[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-2262101":3,"bid-history-2262101":35,"bid-related-2262101":39,"union-latest":110},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":21,"deadlineTime":22,"openingDate":14,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"budgetTaxIncluded":15,"documentUrls":28,"businessExperience":26,"localOffice":26,"securityRequirement":30,"qualifications":31,"certifications":32,"organization":33},2262101,"令和7年度 宇城農地整備事業 亀松工区区画整理(その5)工事",1450,43,2,14,1,"農林水産省九州農政局","熊本県","2026-07-09T15:00:00.000Z","2026-08-19T15:00:00.000Z",null,"active","宇城農地整備事業所","土木","一般競争入札","土木一式工事、区画整理、ほ場整備工事","熊本県宇城市不知火町亀松地内","12:00:00","・九州農政局管内における建設工事に係る令和7・8年度一般競争（指名競争）参加資格を有し、土木一式工事「B等級又はC等級」の確認を受けている者（開札時までに確認を受けている者を含む）\n・宇城管内（宇土市、宇城市、下益城郡美里町）に建設業法に基づく本社（店）を有すること\n・平成23年4月1日～令和8年3月31日の期間に、元請として完成・引渡しが完了した土工事の施工実績を有すること（共同企業体の場合は構成員のうち1者が該当、出資比率20%以上のもの）\n・監理技術者又は主任技術者を当該工事に専任で配置できること\n・監理技術者は監理技術者資格者証及び監理技術者講習修了証を有する者\n・主任技術者は以下のいずれかに該当：10年以上の土木一式工事実務経験を有する者、1級国家資格者（土木施工管理技士、建設機械施工技士）、2級国家資格者（土木施工管理技士（土木）、建設機械施工技士）、技術士（建設部門、農業部門、森林部門、水産部門、総合技術監理部門など）、国土交通大臣特別認定者、指定学科卒業後に土木一式工事で実務経験を有する者、大学卒3年以上、高度専門士3年以上、高等学校5年以上、専修学校5年以上、高等専門学校3年以上、専門士3年以上\n・予決令第70条及び第71条の規定に該当しない者\n・会社更生法又は民事再生法に基づき再生手続開始の申立てがなされていない者（再確認を受けた者を除く）\n・申請書及び確認資料の提出期限の日から開札時までの期間に「九州農政局工事請負契約指名停止等措置要領」に基づく指名停止を受けていないこと\n・健康保険法第48条、厚生年金保険法第27条、雇用保険法第7条の届出義務を履行していることの確認\n・暴力団員が実質的に経営を支配する建設業者又はこれに準ずるものでないこと\n・同一入札に参加しようとする複数の者の間に資本関係又は人的関係がないこと\n・設計業務等の受託者又は当該受託者と資本若しくは人事面において関連がある建設業者でないこと","【案件概要】\n農林水産省九州農政局が、熊本県宇城市不知火町亀松地内において実施する「令和7年度宇城農地整備事業亀松工区区画整理（その5）工事」の一般競争入札（標準型）を公告。本工事は国営宇城土地改良事業計画に基づくほ場整備工事であり、2026年7月10日に公告され、2026年8月20日に開札予定。総合評価落札方式（簡易Ⅱ型企業実績重視型）を採用し、施工体制確","認型総合評価方式により価格と価格以外の要素を総合的に評価。工期は予定工期166日間（令和8年9月24日～令和9年3月8日）。\n\n【業務内容】\n- 区画整理：2.35ha\n- 整地工：1.22ha\n- 用水路工（管水路）：282.6m\n- 排水路工（開水路）：293.8m\n- 道路工：313.5m\n- 附帯工：1式\n- 情報化施工技術（ICT）を活用した施工・出来形管理\n- 分別解体等及び特定建設資材廃棄物の再資源化等実施\n- 契約後VE（バリューエンジニアリング）方式による施工方法の提案受付\n\n【応募要件】\n- 九州農政局管内における建設工事に係る令和7・8年度一般競争（指名競争）参加資格を有し、土木一式工事「B等級又はC等級」の確認を受けている者（開札時までに確認を受けている者を含む）\n- 宇城管内（宇土市、宇城市、下益城郡美里町）に建設業法に基づく本社（店）を有すること\n- 平成23年4月1日～令和8年3月31日（過去15年間）に、元請として完成・引渡しが完了した土工事の施工実績を有すること（共同企業体の場合は構成員のうち1者、出資比率20%以上）\n- 監理技術者又は主任技術者を当該工事に専任で配置できること\n- 監理技術者：監理技術者資格者証及び監理技術者講習修了証を有する者\n- 主任技術者：10年以上の土木一式工事実務経験を有する者、または1級国家資格者（土木施工管理技士、建設機械施工技士）、2級国家資格者（土木施工管理技士（土木）、建設機械施工技士）、技術士、高等学校5年以上卒業者、高度専門士、専門士3年以上卒業者など\n- 予決令第70条及び第71条の規定に該当しない者\n- 会社更生法に基づき更生手続開始の申立てがなされていない者（ただし、再確認を受けた者を除く）\n- 民事再生法に基づき再生手続開始の申立てがなされていない者（ただし、再確認を受けた者を除く）\n- 申請書及び確認資料の提出期限の日から開札時までの期間に指名停止を受けていないこと\n- 健康保険法、厚生年金保険法、雇用保険法の届出義務を履行していることを確認できる通知書の写しを提出\n- 暴力団員が実質的に経営を支配する建設業者又はこれに準ずるものでないこと\n- 同一入札に参加しようとする複数の者の間に資本関係又は人的関係がないこと\n- 設計業務等の受託者又は当該受託者と資本若しくは人事面において関連がある建設業者でないこと\n\n【工期・期間】\n契約締結後、予定工期166日間で令和8年9月24日から令和9年3月8日まで。余裕期間制度を活用。",true,"(redacted)",[29],{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":34,"parentId":15,"parentName":15,"bidInfoUrl":15},141,[36],{"year":37,"count":38},2026,55,{"sameOrganization":40,"samePrefecture":60,"similar":86},[41,45,48,51,55],{"id":42,"title":43,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":44,"budget":15,"status":16},2262103,"令和7年度 宇城農地整備事業 出村・宇土割工区区画整理(その4)工事","2026-08-23T15:00:00.000Z",{"id":46,"title":47,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":44,"budget":15,"status":16},2262102,"令和7年度 宇城農地整備事業 出村・宇土割工区区画整理(その3)工事",{"id":49,"title":50,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},2262100,"令和7年度 宇城農地整備事業 