[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-2423978":3,"bid-history-2423978":36,"bid-related-2423978":40,"union-latest":121},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":21,"deadlineTime":22,"openingDate":14,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":15,"documentUrls":29,"businessExperience":26,"localOffice":31,"securityRequirement":31,"qualifications":32,"certifications":33,"organization":34},2423978,"加古川水系直轄管理事業 鴨川ダム水管理制御システム更新工事",1546,28,2,23,1,"農林水産省近畿農政局","兵庫県","2026-07-13T15:00:00.000Z","2026-09-01T15:00:00.000Z",null,"active","加古川水系広域農業水利施設総合管理所","通信","一般競争入札","電気通信工事（水管理制御システム更新）","兵庫県加東市黒谷地内（鴨川ダム）、兵庫県三木市志染町三津田地内（総合管理所）、兵庫県三田市大川瀬字荒神釜地内（大川瀬ダム）","17:00:00","・近畿農政局における令和7・8年度一般競争参加資格のうち「電気通信工事」の認定を受けていること\n・平成23年4月1日から提出期限前日までに、元請けとして通信工事を施工・完成・引渡した実績を有すること\n・共同企業体の場合、構成員のうち1社が同種工事の施工実績を有すること\n・主任技術者：1級又は2級電気通信工事施工管理技士、技術士（電気・電子部門）、電気通信主任技術者（主務経験5年以上）、基幹技能者（登録電気工事基幹技能者）、高等学校卒業後5年以上の水管理制御設備工事実務経験者、又は10年以上の水管理制御設備工事実務経験者\n・監理技術者：1級電気通信工事施工管理技士、技術士（電気・電子部門）、元請として4,500万円以上の工事で2年以上の指導監督的実務経験を有する者、又は国土交通大臣認定者\n・配置予定技術者は直接的かつ恒常的な雇用関係があること\n・申請書提出期限から開札時までの期間に指名停止を受けていないこと\n・工事に係る設計業務等の受注者でないこと\n・同一入札に参加する複数者との間に資本関係又は人的関係がないこと\n・暴力団員が実質的に経営を支配する建設業者でないこと\n・健康保険、厚生年金保険、雇用保険の届出をしていること\n・工事完成引渡後における保守サービス体制が整備されていること","【案件概要】\n農林水産省近畿農政局が、加古川水系直轄管理事業に係る鴨川ダム水管理制御システム更新工事について一般競争入札（標準型）を実施。工事場所は兵庫県加東市黒谷地内（鴨川ダム）、兵庫県三木市志染町三津田地内（総合管理所）、兵庫県三田市大川瀬字荒神釜地内（大川瀬ダム）。本工事は施工体制確認型総合評価落札方式（簡易Ⅱ型）を適用し、品質・安全確保がされないおそ","れがある極端な低価格での入札を厳格に調査する試行工事。公告日は令和8年7月14日、申請書及び確認資料提出期限は令和8年7月28日、入札締切は令和8年9月1日（電子入札方式）、開札日は令和8年9月2日。\n\n【業務内容】\n- ダム管理設備1局の更新整備（情報処理設備、監視操作設備、情報伝送設備、計測設備、電源設備）\n- 予備品・付属品の製造・供給\n- 水管理制御システムの設計・製作・据付\n\n【応募要件】\n・近畿農政局における令和7・8年度一般競争参加資格のうち「電気通信工事」の認定を受けていること\n・平成23年4月1日から提出期限前日までに、元請けとして通信工事を施工・完成・引渡した実績を有すること（共同企業体の場合は構成員のうち1社が実績を有すること）\n・1級または2級電気通信工事施工管理技士、技術士（電気・電子部門）、電気通信主任技術者（主務経験5年以上）、基幹技能者（登録電気工事基幹技能者）、または水管理制御設備工事5年以上の実務経験を有する主任技術者を配置できること\n・監理技術者について、1級電気通信工事施工管理技士、技術士（電気・電子部門）、または元請として4,500万円以上の工事で2年以上の指導監督的実務経験を有する者を配置できること\n・配置予定技術者は直接的かつ恒常的な雇用関係があること\n・経常建設共同企業体の場合、構成員は単体として申請書を提出できないこと\n・申請書提出期限から開札時までの期間に指名停止を受けていないこと\n・工事に係る設計業務等の受注者でないこと\n・同一入札に参加する複数者との間に資本関係または人的関係がないこと\n・暴力団員が実質的に経営を支配する建設業者でないこと\n・健康保険、厚生年金保険、雇用保険の届出をしていること\n・工事完成引渡後における保守サービス体制が整備されていること\n\n【工期・期間】\n契約締結予定日：令和8年10月28日\n工期：令和8年10月28日から令和10年3月25日まで（515日間予定）\n余裕期間制度を活用する工事である。",true,"(redacted)","ippi-koji",[30],{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":35,"parentId":15,"parentName":15,"bidInfoUrl":15},141,[37],{"year":38,"count":39},2026,17,{"sameOrganization":41,"samePrefecture":68,"similar":93},[42,48,54,58,63],{"id":43,"title":44,"organizationName":11,"prefectureName":45,"publishedDate":46,"deadlineDate":47,"budget":15,"status":16},2549608,"令和 8年度 亀岡中部農地整備事業 千代川工区ゲート製作据付工事","京都府","2026-07-16T15:00:00.000Z","2026-08-20T15:00:00.000Z",{"id":49,"title":50,"organizationName":11,"prefectureName":51,"publishedDate":52,"deadlineDate":53,"budget":15,"status":16},2450787,"令和 8年度 和歌山平野農地防災事業 西村支線水路(下流部)改修工事","和歌山県","2026-07-14T15:00:00.000Z","2026-08-27T15:00:00.000Z",{"id":55,"title":56,"organizationName":11,"prefectureName":12,"publishedDate":52,"deadlineDate":57,"budget":15,"status":16},2450786,"令和 8年度 東条川二期農業水利事業 1号幹線水路改修(その6)工事","2026-08-26T15:00:00.000Z",{"id":59,"title":60,"organizationName":11,"prefectureName":12,"publishedDate":61,"deadlineDate":62,"budget":15,"status":16},2262097,"令和 8年度 加古川水系直轄管理事業 