[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-2262102":3,"bid-history-2262102":35,"bid-related-2262102":39,"union-latest":110},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":21,"deadlineTime":22,"openingDate":14,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"budgetTaxIncluded":15,"documentUrls":28,"businessExperience":26,"localOffice":26,"securityRequirement":30,"qualifications":31,"certifications":32,"organization":33},2262102,"令和7年度 宇城農地整備事業 出村・宇土割工区区画整理(その3)工事",1450,43,2,14,1,"農林水産省九州農政局","熊本県","2026-07-09T15:00:00.000Z","2026-08-23T15:00:00.000Z",null,"active","宇城農地整備事業所","土木","一般競争入札","土木一式工事","熊本県宇城市小川町新田出地内","12:00:00","・九州農政局管内における建設工事に係る令和7・8年度一般競争参加資格を付与されている有資格者業者のうち、土木一式工事「B等級又はC等級」の確認を受けている者\n・予決令第70条及び第71条の規定に該当しない者\n・会社更生法又は民事再生法に基づき手続開始の申立てがなされていない者（手続開始決定後に別定手続による再確認を受けた者を除く）\n・宇城管内（宇土市、宇城市、下益城郡美里町）に建設業法に基づく本社（店）を有する者\n・平成23年4月1日～令和8年3月31日の期間に元請として完成・引渡しが完了した同種工事（土工事）の施工実績を有する者\n・別表1①に示す期間に元請として完成・引渡しが完了した同種工事の工事経験を有する者\n・申請書及び確認資料提出期限の日から開札時までの期間に指名停止を受けていない者\n・10年以上の土木一式工事の実務経験を有する監理技術者又は主任技術者を専任で配置できる者\n・設計業務等の受託者又は資本・人事面で関連がある建設業者でないこと\n・健康保険法、厚生年金保険法、雇用保険法の届出義務を履行していることの確認書を提出すること\n・暴力団員が実質的に経営を支配する建設業者又はこれに準ずるものでないこと\n・同一入札に参加する複数の者の間に資本関係又は人的関係がないこと","【案件概要】\n農林水産省九州農政局宇城農地整備事業所が、令和7年度宇城農地整備事業出村・宇土割工区区画整理（その3）工事を一般競争入札（標準型）で実施する。対象地域は熊本県宇城市小川町新田出地内。工事概要は約3.71haのほ場整備で、整地工、用水路工（管水路）、排水路工（開水路）、道路工、附帯工を実施する。施工体制確認型総合評価落札方式（簡易Ⅱ型（企業実績重","視型））により、価格と価格以外の要素を総合評価して落札者を決定する予定。\n\n【業務内容】\n- 区画整理（A=3.71ha）\n- 整地工（A=2.67ha）\n- 用水路工（管水路）（L=509.5ｍ）\n- 排水路工（開水路）（L=430.9ｍ）\n- 道路工（L=162.3ｍ）\n- 附帯工（1式）\n- 分別解体等及び特定建設資材廃棄物の再資源化\n- 情報化施工技術の活用（ICT活用による生産性及び施工品質の向上）\n- 契約締結後のVE提案受付\n\n【応募要件】\n- 九州農政局管内における建設工事に係る令和7・8年度一般競争参加資格を付与されている有資格者業者のうち、土木一式工事「B等級又はC等級」の確認を受けている者\n- 予決令第70条及び第71条の規定に該当しない者\n- 会社更生法又は民事再生法に基づき手続開始の申立てがなされていない者（手続開始決定後に別定手続による再確認を受けた者を除く）\n- 宇城管内（宇土市、宇城市、下益城郡美里町）に建設業法に基づく本社（店）を有する者\n- 平成23年4月1日～令和8年3月31日の期間に元請として完成・引渡しが完了した同種工事（土工事）の施工実績を有する者（共同企業体の場合は構成員のうち1者が対象、出資比率20%以上のみ）\n- 別表1①に示す期間に元請として完成・引渡しが完了した同種工事の工事経験を有する者（1年未満の工期で1\u002F2以上、1年以上の工期で6か月以上の従事期間）\n- 申請書及び確認資料提出期限の日から開札時までの期間に指名停止を受けていない者\n- 10年以上の土木一式工事の実務経験を有する監理技術者又は主任技術者を専任で配置できる者\n- 監理技術者は監理技術者資格者証及び監理技術者講習修了証を有する者\n- 主任技術者は指定学科卒業後の実務経験者、1級・2級国家資格者、技術士等の資格を有する者\n- 設計業務等の受託者又は資本・人事面で関連がある建設業者でないこと\n- 健康保険法、厚生年金保険法、雇用保険法の届出義務を履行しているかの確認書を提出すること\n- 暴力団員が実質的に経営を支配する建設業者又はこれに準ずるものでないこと\n- 同一入札に参加する複数の者の間に資本関係又は人的関係がないこと\n\n【工期・期間】\n予定工期は166日間。令和8年9月24日～令和9年3月8日。入札説明書の交付期間は令和8年7月10日から令和8年7月23日まで。申請書及び確認資料の提出期間は令和8年7月10日から令和8年8月7日まで。入札期間は令和8年8月19日から令和8年8月21日まで（最終日は午前12時まで）。開札日時は令和8年8月24日午前9時30分。",true,"(redacted)",[29],{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":34,"parentId":15,"parentName":15,"bidInfoUrl":15},141,[36],{"year":37,"count":38},2026,55,{"sameOrganization":40,"samePrefecture":60,"similar":86},[41,44,48,51,55],{"id":42,"title":43,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},2262103,"令和7年度 宇城農地整備事業 出村・宇土割工区区画整理(その4)工事",{"id":45,"title":46,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":47,"budget":15,"status":16},2262101,"令和7年度 宇城農地整備事業 亀松工区区画整理(その5)工事","2026-08-19T15:00:00.000Z",{"id":49,"title":50,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":47,"budget":15,"status":16},2262100,"令和7年度 宇城農地整備事業 亀松工区区画整理(その6)工事",{"id":52,"title":53,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":54,"budget":15,"status":16},2262099,"令和7年度 宇城農地整備事業 