[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-2430943":3,"bid-history-2430943":45,"bid-related-2430943":49,"union-latest":115},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":15,"documentUrls":29,"businessExperience":26,"localOffice":26,"securityRequirement":40,"qualifications":41,"certifications":42,"organization":43},2430943,"総地加)緊急浚渫推進工事(新方川樹木伐採工その2)",1843,11,2,17,1,"埼玉県 県土整備部 総合治水事務所","埼玉県","2026-07-13T15:00:00.000Z","2026-07-29T15:00:00.000Z",null,"active","造園","一般競争入札","造園工事業","一級河川新方川\u002F越谷市中島地内外","15:00:00","2026-07-30T15:00:00.000Z","・造園工事業の建設業許可（建設業法第3条）を受けていること\n・令和7・8年度埼玉県建設工事等競争入札参加資格者名簿に登載されていること\n・令和6年度及び令和7年度に完成した埼玉県発注造園工事の工事成績点数平均が各年度65点以上であること（受注実績がない場合は除外）\n・本店又は主たる営業所がさいたま県土整備事務所、北本県土整備事務所、越谷県土整備事務所、又は杉戸県土整備事務所管内にあること\n・造園工事業の格付がA級又はB級であること\n・平成28年4月1日以降に国又は地方公共団体との請負契約により、1回1,000万円以上の造園工事を完成させた実績を有すること\n・埼玉県発注工事の1次下請負契約による施工実績も認める（令和3年4月1日以降、1回1,000万円以上）\n・建設業法に規定された資格を有する監理技術者等を配置すること\n・開札日から1年7月前の日以降を審査基準日とする経営事項審査を受けていること\n・会社更生法又は民事再生法に基づく手続開始申立てを受けていないこと\n・埼玉県の入札参加停止措置を受けていないこと\n・暴力団排除措置を受けていないこと\n・電子入札システムで利用可能な電子証明書を取得し、利用者登録が完了していること\n・健康保険、厚生年金保険、雇用保険に事業主として加入していること","【案件概要】\n埼玉県県土整備部総合治水事務所が、一級河川新方川における緊急浚渫推進工事（新方川樹木伐採工その２）の一般競争入札（ダイレクト入札・事後審査型）を実施する。本工事は治水安全度向上を目的とした河川維持工事であり、越谷市中島地内外に位置する。入札方式は総合評価方式（簡易型地域担手型・自己採点方式）による一抜け方式で、複数工事が同時入札される。予定価格","は入札執行後に公表される。工期は契約確定日から令和9年2月26日までである。\n\n【業務内容】\n- 一級河川新方川における樹木伐採工（直径別に10段階：20cm未満30本、20～30cm50本、30～60cm50本、60～90cm50本、90～120cm30本、120～150cm20本、150～180cm5本、180～210cm3本、210～250cm2本、250～300cm2本、計242本）\n- 伐採木の積込作業（192m³）\n- 伐採木の運搬作業（DID有・20km以下、192m³）\n- 伐採木の処分作業（192m³）\n- 交通誘導警備員配置\n\n【応募要件】\n- 造園工事業の建設業許可を保有し、令和7・8年度埼玉県建設工事等競争入札参加資格者名簿に登載されていること\n- 令和6年度及び令和7年度に完成した埼玉県発注造園工事の工事成績点数平均が、いずれの年度においても65点以上であること（ただし、受注実績がない者はこの限りでない）\n- 本店又は主たる営業所がさいたま県土整備事務所、北本県土整備事務所、越谷県土整備事務所、又は杉戸県土整備事務所管内に所在すること\n- 造園工事業の格付がA級又はB級であること\n- 平成28年4月1日以降、国又は地方公共団体との請負契約により、契約金額1,000万円以上の造園工事を完成させた実績を有すること。埼玉県発注工事の1次下請負契約による実績も認める（令和3年4月1日以降）\n- 建設業法に規定された資格を有する監理技術者等を配置すること\n- 埼玉県建設工事等競争入札参加資格者名簿に登載される「本店又は主たる営業所」又は「営業所」以外の営業所等の実績も認める\n- 開札日から1年7月前の日以降を審査基準日とする経営事項審査を受けていること\n- 暴力団排除措置、入札参加停止措置の対象でないこと\n- 健康保険、厚生年金保険、雇用保険に事業主として加入していること\n\n【工期・期間】\n契約確定の日から令和9年2月26日まで\n\n【スケジュール】\n- 競争参加資格確認申請書提出期間：令和8年7月15日（水）9時00分～7月27日（月）16時00分\n- 設計図書等に関する質問期間：令和8年7月15日（水）9時00分～7月22日（水）16時00分\n- 質問に対する回答掲示日時：令和8年7月27日（月）16時00分\n- 入札書提出期間：令和8年7月28日（火）9時00分～7月30日（木）15時00分\n- 開札日時：令和8年7月31日（金）14時40分（入札対象工事－３）\n\n【総合評価方式の特徴】\n加算方式による評価値（入札金額と自己採点の点数）が最も高い者を落札候補者とする。低入札価格調査制度が適用される。一抜け方式により先の工事の落札者は後続工事への入札が無効となる。単体企業による入札に限定される。",true,"(redacted)","koukai-saitama",[30,31,32,33,34,35,36,37,38,39],{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":44,"parentId":15,"parentName":15,"bidInfoUrl":15},50,[46],{"year":47,"count":48},2026,12,{"sameOrganization":50,"samePrefecture":69,"similar":92},[51,56,60,63,66],{"id":52,"title":53,"organizationName":11,"prefectureName":12,"publishedDate":54,"deadlineDate":55,"budget":15,"status":16},2684163,"河川改修(水辺)工事(倉松川護岸更新詳細設計業務委託)","2026-07-20T15:00:00.000Z","2026-08-04T15:00:00.000Z",{"id":57,"title":58,"organizationName":11,"prefectureName":12,"publishedDate":59,"deadlineDate":55,"budget":15,"status":16},2551159,"河川改修事業(国庫)工事(新方川擁壁護岸工その7)","2026-07-16T15:00:00.000Z",{"id":61,"title":62,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