[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-2262113":3,"bid-history-2262113":36,"bid-related-2262113":40,"union-latest":106},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":21,"deadlineTime":22,"openingDate":23,"qualificationText":24,"aiSummary":25,"aiSummaryGated":26,"aiSummaryTruncated":27,"sourceUrl":28,"budgetTaxIncluded":15,"documentUrls":29,"businessExperience":27,"localOffice":27,"securityRequirement":31,"qualifications":32,"certifications":33,"organization":34},2262113,"令和8年度 鈴鹿川下流部河道整備工事",252,24,2,14,1,"国土交通省中部地方整備局","三重県","2026-07-09T15:00:00.000Z","2026-07-20T15:00:00.000Z",null,"active","三重河川国道事務所","土木","一般競争入札","河川工事・土木工事","三重県四日市市塩浜町","16:00:00","2026-08-26T15:00:00.000Z","・中部地方整備局における一般土木工事に係るC等級の令和7・8年度一般競争参加資格の認定を受けていること\n・平成23年度以降に元請けとして河川における護岸工事の引渡しを完了した実績を有すること（共同企業体の場合は出資比率20%以上の構成員に限定。乙型は分担工事の実績に限定）\n・特に矢板工（仮設工を除く）の施工実績を「より同種性が高い」と評価\n・張芝の施工実績は認めない\n・監理技術者又は主任技術者を当該工事に専任で配置できること。ただし、専任特例を活用する場合は専任を求めない\n・配置予定技術者が、入札説明書に示す資格を有する者であること\n・同一の者が元請けとして河川における護岸工事の経験を有する者であること\n・令和3年4月1日から令和7年3月31日までの4年間に中部地方整備局が発注した工事実績がある場合、当該工事種別の工事成績評定点の平均が65点以上であること\n・建設業法に基づく本店、支店又は営業所が三重県四日市市、三重郡朝日町・川越町・菰野町、鈴鹿市、亀山市に所在すること。支店又は営業所の場合は三重県内に本店を有すること\n・予定価格の制限範囲内の価格をもって入札すること\n・評価値が基準評価値以上であること\n・競争参加資格確認申請書提出期限から開札時までの期間に中部地方整備局から指名停止を受けていないこと\n・暴力団員が実質的に経営を支配する建設業者でないこと\n・当該工事に係る設計業務等の受託者又は当該受託者と資本若しくは人事面において関連がある建設業者でないこと\n・入札に参加する者の間に資本関係又は人的関係がないこと","【案件概要】\n国土交通省中部地方整備局三重河川国道事務所が令和8年度鈴鹿川下流部河道整備工事の一般競争入札を実施する。本工事は三重県四日市市塩浜町を工事場所とし、河川土工、矢板護岸工、根固め工、仮設工を含む河道整備工事である。工期は契約締結日の翌日から令和9年2月26日までであり、工事の始期は令和8年9月18日までに設定する必要がある。本工事は施工体制確認型","総合評価落札方式（施工能力評価型Ⅱ型）の試行工事であり、価格以外の要素と価格を総合的に評価して落札者を決定する。予算規模は詳細不明だが、複数の試行制度（フレックス工期、総価契約単価合意方式、生産性向上チャレンジ、BIM\u002FCIM活用等）を適用する新型工事である。\n\n【業務内容】\n- 河川土工 1式\n- 矢板護岸工 1式\n- 根固め工 1式\n- 仮設工 1式\n- 建設資材の分別解体等及び特定建設資材廃棄物の再資源化等\n\n【応募要件】\n- 中部地方整備局における一般土木工事に係るC等級の令和7・8年度一般競争参加資格の認定を受けていること\n- 平成23年度以降に元請けとして河川における護岸工事の引渡しを完了した実績を有すること（共同企業体の場合は出資比率20%以上の構成員が対象、乙型は分担工事の実績に限定）。特に矢板工（仮設工を除く）の施工実績を「より同種性が高い」と評価\n- 張芝の施工実績は認めない\n- 監理技術者又は主任技術者を当該工事に専任で配置できることまたは専任特例を活用できること\n- 配置予定の監理技術者又は主任技術者が、入札説明書に示す資格を有する者であること\n- 同一の者が元請けとして河川における護岸工事の経験を有すること（平成23年度以降の実績でなくても可、品質証明員等としての経験は除外）\n- 予定価格の制限範囲内の入札価格であること\n- 令和3年4月1日から令和7年3月31日までの4年間に中部地方整備局が発注した工事実績がある場合、当該工事種別の工事成績評定点の平均が65点以上であること\n- 建設業法に基づく本店、支店又は営業所が三重県四日市市、三重郡朝日町・川越町・菰野町、鈴鹿市、亀山市に所在すること。支店又は営業所の場合は三重県内に本店が所在すること\n- 経常建設共同企業体として申請する場合、構成員のうち1社が全ての要件を満たし、他の構成員はいずれかの要件を満たす施工実績を有すること\n- 競争参加資格確認申請書提出期限から開札時までの期間に中部地方整備局から指名停止を受けていないこと\n- 暴力団員が実質的に経営を支配する建設業者でないこと\n- 当該工事に係る設計業務等の受託者又は当該受託者と資本若しくは人事面において関連がある建設業者でないこと\n- 入札に参加する者の間に資本関係又は人的関係がないこと\n- 予定価格の制限の範囲内の価格をもって入札すること\n- 評価値が基準評価値（標準点100点を予定価格で除した数値）以上であること\n\n【工期・期間】\n契約締結日の翌日から令和9年2月26日まで。ただし、令和8年9月18日までに工事の始期を設定すること。本工事はフレックス工期を採用しており、受注者が全体工期内で工事の始期を任意に設定できる。前余裕期間（契約締結から工事始期前日までの期間）内は監理技術者等の配置を要しない。",true,"(redacted)",[30],{"url":28,"name":28},false,[],[],{"id":6,"name":11,"categoryId":35,"parentId":15,"parentName":15,"bidInfoUrl":15},17,[37],{"year":38,"count":39},2026,241,{"sameOrganization":41,"samePrefecture":62,"similar":82},[42,47,51,55,59],{"id":43,"title":44,"organizationName":11,"prefectureName":45,"publishedDate":13,"deadlineDate":46,"budget":15,"status":16},2296679,"令和8年度 中部地方整備局災害対策通信設備製造一式","愛知県","2026-09-06T15:00:00.000Z",{"id":48,"title":49,"organizationName":11,"prefectureName":45,"publishedDate":13,"deadlineDate":50,"budget":15,"status":16},2296672,"令和8年度 