[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-2249700":3,"bid-history-2249700":34,"bid-related-2249700":38,"union-latest":82},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":11,"deadlineTime":15,"openingDate":21,"qualificationText":22,"aiSummary":23,"aiSummaryGated":24,"aiSummaryTruncated":25,"sourceUrl":26,"budgetTaxIncluded":15,"documentUrls":27,"businessExperience":29,"localOffice":25,"securityRequirement":29,"qualifications":30,"certifications":31,"organization":32},2249700,"市道西津屋線道路改良工事",1013,42,2,15,1,"長崎県対馬市","長崎県","2026-07-08T15:00:00.000Z","2026-07-16T15:00:00.000Z",null,"active","対馬市建設部 建設課","舗装","一般競争入札","工事","2026-08-17T15:00:00.000Z","・地方自治法施行令（昭和22年政令第16号）第167条の4の規定に該当しない者\n・令和8年度対馬市競争入札参加資格者名簿に登載されている者\n・会社更生法又は民事再生法に基づき、更正手続き又は再生手続きの開始の申し立てがなされていない者\n・不渡手形又は不渡小切手を発行し銀行当座取引停止を受ける等、経営状況が著しく不健全でない者\n・公告日から契約日までの間に、本市の指名停止措置を受けていない者\n・舗装工事業に係る特定建設業又は一般建設業の許可を有していること\n・令和8年度建設工事入札参加資格格付決定通知書の舗装工事の格付等級がAランクであること\n・本市域内に建設業法第3条第1項の本店又は支店等を有していること\n・建設業法の定めるところにより、主任技術者又は監理技術者をこの工事現場に配置できること\n・監理技術者は、監理技術者資格者証及び監理技術者講習修了証を取得している者\n・入札日において、他の工事に監理技術者、主任技術者、現場代理人等として専任で配置されていないこと","【案件概要】\n対馬市が市道西津屋線道路改良工事について制限付き一般競争入札を実施する。工事場所は対馬市上県町西津屋地内であり、工期は117日間。予定価格および予定価格の詳細は設計図及び仕様書で規定される。本入札は最低制限価格を設定し、議会の議決は不要である。\n\n【業務内容】\n- 道路改良工事（延長219.0m、幅5.5～7.0m）\n- 防護柵工（延長174m","）\n- 土工（体積40㎥）\n- 舗装工（面積767㎡）\n\n【応募要件】\n- 地方自治法施行令第167条の4に該当しない者\n- 令和8年度対馬市競争入札参加資格者名簿に登載されている者\n- 会社更生法又は民事再生法に基づく手続開始の申し立てがされていない者\n- 不渡手形等により銀行当座取引停止を受けていない者\n- 公告日から契約日までの間に対馬市の指名停止措置を受けていない者\n- 舗装工事業に係る特定建設業又は一般建設業の許可を有している者\n- 令和8年度建設工事入札参加資格格付決定通知書の舗装工事の格付等級がAランクである者\n- 本市域内に建設業法第3条第1項の本店又は支店等を有している者\n- 建設業法に定める主任技術者又は監理技術者を配置できる者\n- 監理技術者は監理技術者資格者証及び監理技術者講習修了証を取得している者\n\n【工期・期間】\n工期は117日間。入札参加資格確認申請書提出期限は令和8年7月17日（金）。入札日は令和8年8月18日（火）午前10時50分。",true,"(redacted)",[28],{"url":26,"name":26},false,[],[],{"id":6,"name":11,"categoryId":33,"parentId":15,"parentName":15,"bidInfoUrl":15},52,[35],{"year":36,"count":37},2026,17,{"sameOrganization":39,"samePrefecture":60,"similar":81},[40,46,49,52,56],{"id":41,"title":42,"organizationName":11,"prefectureName":12,"publishedDate":43,"deadlineDate":44,"budget":15,"status":45},1770864,"伊奈住民センター改修工事","2026-06-24T15:00:00.000Z","2026-07-02T15:00:00.000Z","closed",{"id":47,"title":48,"organizationName":11,"prefectureName":12,"publishedDate":43,"deadlineDate":44,"budget":15,"status":45},1770863,"中西部地区簡易水道基幹改良工事(4工区)(7繰)",{"id":50,"title":51,"organizationName":11,"prefectureName":12,"publishedDate":43,"deadlineDate":44,"budget":15,"status":45},1770862,"市道仁田志多留線道路改良工事(7繰)",{"id":53,"title":54,"organizationName":11,"prefectureName":12,"publishedDate":55,"deadlineDate":15,"budget":15,"status":16},1544703,"厳原総合公園テニスコート人工芝改修工事","2026-06-17T15:00:00.000Z",{"id":57,"title":58,"organizationName":11,"prefectureName":12,"publishedDate":55,"deadlineDate":59,"budget":15,"status":45},1544702,"対馬地区魚礁整備工事(小綱3工区)(7繰)※類似※3は、ローマ数字に置き換える。","2026-06-25T15:00:00.000Z",[61,67,70,74,78],{"id":62,"title":63,"organizationName":64,"prefectureName":12,"publishedDate":65,"deadlineDate":66,"budget":15,"status":16},2299544,"林業専用道本川内線開設工事(その3)","長崎県雲仙市","2026-07-09T15:00:00.000Z","2026-07-21T15:00:00.000Z",{"id":68,"title":69,"organizationName":64,"prefectureName":12,"publishedDate":65,"deadlineDate":14,"budget":15,"status":16},2299543,"国道交差点取付市道改良工事",{"id":71,"title":72,"organizationName":12,"prefectureName":12,"publishedDate":65,"deadlineDate":73,"budget":15,"status":16},2297956,"波長分散型蛍光X線分析装置","2026-07-29T15:00:00.000Z",{"id":75,"title":76,"organizationName":12,"prefectureName":12,"publishedDate":65,"deadlineDate":77,"budget":15,"status":16},2297955,"3Dプリンタ","2026-08-03T15:00:00.000Z",{"id":79,"title":80,"organizationName":64,"prefectureName":12,"publishedDate":65,"deadlineDate":14,"budget":15,"status":16},2297954,"諏訪ため池土砂吐ゲート更新工事",[],[83,89,94,100],{"title":84,"link":85,"date":86,"thumb":87,"cat":88},"入札失注対策の完全ガイド｜原因分析から次回改善まで実務で使える手順","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Flost-bid-measures\u002F","2026-07-08T13:00:17","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_lost-bid-measures-300x167.webp","実務ノウハウ",{"title":90,"link":91,"date":92,"thumb":93,"cat":88},"入札 内訳書の書き方｜2025年改正対応・記載項目・注意点を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-breakdown-statement\u002F","2026-07-08T12:54:44","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-breakdown-statement-300x167.webp",{"title":95,"link":96,"date":97,"thumb":98,"cat":99},"入札説明書とは？確認すべき主要項目と仕様書との違いを徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-instructions\u002F","2026-07-08T12:52:35","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-instructions-300x167.webp","入札の基礎",{"title":101,"link":102,"date":103,"thumb":104,"cat":88},"前払金（公共工事）とは？仕組み・割合・手続きを実務担当者向けに解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fadvance-payment\u002F","2026-07-08T12:49:53","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_advance-payment-300x167.webp"]