[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-2262130":3,"bid-history-2262130":37,"bid-related-2262130":41,"union-latest":111},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":21,"deadlineTime":22,"openingDate":23,"qualificationText":24,"aiSummary":25,"aiSummaryGated":26,"aiSummaryTruncated":27,"sourceUrl":28,"budgetTaxIncluded":27,"documentUrls":29,"businessExperience":27,"localOffice":27,"securityRequirement":32,"qualifications":33,"certifications":34,"organization":35},2262130,"【電子契約】【週休二日制】総上・豊加美2期地区、総上・豊加美3期地区 区画整理付帯その1工事",2237,8,2,14,1,"茨城県 農林水産部 県西農林事務所土地改良部門","茨城県","2026-07-09T15:00:00.000Z","2026-08-02T15:00:00.000Z",31460000,"active","茨城県 農林水産部 県西農林事務所 土地改良部門","土木","一般競争入札","土木一式工事","下妻市小島","16:00:00","2026-08-03T15:00:00.000Z","・土木一式工事について令和7・8年度建設工事入札参加資格者名簿に登載された格付けA等級であること\n・茨城県内において、国・地方公共団体・特殊法人等の発注した同種工事のうち、平成28年4月1日から本入札の競争参加資格確認申請の受付期間の末日までの期間に竣工した工事を元請として施工した実績があること（共同企業体の構成員としての実績は出資比率20%以上のものに限る）\n・一級土木施工管理技士の資格を有する等、土木一式工事について主任技術者または監理技術者となり得る者であること\n・監理技術者として配置される場合は、監理技術者資格者証（土木一式工事に対応するもの）を有し、監理技術者講習を修了している者であること\n・茨城県県西農林事務所管内のうち、結城市、下妻市、常総市、筑西市、桜川市、結城郡八千代町、古河市、坂東市に建設業法に基づく主たる営業所（本店）があること\n・土木一式工事について特定建設業の許可を受けていること\n・契約締結日において、契約締結日から1年7月以内の審査基準日の経営事項審査を受けている者であること\n・対象工事の設計業務等の受託者ではないこと\n・受託者と資本または人事面において関連がない者であること","【案件概要】\n茨城県農林水産部県西農林事務所が、総上・豊加美2期地区および3期地区の区画整理付帯工事について一般競争入札を実施。工事場所は下妻市小島。予定価格は31,460,000円（税込）。本工事は総合評価方式（事前審査方式）による工事であり、施工実績等に加え企業の新規雇用計画（実績）を評価する。週休二日制工事、電子契約対象工事である。\n\n【業務内容】\n-","支線道路工（As舗装工）L=150.0m\n- 支線排水路法覆工 A=412.0m2\n- 付帯工 一式\n\n【応募要件】\n- 土木一式工事について令和7・8年度建設工事入札参加資格者名簿に登載された格付けA等級であること\n- 茨城県内において、国・地方公共団体・特殊法人等の発注した同種工事のうち、平成28年4月1日から競争参加資格確認申請の受付期間末日までに竣工した工事を元請として施工した実績があること（共同企業体の場合は出資比率20%以上）\n- 一級土木施工管理技士の資格を有する等、主任技術者または監理技術者となり得る者を配置すること\n- 茨城県県西農林事務所管内（結城市、下妻市、常総市、筑西市、桜川市、結城郡八千代町、古河市、坂東市）に建設業法に基づく主たる営業所（本店）があること\n- 土木一式工事について特定建設業の許可を受けていること\n- 対象工事の設計業務等の受託者（株式会社ジステック）でなく、受託者と資本または人事面において関連がない者\n\n【工期・期間】\n契約締結日の翌日から令和9年1月29日限りまで。本工事は余裕期間を設定した工事であり、落札者は余裕期間（契約締結日の翌日から令和9年1月29日までの期間）の範囲内で工期の始期日を任意に設定することができる。",true,"(redacted)",[30,31],{"url":28,"name":28},{"url":28,"name":28},false,[],[],{"id":6,"name":11,"categoryId":9,"parentId":36,"parentName":36,"bidInfoUrl":36},null,[38],{"year":39,"count":40},2026,10,{"sameOrganization":42,"samePrefecture":64,"similar":89},[43,48,52,56,60],{"id":44,"title":45,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":46,"budget":47,"status":16},2262135,"【電子入札】【週休二日制】武井地区 第8工区区画整理工事【分割発注(とりおり)1\u002F2】","2026-08-04T15:00:00.000Z",70763000,{"id":49,"title":50,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":46,"budget":51,"status":16},2262134,"【電子契約】【週休二日制】武井地区 第9工区区画整理工事【分割発注(とりおり)2\u002F2】",64141000,{"id":53,"title":54,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":55,"status":16},2262133,"【電子契約】【週休二日制】武井2期地区 区画整理付帯工事",31845000,{"id":57,"title":58,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":59,"status":16},2262132,"【電子契約】【週休二日制】総上・豊加美3期地区 用水路付帯工事",20163000,{"id":61,"title":62,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":63,"status":16},2262131,"【電子契約】【週休二日制】総上・豊加美3期地区 