[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-2266606":3,"bid-history-2266606":35,"bid-related-2266606":39,"union-latest":108},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":21,"deadlineTime":22,"openingDate":23,"qualificationText":24,"aiSummary":25,"aiSummaryGated":26,"aiSummaryTruncated":27,"sourceUrl":28,"budgetTaxIncluded":15,"documentUrls":29,"businessExperience":27,"localOffice":27,"securityRequirement":31,"qualifications":32,"certifications":33,"organization":34},2266606,"袖ケ浦市配水管改良(その3)工事実施設計業務委託",2113,12,7,40,1,"かずさ水道 工務課 管路工事設計班","千葉県","2026-07-09T15:00:00.000Z","2026-07-28T15:00:00.000Z",null,"active","かずさ水道広域連合企業団 工務課 管路工事設計班","土木設計","一般競争入札","土木関係建設コンサルタント（上水道及び工業用水道）","袖ケ浦市長浦駅前七丁目地先 外１箇所","16:00:00","2026-07-29T15:00:00.000Z","・かずさ水道広域連合企業団入札参加資格者名簿に登載されている者のうち、登録区分「測量等」「土木関係建設コンサルタント（上水道及び工業用水道）」の業種に登録されていること\n・公告日から開札日までの間、指名停止措置を受けていないこと\n・資格者名簿に登載されている本店または営業所所在地が千葉県内にあること\n・過去15年間（平成23年4月1日から公告日まで）に、国又は地方公共団体の発注した上水道配水管改良等の設計業務を元請として履行した実績があること\n・特定関係にある会社同士の入札参加制限基準に基づく資本関係又は人的関係にないこと\n・管理技術者は技術士（総合技術監理部門（上下水道）又は上下水道部門\u002F上水道及び工業用水道）、RCCM、土木学会認定土木技術者等の資格保有者であること\n・照査技術者は管理技術者と同等以上の能力・経験を有する技術者で、管理技術者との兼任不可","【案件概要】\nかずさ水道広域連合企業団が袖ケ浦市配水管改良（その３）工事の実施設計業務を制限付き一般競争入札（事後審査型）で発注。対象地域は千葉県袖ケ浦市長浦駅前七丁目地先外１箇所。配水管布設延長L=1,190m、仮設管布設延長L=1,190m、3工区に分割。履行期限は令和9年2月24日。予定価格・最低制限価格は事後公表。\n\n【業務内容】\n- 設計協議（業務","着手時、中間2回以上、成果品提出時）\n- 配水管布設替詳細設計（小口径）1式\n- 現地調査（既設管・給水管・バルブ、地形、用地境界、舗装本復旧範囲、地盤高、近接構造物、地下埋設物、電気・通信経路等の確認）\n- 設計計画の策定（工法比較、構造計画、仮設比較の検討）\n- 構造計算・仮設計算の実施\n- 図面作成（JIS A1版、DWG形式CADデータ）\n- 数量計算書、工期算定計算書、見積依頼資料等の作成\n- 設計照査（照査技術者による実施）\n- 報告書作成（検討書、各種計算書、打合せ議事録等を含む）\n\n【応募要件】\n- かずさ水道広域連合企業団入札参加資格者名簿に登載されている者のうち、登録区分「測量等」「土木関係建設コンサルタント（上水道及び工業用水道）」の業種に登録されていること\n- 公告日から開札日までの間、指名停止措置を受けていないこと\n- 資格者名簿に登載されている本店または営業所所在地が千葉県内にあること\n- 過去15年間（平成23年4月1日から公告日まで）に、国又は地方公共団体の発注した上水道配水管改良等の設計業務を元請として履行した実績があること\n- 特定関係にある会社同士の入札参加制限基準に基づく資本関係又は人的関係にないこと\n- 手形交換所による取引停止処分を受けてから2年以内でないこと\n- 会社更生法、民事再生法の適用を申請していないこと\n- 管理技術者は技術士（総合技術監理部門（上下水道－上水道及び工業用水道）又は上下水道部門\u002F上水道及び工業用水道）、RCCM（本業務該当登録技術部門）、土木学会認定土木技術者（特別上級、上級、1級）等の資格保有者であること\n- 照査技術者は管理技術者と同等以上の資格・能力を有する者で、管理技術者との兼任不可\n\n【工期・期間】\n契約締結日から令和9年2月24日限り\n\n【入札スケジュール】\n- 入札参加申請期限：令和8年7月22日（水）午後4時\n- 入札受付期間：令和8年7月28日（火）午前9時～7月29日（水）午後4時\n- 開札日時：令和8年7月30日（木）午前10時50分\n- 資格確認申請：落札候補者決定通知から3日以内\n- 落札者決定：資格確認申請期限の翌日から3日以内",true,"(redacted)",[30],{"url":28,"name":28},false,[],[],{"id":6,"name":11,"categoryId":15,"parentId":15,"parentName":15,"bidInfoUrl":15},[36],{"year":37,"count":38},2026,8,{"sameOrganization":40,"samePrefecture":56,"similar":79},[41,44,47,50,53],{"id":42,"title":43,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},2266607,"君津市配水管改良(その4)工事実施設計業務委託",{"id":45,"title":46,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},2266605,"君津市配水管改良(その5)工事実施設計業務委託",{"id":48,"title":49,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},2266604,"富津市配水管改良(その7)工事実施設計業務委託",{"id":51,"title":52,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},2266603,"富津市配水管改良(その6)工事実施設計業務委託",{"id":54,"title":55,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},2266602,"富津市配水管改良(その5)工事実施設計業務委託",[57,61,64,69,74],{"id":58,"title":59,"organizationName":60,"prefectureName":12,"publishedDate":13,"deadlineDate":15,"budget":15,"status":16},2299745,"一般競争入札参加資格審査申請書・誓約書(市指定用紙) (Word:27KB)","千葉県松戸市",{"id":62,"title":63,"organizationName":60,"prefectureName":12,"publishedDate":13,"deadlineDate":15,"budget":15,"status":16},2299744,"紙入札方式参加届出書(Word:14KB)",{"id":65,"title":66,"organizationName":60,"prefectureName":12,"publishedDate":13,"deadlineDate":67,"budget":68,"status":16},2299743,"松契一般第155号 