},2430945,"総地加)緊急浚渫推進工事(大落古利根川樹木伐採工)",{"id":64,"title":65,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},2430944,"総地加)緊急浚渫推進工事(元荒川樹木伐採工その9)",{"id":67,"title":68,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},2430942,"総地加)緊急浚渫推進工事(中川樹木伐採工)",[70,75,80,85,88],{"id":71,"title":72,"organizationName":73,"prefectureName":12,"publishedDate":54,"deadlineDate":74,"budget":15,"status":16},2698154,"44_08-52-62B-3004.pdf","防衛省防衛医科大学","2026-08-31T15:00:00.000Z",{"id":76,"title":77,"organizationName":78,"prefectureName":12,"publishedDate":54,"deadlineDate":79,"budget":15,"status":16},2697249,"キャピラリー電気泳動装置","国立研究開発法人理化学研究所","2026-08-17T15:00:00.000Z",{"id":81,"title":82,"organizationName":83,"prefectureName":12,"publishedDate":54,"deadlineDate":84,"budget":15,"status":16},2697148,"令和8年度国有建物等解体撤去第2期工事設計業務(渋谷区代々木三丁目)","財務省関東財務局","2026-08-06T15:00:00.000Z",{"id":86,"title":87,"organizationName":78,"prefectureName":12,"publishedDate":54,"deadlineDate":55,"budget":15,"status":16},2697146,"高性能光学マウント",{"id":89,"title":90,"organizationName":78,"prefectureName":12,"publishedDate":54,"deadlineDate":91,"budget":15,"status":16},2697145,"有機フッ素化合物合成システム","2026-09-09T15:00:00.000Z",[93,98,104,109,112],{"id":94,"title":95,"organizationName":96,"prefectureName":12,"publishedDate":54,"deadlineDate":97,"budget":15,"status":16},2682842,"総地加)6505社資(河川)(新・土砂搬出工その4)","埼玉県 県土整備部 朝霞県土整備事務所","2026-08-19T15:00:00.000Z",{"id":99,"title":100,"organizationName":101,"prefectureName":12,"publishedDate":102,"deadlineDate":103,"budget":15,"status":16},2497684,"総地加)道路環境整備工事(側溝整備工赤沼工区)","埼玉県 県土整備部 東松山県土整備事務所","2026-07-15T15:00:00.000Z","2026-08-02T15:00:00.000Z",{"id":105,"title":106,"organizationName":107,"prefectureName":12,"publishedDate":108,"deadlineDate":22,"budget":15,"status":16},2453037,"総地加)舗装指定修繕工事(森戸工区)","埼玉県 県土整備部 飯能県土整備事務所","2026-07-14T15:00:00.000Z",{"id":110,"title":111,"organizationName":107,"prefectureName":12,"publishedDate":108,"deadlineDate":22,"budget":15,"status":16},2453036,"総地加)舗装指定修繕工事(清水町工区)",{"id":113,"title":114,"organizationName":107,"prefectureName":12,"publishedDate":108,"deadlineDate":22,"budget":15,"status":16},2453035,"総地加)舗装指定修繕工事(柳町工区)",[116,122,128,133],{"title":117,"link":118,"date":119,"thumb":120,"cat":121},"契約保証金とは？保証率・納入方法・免除条件を実務担当者向けに解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fcontract-bond\u002F","2026-07-15T12:00:35","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_contract-bond-300x167.webp","参加の準備",{"title":123,"link":124,"date":125,"thumb":126,"cat":127},"入札保証金とは？契約保証金との違い・金額・免除条件を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-bond\u002F","2026-07-15T11:59:32","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-bond-300x167.webp","実務ノウハウ",{"title":129,"link":130,"date":131,"thumb":132,"cat":127},"入札参加表明書の書き方｜記載項目・提出手順・注意点を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-participation-form\u002F","2026-07-15T11:51:41","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-participation-form-300x167.webp",{"title":134,"link":135,"date":136,"thumb":137,"cat":121},"電子入札のICカード完全ガイド｜取得方法・費用・使い方まで解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-ic-card\u002F","2026-07-15T11:45:14","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F06\u002Fthumb_e-bidding-ic-card-300x167.webp"]