亀松工区区画整理(その6)工事",{"id":52,"title":53,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":54,"budget":15,"status":16},2262099,"令和7年度 宇城農地整備事業 亀松工区区画整理(その7)工事","2026-08-20T15:00:00.000Z",{"id":56,"title":57,"organizationName":11,"prefectureName":58,"publishedDate":13,"deadlineDate":59,"budget":15,"status":16},2262098,"令和7年度駅館川農地整備事業 平山支線水路(その5・6)仮回し管工事","大分県","2026-08-27T15:00:00.000Z",[61,66,71,77,81],{"id":62,"title":63,"organizationName":64,"prefectureName":12,"publishedDate":13,"deadlineDate":65,"budget":15,"status":16},2297962,"令和7年度(補正)霧島錦江湾国立公園指宿園地長寿命化改修工事(再度公告)","環境省九州地方環境事務所","2026-07-30T15:00:00.000Z",{"id":67,"title":68,"organizationName":69,"prefectureName":12,"publishedDate":13,"deadlineDate":70,"budget":15,"status":16},2297960,"熊本第二合同庁舎中央監視装置更新工事","法務省熊本地方法務局","2026-08-24T15:00:00.000Z",{"id":72,"title":73,"organizationName":74,"prefectureName":12,"publishedDate":13,"deadlineDate":75,"budget":76,"status":16},2297959,"【公募型プロポーザル】熊本市広報効果検証及び戦略的活用提案業務委託について","熊本県熊本市","2026-07-23T15:00:00.000Z",7000000,{"id":78,"title":63,"organizationName":79,"prefectureName":12,"publishedDate":13,"deadlineDate":80,"budget":15,"status":16},2297958,"環境省","2026-07-16T15:00:00.000Z",{"id":82,"title":83,"organizationName":64,"prefectureName":12,"publishedDate":84,"deadlineDate":85,"budget":15,"status":16},2248093,"令和8年度阿蘇くじゅう国立公園における牧野の新たな利用支援業務","2026-07-08T15:00:00.000Z","2026-07-20T15:00:00.000Z",[87,93,98,102,107],{"id":88,"title":89,"organizationName":15,"prefectureName":90,"publishedDate":91,"deadlineDate":92,"budget":15,"status":16},2313381,"令和8年度広町配水管布設工事","神奈川県","2026-07-10T15:00:00.000Z","2026-11-12T15:00:00.000Z",{"id":94,"title":95,"organizationName":15,"prefectureName":90,"publishedDate":91,"deadlineDate":96,"budget":97,"status":16},2313379,"令和8年度 市道東原14号線道路維持補修工事","2026-11-23T15:00:00.000Z",55430000,{"id":99,"title":100,"organizationName":15,"prefectureName":90,"publishedDate":91,"deadlineDate":101,"budget":15,"status":16},2313376,"(小土工307)令和8年度 河川修繕工事 県単(その30)","2026-11-29T15:00:00.000Z",{"id":103,"title":104,"organizationName":105,"prefectureName":106,"publishedDate":13,"deadlineDate":15,"budget":15,"status":16},2299748,"令和8年7月10日通知 建築計画概要書窓口端末賃貸借その3(長期継続契約)に係る随意契約(見積合せ)の実施について(建築指導課)","岩手県盛岡市","岩手県",{"id":108,"title":109,"organizationName":105,"prefectureName":106,"publishedDate":13,"deadlineDate":15,"budget":15,"status":16},2299747,"令和8年7月10日通知 プロジェクターの購入に係る随意契約(見積合せ)の実施について(建築指導課)",[111,117,122,128],{"title":112,"link":113,"date":114,"thumb":115,"cat":116},"入札失注対策の完全ガイド｜原因分析から次回改善まで実務で使える手順","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Flost-bid-measures\u002F","2026-07-08T13:00:17","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_lost-bid-measures-300x167.webp","実務ノウハウ",{"title":118,"link":119,"date":120,"thumb":121,"cat":116},"入札 内訳書の書き方｜2025年改正対応・記載項目・注意点を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-breakdown-statement\u002F","2026-07-08T12:54:44","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-breakdown-statement-300x167.webp",{"title":123,"link":124,"date":125,"thumb":126,"cat":127},"入札説明書とは？確認すべき主要項目と仕様書との違いを徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-instructions\u002F","2026-07-08T12:52:35","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-instructions-300x167.webp","入札の基礎",{"title":129,"link":130,"date":131,"thumb":132,"cat":116},"前払金（公共工事）とは？仕組み・割合・手続きを実務担当者向けに解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fadvance-payment\u002F","2026-07-08T12:49:53","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_advance-payment-300x167.webp"]