東部クリーンセンターし尿処理施設精密機能検査業務委託(PDF:230KB)","2026-08-02T15:00:00.000Z",2550000,{"id":70,"title":71,"organizationName":60,"prefectureName":12,"publishedDate":13,"deadlineDate":72,"budget":73,"status":16},2299742,"松契一般第160号 旧クリーンセンター等残置物運搬業務委託(PDF:137KB)","2026-07-15T15:00:00.000Z",7230000,{"id":75,"title":76,"organizationName":60,"prefectureName":12,"publishedDate":13,"deadlineDate":77,"budget":78,"status":16},2299741,"松契一般第158号 松戸市新庁舎整備基本計画(現地建て替え)策定業務委託(PDF:138KB)","2026-08-06T15:00:00.000Z",217500000,[80,85,91,97,104],{"id":81,"title":82,"organizationName":83,"prefectureName":84,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},2262801,"中央伝送装置盤機能増設工事実施設計業務委託","本庄市 企画財政部 財政課","埼玉県",{"id":86,"title":87,"organizationName":88,"prefectureName":84,"publishedDate":13,"deadlineDate":89,"budget":90,"status":16},2262791,"配水管改良工事実施設計業務委託(その1)","熊谷市 上下水道部 経営課(水道)","2026-07-23T15:00:00.000Z",10626000,{"id":92,"title":93,"organizationName":94,"prefectureName":12,"publishedDate":95,"deadlineDate":96,"budget":15,"status":16},2234111,"八千代緑が丘自転車駐車場改修工事実施設計業務委託","八千代市 市長部局等 財務部契約課","2026-07-08T15:00:00.000Z","2026-07-13T15:00:00.000Z",{"id":98,"title":99,"organizationName":100,"prefectureName":12,"publishedDate":101,"deadlineDate":102,"budget":103,"status":16},2230536,"水道事業配水管布設工事実施設計業務委託(松崎)","成田市 総務部 契約検査課","2026-07-07T15:00:00.000Z","2026-07-22T15:00:00.000Z",4994000,{"id":105,"title":106,"organizationName":100,"prefectureName":12,"publishedDate":101,"deadlineDate":102,"budget":107,"status":16},2230533,"伊能浄水場取水井改修工事実施設計業務委託",17776000,[109,115,120,126],{"title":110,"link":111,"date":112,"thumb":113,"cat":114},"入札失注対策の完全ガイド｜原因分析から次回改善まで実務で使える手順","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Flost-bid-measures\u002F","2026-07-08T13:00:17","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_lost-bid-measures-300x167.webp","実務ノウハウ",{"title":116,"link":117,"date":118,"thumb":119,"cat":114},"入札 内訳書の書き方｜2025年改正対応・記載項目・注意点を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-breakdown-statement\u002F","2026-07-08T12:54:44","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-breakdown-statement-300x167.webp",{"title":121,"link":122,"date":123,"thumb":124,"cat":125},"入札説明書とは？確認すべき主要項目と仕様書との違いを徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-instructions\u002F","2026-07-08T12:52:35","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-instructions-300x167.webp","入札の基礎",{"title":127,"link":128,"date":129,"thumb":130,"cat":114},"前払金（公共工事）とは？仕組み・割合・手続きを実務担当者向けに解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fadvance-payment\u002F","2026-07-08T12:49:53","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_advance-payment-300x167.webp"]