糀屋ダム1号漏水観測ピット排水ポンプ更新工事","2026-07-09T15:00:00.000Z","2026-08-06T15:00:00.000Z",{"id":64,"title":65,"organizationName":11,"prefectureName":12,"publishedDate":66,"deadlineDate":67,"budget":15,"status":16},1943086,"令和7年度東条川二期農業水利事業 昭和池堤体改修(その1)工事","2026-06-30T15:00:00.000Z","2026-08-24T15:00:00.000Z",[69,75,78,82,88],{"id":70,"title":71,"organizationName":72,"prefectureName":12,"publishedDate":73,"deadlineDate":74,"budget":15,"status":16},2702249,"市野瀬有馬線道路改良工事(その7)","兵庫県 北播磨県民局 本局(総務防災課 - 土木・まちづくり)","2026-07-21T15:00:00.000Z","2026-08-05T15:00:00.000Z",{"id":76,"title":77,"organizationName":72,"prefectureName":12,"publishedDate":73,"deadlineDate":74,"budget":15,"status":16},2702248,"神戸加東線道路改良工事(その6)",{"id":79,"title":80,"organizationName":81,"prefectureName":12,"publishedDate":73,"deadlineDate":15,"budget":15,"status":16},2702247,"西相野地区伍池改修工事","兵庫県 阪神北県民局 阪神農林振興事務所",{"id":83,"title":84,"organizationName":85,"prefectureName":12,"publishedDate":86,"deadlineDate":87,"budget":15,"status":16},2702308,"令和8年度指定管理鳥獣捕獲等事業実施計画策定業務","環境部自然鳥獣共生課","2026-07-20T15:00:00.000Z","2026-07-26T15:00:00.000Z",{"id":89,"title":90,"organizationName":91,"prefectureName":12,"publishedDate":86,"deadlineDate":92,"budget":15,"status":16},2702235,"兵庫県姫路家畜保健衛生所焼却炉1式の購入","出納局物品管理課","2026-08-03T15:00:00.000Z",[94,100,105,111,116],{"id":95,"title":96,"organizationName":97,"prefectureName":98,"publishedDate":73,"deadlineDate":99,"budget":15,"status":16},2702199,"208-167011 令8県営水利施設矢の目ダム第1工区水管理制御設備更新工事","農政部 農村振興課","栃木県","2026-08-16T15:00:00.000Z",{"id":101,"title":102,"organizationName":103,"prefectureName":104,"publishedDate":46,"deadlineDate":15,"budget":15,"status":16},2551180,"(予定事後)鴨川第7-1処理分区外下水道工事(北再-R8-408)","さいたま市 財政局契約管理部 契約課","埼玉県",{"id":106,"title":107,"organizationName":108,"prefectureName":104,"publishedDate":109,"deadlineDate":110,"budget":15,"status":16},2502139,"南部流域鴨川第14号流量計ほか改築工事","埼玉県 下水道局 荒川左岸南部下水道事務所","2026-07-15T15:00:00.000Z","2026-07-30T15:00:00.000Z",{"id":112,"title":113,"organizationName":114,"prefectureName":115,"publishedDate":52,"deadlineDate":15,"budget":15,"status":16},2480423,"鴨川市本庁舎ほか1施設で使用する電力の供給","鴨川市 財政課 契約係","千葉県",{"id":117,"title":118,"organizationName":108,"prefectureName":104,"publishedDate":119,"deadlineDate":120,"budget":15,"status":16},2394968,"南部流域鴨川幹線ほか管渠改築実施設計その7業務委託","2026-07-12T15:00:00.000Z","2026-07-28T15:00:00.000Z",[122,128,134,139],{"title":123,"link":124,"date":125,"thumb":126,"cat":127},"契約保証金とは？保証率・納入方法・免除条件を実務担当者向けに解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fcontract-bond\u002F","2026-07-15T12:00:35","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_contract-bond-300x167.webp","参加の準備",{"title":129,"link":130,"date":131,"thumb":132,"cat":133},"入札保証金とは？契約保証金との違い・金額・免除条件を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-bond\u002F","2026-07-15T11:59:32","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-bond-300x167.webp","実務ノウハウ",{"title":135,"link":136,"date":137,"thumb":138,"cat":133},"入札参加表明書の書き方｜記載項目・提出手順・注意点を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-participation-form\u002F","2026-07-15T11:51:41","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-participation-form-300x167.webp",{"title":140,"link":141,"date":142,"thumb":143,"cat":127},"電子入札のICカード完全ガイド｜取得方法・費用・使い方まで解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-ic-card\u002F","2026-07-15T11:45:14","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F06\u002Fthumb_e-bidding-ic-card-300x167.webp"]