate":86,"deadlineDate":87,"budget":14,"status":88},16691,"石狩川応急対策工事の内 創成排水機場機械設備無水化改造工事","2026-01-14T15:00:00.000Z","2026-02-15T15:00:00.000Z","closed",[90,96,102,107],{"title":91,"link":92,"date":93,"thumb":94,"cat":95},"契約保証金とは？保証率・納入方法・免除条件を実務担当者向けに解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fcontract-bond\u002F","2026-07-15T12:00:35","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_contract-bond-300x167.webp","参加の準備",{"title":97,"link":98,"date":99,"thumb":100,"cat":101},"入札保証金とは？契約保証金との違い・金額・免除条件を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-bond\u002F","2026-07-15T11:59:32","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-bond-300x167.webp","実務ノウハウ",{"title":103,"link":104,"date":105,"thumb":106,"cat":101},"入札参加表明書の書き方｜記載項目・提出手順・注意点を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-participation-form\u002F","2026-07-15T11:51:41","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-participation-form-300x167.webp",{"title":108,"link":109,"date":110,"thumb":111,"cat":95},"電子入札のICカード完全ガイド｜取得方法・費用・使い方まで解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-ic-card\u002F","2026-07-15T11:45:14","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F06\u002Fthumb_e-bidding-ic-card-300x167.webp"]