区画整理付帯その2工事",25927000,[65,70,76,81,84],{"id":66,"title":67,"organizationName":68,"prefectureName":12,"publishedDate":13,"deadlineDate":69,"budget":36,"status":16},2299737,"【電子入札】【電子契約】情報交流棟北ウイング非常用発電点検整備作業","国立研究開発法人日本原子力研究開発機構本部","2026-08-19T15:00:00.000Z",{"id":71,"title":72,"organizationName":73,"prefectureName":12,"publishedDate":13,"deadlineDate":74,"budget":75,"status":16},2299566,"【入札公告】福祉第1号 文化福祉会館(1階)LED照明交換工事に係る条件付一般競争入札の実施について","茨城県大子町","2026-07-29T15:00:00.000Z",11899800,{"id":77,"title":78,"organizationName":79,"prefectureName":12,"publishedDate":13,"deadlineDate":80,"budget":36,"status":16},2299565,"間接水冷金標的 一式","大学共同利用機関法人高エネルギー加速器研究機構","2026-07-20T15:00:00.000Z",{"id":82,"title":83,"organizationName":79,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":36,"status":16},2299564,"PFリング横方向フィードバック用高周波アンプ 5台",{"id":85,"title":86,"organizationName":87,"prefectureName":12,"publishedDate":13,"deadlineDate":88,"budget":36,"status":16},2297553,"火山観測施設観測井掘削工事及び付帯工事(蔵王山)","独立行政法人防災科学技術研究所","2026-07-27T15:00:00.000Z",[90,94,99,103,107],{"id":91,"title":92,"organizationName":68,"prefectureName":12,"publishedDate":13,"deadlineDate":93,"budget":36,"status":16},2297551,"【電子入札】【電子契約】空気捕集用ろ紙の購入","2026-08-30T15:00:00.000Z",{"id":95,"title":96,"organizationName":97,"prefectureName":12,"publishedDate":13,"deadlineDate":98,"budget":36,"status":16},2297550,"【電子入札】【電子契約】「常陽」情報漏洩等リスク軽減のためのセキュリティ対策","国立研究開発法人日本原子力研究開発機構大洗","2026-09-29T15:00:00.000Z",{"id":100,"title":101,"organizationName":68,"prefectureName":12,"publishedDate":13,"deadlineDate":102,"budget":36,"status":16},2297549,"【電子入札】【電子契約】多関節ロボットを用いた試料環境システムの購入","2026-09-01T15:00:00.000Z",{"id":104,"title":105,"organizationName":68,"prefectureName":12,"publishedDate":13,"deadlineDate":106,"budget":36,"status":16},2297548,"【電子入札】【電子契約】自火報移報ラインの整備","2026-09-03T15:00:00.000Z",{"id":108,"title":109,"organizationName":68,"prefectureName":12,"publishedDate":13,"deadlineDate":110,"budget":36,"status":16},2297547,"【電子入札】【電子契約】令和8年度 気象観測機器の保守点検","2026-09-07T15:00:00.000Z",[112,118,123,129],{"title":113,"link":114,"date":115,"thumb":116,"cat":117},"入札失注対策の完全ガイド｜原因分析から次回改善まで実務で使える手順","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Flost-bid-measures\u002F","2026-07-08T13:00:17","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_lost-bid-measures-300x167.webp","実務ノウハウ",{"title":119,"link":120,"date":121,"thumb":122,"cat":117},"入札 内訳書の書き方｜2025年改正対応・記載項目・注意点を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-breakdown-statement\u002F","2026-07-08T12:54:44","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-breakdown-statement-300x167.webp",{"title":124,"link":125,"date":126,"thumb":127,"cat":128},"入札説明書とは？確認すべき主要項目と仕様書との違いを徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-instructions\u002F","2026-07-08T12:52:35","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-instructions-300x167.webp","入札の基礎",{"title":130,"link":131,"date":132,"thumb":133,"cat":117},"前払金（公共工事）とは？仕組み・割合・手続きを実務担当者向けに解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fadvance-payment\u002F","2026-07-08T12:49:53","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_advance-payment-300x167.webp"]