[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-2262135":3,"bid-history-2262135":36,"bid-related-2262135":40,"union-latest":110},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"budgetTaxIncluded":26,"documentUrls":28,"businessExperience":26,"localOffice":26,"securityRequirement":31,"qualifications":32,"certifications":33,"organization":34},2262135,"【電子入札】【週休二日制】武井地区 第8工区区画整理工事【分割発注(とりおり)1\u002F2】",2237,8,2,14,1,"茨城県 農林水産部 県西農林事務所土地改良部門","茨城県","2026-07-09T15:00:00.000Z","2026-08-04T15:00:00.000Z",70763000,"active","土木","一般競争入札","土木一式工事","結城市武井","16:00:00","2026-08-05T15:00:00.000Z","・土木一式工事について、令和７・８年度建設工事入札参加資格者名簿に登載された格付けがS又はA等級であること\n・平成28年4月1日から競争参加資格確認申請の受付期間の末日までの期間に竣工した同種・類似工事を元請として施工した実績があること（共同企業体の場合は出資比率20％以上）\n・一級土木施工管理技士の資格を有する等、建設業法第26条に規定する主任技術者または監理技術者になり得る者\n・配置予定技術者は直接的かつ恒常的な雇用関係があり、申請日以前に3月以上の雇用関係があること\n・茨城県県西農林事務所管内（結城市、下妻市、常総市、筑西市、桜川市、結城郡八千代町、古河市、坂東市）に建設業法に基づく主たる営業所（本店）があること\n・土木一式工事について特定建設業の許可を受けていること\n・経営事項審査（土木一式工事）を契約締結日から1年7月以内の審査基準日で受審していること\n・対象工事の設計業務等の受託者（常陽測量設計株式会社）でないこと\n・受託者と資本又は人事面において関連がないこと\n・本工事の専任配置が必須（建設業法第26条第３項第１号、第２号等に該当する場合を除く）","【案件概要】\n茨城県農林水産部県西農林事務所が、県営畑地帯総合整備事業武井地区第８工区区画整理工事の一般競争入札を実施する。本工事は総合評価方式（事前審査方式）を採用し、ゼロ債務負担行為及び余裕期間設定工事である。工事場所は結城市武井地内で、予定価格は70,763,000円（税込）。令和８年７月10日公告、令和８年８月６日開札予定。\n\n【業務内容】\n- 整地","工：5.22ha（畑地）\n- 排水路工：L=231.7m\n- 支線道路工：L=878.0m\n- 道路側溝工：L=518.50m\n- 道路横断工：4.0箇所\n\n【応募要件】\n- 土木一式工事について令和７・８年度建設工事入札参加資格者名簿にS又はA等級で登載されていること\n- 平成28年4月1日以降に竣工した同種・類似工事の施工実績を有すること（同種：農地の区画整理工事、類似：農地のパイプライン工事または暗渠排水工事）\n- 一級土木施工管理技士の資格を有する等、建設業法第26条に規定する主任技術者または監理技術者になり得る者を配置予定技術者とすること\n- 茨城県県西農林事務所管内（結城市、下妻市、常総市、筑西市、桜川市、結城郡八千代町、古河市、坂東市）に建設業法に基づく主たる営業所（本店）があること\n- 土木一式工事について特定建設業の許可を受けていること\n- 経営事項審査を受審していること\n- 対象工事の設計業務等の受託者（常陽測量設計株式会社）でなく、受託者と資本・人事面で関連がないこと\n- 本工事への専任配置：要（建設業法第26条第３項第１号、第２号等に該当する場合を除く）\n- 配置予定技術者は直接的かつ恒常的な雇用関係にあり、申請日以前に3月以上の雇用関係があること\n\n【工期・期間】\n工期：令和９年２月10日限り。余裕期間設定工事（任意着手方式）により、落札者は契約締結日の翌日から令和９年２月10日までの期間内で工期の始期日を任意に設定することができる（休日を除く）。低入札価格調査等により余裕期間内に契約締結ならなかった場合は、契約締結日の翌日を工期の始期日とする。",true,"(redacted)",[29,30],{"url":27,"name":27},{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":9,"parentId":35,"parentName":35,"bidInfoUrl":35},null,[37],{"year":38,"count":39},2026,10,{"sameOrganization":41,"samePrefecture":63,"similar":88},[42,46,51,55,59],{"id":43,"title":44,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":45,"status":16},2262134,"【電子契約】【週休二日制】武井地区 第9工区区画整理工事【分割発注(とりおり)2\u002F2】",64141000,{"id":47,"title":48,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":49,"budget":50,"status":16},2262133,"【電子契約】【週休二日制】武井2期地区 区画整理付帯工事","2026-08-02T15:00:00.000Z",31845000,{"id":52,"title":53,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":49,"budget":54,"status":16},2262132,"【電子契約】【週休二日制】総上・豊加美3期地区 用水路付帯工事",20163000,{"id":56,"title":57,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":49,"budget":58,"status":16},2262131,"【電子契約】【週休二日制】総上・豊加美3期地区 区画整理付帯その2工事",25927000,{"id":60,"title":61,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":49,"budget":62,"status":16},2262130,"【電子契約】【週休二日制】総上・豊加美2期地区、総上・豊加美3期地区 