亀松工区区画整理(その7)工事","2026-08-20T15:00:00.000Z",{"id":56,"title":57,"organizationName":11,"prefectureName":58,"publishedDate":13,"deadlineDate":59,"budget":15,"status":16},2262098,"令和7年度駅館川農地整備事業 平山支線水路(その5・6)仮回し管工事","大分県","2026-08-27T15:00:00.000Z",[61,66,71,77,81],{"id":62,"title":63,"organizationName":64,"prefectureName":12,"publishedDate":13,"deadlineDate":65,"budget":15,"status":16},2297962,"令和7年度(補正)霧島錦江湾国立公園指宿園地長寿命化改修工事(再度公告)","環境省九州地方環境事務所","2026-07-30T15:00:00.000Z",{"id":67,"title":68,"organizationName":69,"prefectureName":12,"publishedDate":13,"deadlineDate":70,"budget":15,"status":16},2297960,"熊本第二合同庁舎中央監視装置更新工事","法務省熊本地方法務局","2026-08-24T15:00:00.000Z",{"id":72,"title":73,"organizationName":74,"prefectureName":12,"publishedDate":13,"deadlineDate":75,"budget":76,"status":16},2297959,"【公募型プロポーザル】熊本市広報効果検証及び戦略的活用提案業務委託について","熊本県熊本市","2026-07-23T15:00:00.000Z",7000000,{"id":78,"title":63,"organizationName":79,"prefectureName":12,"publishedDate":13,"deadlineDate":80,"budget":15,"status":16},2297958,"環境省","2026-07-16T15:00:00.000Z",{"id":82,"title":83,"organizationName":64,"prefectureName":12,"publishedDate":84,"deadlineDate":85,"budget":15,"status":16},2248093,"令和8年度阿蘇くじゅう国立公園における牧野の新たな利用支援業務","2026-07-08T15:00:00.000Z","2026-07-20T15:00:00.000Z",[87,93,98,102,107],{"id":88,"title":89,"organizationName":15,"prefectureName":90,"publishedDate":91,"deadlineDate":92,"budget":15,"status":16},2313381,"令和8年度広町配水管布設工事","神奈川県","2026-07-10T15:00:00.000Z","2026-11-12T15:00:00.000Z",{"id":94,"title":95,"organizationName":15,"prefectureName":90,"publishedDate":91,"deadlineDate":96,"budget":97,"status":16},2313379,"令和8年度 市道東原14号線道路維持補修工事","2026-11-23T15:00:00.000Z",55430000,{"id":99,"title":100,"organizationName":15,"prefectureName":90,"publishedDate":91,"deadlineDate":101,"budget":15,"status":16},2313376,"(小土工307)令和8年度 河川修繕工事 県単(その30)","2026-11-29T15:00:00.000Z",{"id":103,"title":104,"organizationName":105,"prefectureName":106,"publishedDate":13,"deadlineDate":15,"budget":15,"status":16},2299748,"令和8年7月10日通知 建築計画概要書窓口端末賃貸借その3(長期継続契約)に係る随意契約(見積合せ)の実施について(建築指導課)","岩手県盛岡市","岩手県",{"id":108,"title":109,"organizationName":105,"prefectureName":106,"publishedDate":13,"deadlineDate":15,"budget":15,"status":16},2299747,"令和8年7月10日通知 プロジェクターの購入に係る随意契約(見積合せ)の実施について(建築指導課)",[111,117,122,128],{"title":112,"link":113,"date":114,"thumb":115,"cat":116},"入札失注対策の完全ガイド｜原因分析から次回改善まで実務で使える手順","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Flost-bid-measures\u002F","2026-07-08T13:00:17","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_lost-bid-measures-300x167.webp","実務ノウハウ",{"title":118,"link":119,"date":120,"thumb":121,"cat":116},"入札 内訳書の書き方｜2025年改正対応・記載項目・注意点を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-breakdown-statement\u002F","2026-07-08T12:54:44","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-breakdown-statement-300x167.webp",{"title":123,"link":124,"date":125,"thumb":126,"cat":127},"入札説明書とは？確認すべき主要項目と仕様書との違いを徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-instructions\u002F","2026-07-08T12:52:35","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-instructions-300x167.webp","入札の基礎",{"title":129,"link":130,"date":131,"thumb":132,"cat":116},"前払金（公共工事）とは？仕組み・割合・手続きを実務担当者向けに解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fadvance-payment\u002F","2026-07-08T12:49:53","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_advance-payment-300x167.webp"]