富士砂防事務所空調設備改修作業","2026-07-26T15:00:00.000Z",{"id":52,"title":53,"organizationName":11,"prefectureName":45,"publishedDate":13,"deadlineDate":54,"budget":15,"status":16},2296647,"令和8年度 連絡車1台交換購入(多治見)","2026-07-21T15:00:00.000Z",{"id":56,"title":57,"organizationName":11,"prefectureName":45,"publishedDate":13,"deadlineDate":58,"budget":15,"status":16},2262114,"令和8年度 23号豊橋BP大清水高架橋B3PC上部工事","2026-07-23T15:00:00.000Z",{"id":60,"title":61,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},2262112,"令和8年度 42号大台管内歩道整備工事",[63,67,72,75,78],{"id":64,"title":65,"organizationName":66,"prefectureName":12,"publishedDate":13,"deadlineDate":15,"budget":15,"status":16},2299746,"四日市南警察署清心寮改修工事に係る質問及び回答について","国家公安委員会(警察庁)三重県警察",{"id":68,"title":69,"organizationName":70,"prefectureName":12,"publishedDate":13,"deadlineDate":71,"budget":15,"status":16},2296681,"令和8年度 地籍調査事業源緑輪中45地区業務委託","三重県木曾岬町","2026-07-16T15:00:00.000Z",{"id":73,"title":74,"organizationName":70,"prefectureName":12,"publishedDate":13,"deadlineDate":71,"budget":15,"status":16},2296678,"令和8年度 東部地区クリーンセンター機器オーバーホール工事",{"id":76,"title":77,"organizationName":70,"prefectureName":12,"publishedDate":13,"deadlineDate":54,"budget":15,"status":16},2296492,"令和8年度 町道外平喜・小学校線避難路整備工事",{"id":79,"title":80,"organizationName":81,"prefectureName":12,"publishedDate":13,"deadlineDate":58,"budget":15,"status":16},2262119,"R8国道42号区画線設置工事","国土交通省近畿地方整備局",[83,89,94,98,103],{"id":84,"title":85,"organizationName":15,"prefectureName":86,"publishedDate":87,"deadlineDate":88,"budget":15,"status":16},2313381,"令和8年度広町配水管布設工事","神奈川県","2026-07-10T15:00:00.000Z","2026-11-12T15:00:00.000Z",{"id":90,"title":91,"organizationName":15,"prefectureName":86,"publishedDate":87,"deadlineDate":92,"budget":93,"status":16},2313379,"令和8年度 市道東原14号線道路維持補修工事","2026-11-23T15:00:00.000Z",55430000,{"id":95,"title":96,"organizationName":15,"prefectureName":86,"publishedDate":87,"deadlineDate":97,"budget":15,"status":16},2313376,"(小土工307)令和8年度 河川修繕工事 県単(その30)","2026-11-29T15:00:00.000Z",{"id":99,"title":100,"organizationName":101,"prefectureName":102,"publishedDate":13,"deadlineDate":15,"budget":15,"status":16},2299748,"令和8年7月10日通知 建築計画概要書窓口端末賃貸借その3(長期継続契約)に係る随意契約(見積合せ)の実施について(建築指導課)","岩手県盛岡市","岩手県",{"id":104,"title":105,"organizationName":101,"prefectureName":102,"publishedDate":13,"deadlineDate":15,"budget":15,"status":16},2299747,"令和8年7月10日通知 プロジェクターの購入に係る随意契約(見積合せ)の実施について(建築指導課)",[107,113,118,124],{"title":108,"link":109,"date":110,"thumb":111,"cat":112},"入札失注対策の完全ガイド｜原因分析から次回改善まで実務で使える手順","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Flost-bid-measures\u002F","2026-07-08T13:00:17","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_lost-bid-measures-300x167.webp","実務ノウハウ",{"title":114,"link":115,"date":116,"thumb":117,"cat":112},"入札 内訳書の書き方｜2025年改正対応・記載項目・注意点を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-breakdown-statement\u002F","2026-07-08T12:54:44","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-breakdown-statement-300x167.webp",{"title":119,"link":120,"date":121,"thumb":122,"cat":123},"入札説明書とは？確認すべき主要項目と仕様書との違いを徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-instructions\u002F","2026-07-08T12:52:35","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-instructions-300x167.webp","入札の基礎",{"title":125,"link":126,"date":127,"thumb":128,"cat":112},"前払金（公共工事）とは？仕組み・割合・手続きを実務担当者向けに解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fadvance-payment\u002F","2026-07-08T12:49:53","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_advance-payment-300x167.webp"]