区画整理付帯その1工事",31460000,[64,69,75,80,83],{"id":65,"title":66,"organizationName":67,"prefectureName":12,"publishedDate":13,"deadlineDate":68,"budget":35,"status":16},2299737,"【電子入札】【電子契約】情報交流棟北ウイング非常用発電点検整備作業","国立研究開発法人日本原子力研究開発機構本部","2026-08-19T15:00:00.000Z",{"id":70,"title":71,"organizationName":72,"prefectureName":12,"publishedDate":13,"deadlineDate":73,"budget":74,"status":16},2299566,"【入札公告】福祉第1号 文化福祉会館(1階)LED照明交換工事に係る条件付一般競争入札の実施について","茨城県大子町","2026-07-29T15:00:00.000Z",11899800,{"id":76,"title":77,"organizationName":78,"prefectureName":12,"publishedDate":13,"deadlineDate":79,"budget":35,"status":16},2299565,"間接水冷金標的 一式","大学共同利用機関法人高エネルギー加速器研究機構","2026-07-20T15:00:00.000Z",{"id":81,"title":82,"organizationName":78,"prefectureName":12,"publishedDate":13,"deadlineDate":49,"budget":35,"status":16},2299564,"PFリング横方向フィードバック用高周波アンプ 5台",{"id":84,"title":85,"organizationName":86,"prefectureName":12,"publishedDate":13,"deadlineDate":87,"budget":35,"status":16},2297553,"火山観測施設観測井掘削工事及び付帯工事(蔵王山)","独立行政法人防災科学技術研究所","2026-07-27T15:00:00.000Z",[89,94,97,101,106],{"id":90,"title":91,"organizationName":92,"prefectureName":92,"publishedDate":13,"deadlineDate":93,"budget":35,"status":16},2297563,"【入札公告(電子入札)】「普通乗用車(ステーションワゴン型・ハイブリッド・4WD)」等の購入に係る条件付き一般競争入札","群馬県","2026-07-14T15:00:00.000Z",{"id":95,"title":96,"organizationName":92,"prefectureName":92,"publishedDate":13,"deadlineDate":93,"budget":35,"status":16},2297562,"【入札公告(電子入札)】「蛍光比色計」の購入に係る条件付き一般競争入札",{"id":98,"title":99,"organizationName":67,"prefectureName":12,"publishedDate":13,"deadlineDate":100,"budget":35,"status":16},2297551,"【電子入札】【電子契約】空気捕集用ろ紙の購入","2026-08-30T15:00:00.000Z",{"id":102,"title":103,"organizationName":104,"prefectureName":12,"publishedDate":13,"deadlineDate":105,"budget":35,"status":16},2297550,"【電子入札】【電子契約】「常陽」情報漏洩等リスク軽減のためのセキュリティ対策","国立研究開発法人日本原子力研究開発機構大洗","2026-09-29T15:00:00.000Z",{"id":107,"title":108,"organizationName":67,"prefectureName":12,"publishedDate":13,"deadlineDate":109,"budget":35,"status":16},2297549,"【電子入札】【電子契約】多関節ロボットを用いた試料環境システムの購入","2026-09-01T15:00:00.000Z",[111,117,122,128],{"title":112,"link":113,"date":114,"thumb":115,"cat":116},"入札失注対策の完全ガイド｜原因分析から次回改善まで実務で使える手順","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Flost-bid-measures\u002F","2026-07-08T13:00:17","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_lost-bid-measures-300x167.webp","実務ノウハウ",{"title":118,"link":119,"date":120,"thumb":121,"cat":116},"入札 内訳書の書き方｜2025年改正対応・記載項目・注意点を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-breakdown-statement\u002F","2026-07-08T12:54:44","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-breakdown-statement-300x167.webp",{"title":123,"link":124,"date":125,"thumb":126,"cat":127},"入札説明書とは？確認すべき主要項目と仕様書との違いを徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-instructions\u002F","2026-07-08T12:52:35","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-instructions-300x167.webp","入札の基礎",{"title":129,"link":130,"date":131,"thumb":132,"cat":116},"前払金（公共工事）とは？仕組み・割合・手続きを実務担当者向けに解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fadvance-payment\u002F","2026-07-08T12:49:53","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_advance-payment-300x167.webp"]