[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-2247116":3,"bid-history-2247116":33,"bid-related-2247116":37,"union-latest":96},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"budgetTaxIncluded":15,"documentUrls":28,"businessExperience":26,"localOffice":26,"securityRequirement":26,"qualifications":30,"certifications":31,"organization":32},2247116,"小松空港道路駐車場改良工事",1198,17,2,14,1,"国土交通省北陸地方整備局金沢港湾・空港整備事務所","石川県","2026-07-08T15:00:00.000Z","2026-07-27T15:00:00.000Z",null,"active","土木","一般競争入札","工事","石川県金沢市","12:00:00","2026-09-07T15:00:00.000Z","・予決令第70条及び第71条の規定に該当しない者であること\n・令和7・8年度の北陸地方整備局（港湾空港関係）における「空港等土木工事」に係るB等級又はC等級の一般競争参加資格を有すること\n・会社更生法又は民事再生法に基づき手続開始の申立てがなされていない者\n・平成23年4月1日から公告日までに、元請けとして「道路における土木一式工事」の完成・引渡し実績を有すること（共同企業体の場合は出資比率20％以上）\n・施工計画に対する技術的所見が適正であること\n・申請書提出期限から開札時までの期間に指名停止を受けていない者\n・令和6・7年度に北陸地方整備局が発注した空港等土木工事で完成工事がある場合、請負工事成績評定点の平均が65点以上であること\n・過去に調査基準価格を下回った価格で契約し成績評定点が60点未満となった場合、その通知日から1年以上経過していること\n・本工事の設計業務及び発注者支援業務の受注者、又はそれらと資本・人事面で関係がある者でないこと\n・入札参加者間に資本関係又は人的関係がないこと\n・暴力団排除要件を満たす者\n・石川県内に建設業法に基づく本店、支店又は営業所を有すること\n・1級又は2級土木施工管理技士又はこれと同等以上の資格を有する主任技術者又は監理技術者を配置できること\n・配置予定技術者は平成23年4月1日から公告日までに「道路における土木一式工事」の施工経験を有すること\n・監理技術者にあっては監理技術者資格者証及び監理技術者講習修了証を有すること\n・配置予定の主任技術者又は監理技術者は直接的かつ恒常的な雇用関係を有すること","【案件概要】\n国土交通省北陸地方整備局金沢港湾・空港整備事務所が小松空港道路駐車場改良工事の一般競争入札を実施する。本工事は電子入札・電子契約対象案件であり、施工体制確認型総合評価落札方式（施工能力評価型Ⅰ型チャレンジ型）を採用している。工事場所は小松空港内で、小松空港構内道路の撤去工、消融雪設備工、舗装工及び仮設工を施工する。工期は令和8年12月10日まで","の工事開始から令和9年3月19日までである。予算規模は公告に記載されていない。公告日は令和8年7月9日で、申請書提出期限は令和8年7月28日（火）、開札日は令和8年9月8日（火）である。\n\n【業務内容】\n- 小松空港構内道路の撤去工\n- 消融雪設備工\n- 舗装工\n- 仮設工\n- 情報ネットワークを活用した受発注者間の情報電子化、共有化、承諾経路の自動化と電子納品の実施\n- 分別解体等及び特定建設資材廃棄物の再資源化等の実施\n- 契約締結後の施工方法等の提案（契約後VE方式）\n\n【応募要件】\n- 予決令第70条及び第71条の規定に該当しない者であること\n- 令和7・8年度の北陸地方整備局（港湾空港関係）における「空港等土木工事」に係るB等級又はC等級の一般競争参加資格の決定を受けていること\n- 会社更生法又は民事再生法に基づき手続開始の申立てがなされていない者（申立てされている場合は再決定を受けた者に限る）\n- 平成23年4月1日から公告日までに、元請けとして「道路における土木一式工事」の完成・引渡しが完了した実績を有すること（共同企業体の場合は出資比率20％以上）\n- 施工計画に対する技術的所見が適正であること\n- 申請書及び資料の提出期限から開札時までの期間に北陸地方整備局から指名停止を受けていない者\n- 北陸地方整備局（港湾空港関係）が発注した空港等土木工事のうち、令和6年度・7年度に完成した工事がある場合、請負工事成績評定点の平均が65点以上であること\n- 過去に調査基準価格を下回った価格で契約し成績評定点が60点未満となった場合、その通知日から申請期限日まで1年以上経過していること\n- 本工事の設計業務及び発注者支援業務の受注者、又はそれらと資本・人事面で関係がある者でないこと\n- 入札参加者間に資本関係又は人的関係がないこと\n- 暴力団員が実質的に経営を支配する建設業者でないこと\n- 石川県内に建設業法に基づく本店、支店又は営業所が所在すること\n- 1級又は2級土木施工管理技士又はこれと同等以上の資格を有する主任技術者又は監理技術者を配置できること\n- 配置予定技術者が平成23年4月1日から公告日までに「道路における土木一式工事」の施工経験を有すること\n- 監理技術者にあっては監理技術者資格者証及び監理技術者講習修了証を有すること\n- 配置予定の主任技術者又は監理技術者は直接的かつ恒常的な雇用関係が必要\n\n【工期・期間】\n工事開始日は令和8年12月10日までに設定し、工事開始日から令和9年3月19日までに完成させること。契約締結日は工事開始日を届け出た日とし、落札決定日から7営業日以内の日とする。任意着手期間は落札決定日から令和8年12月10日までである。",true,"(redacted)",[29],{"url":27,"name":27},[],[8],{"id":6,"name":11,"categoryId":7,"parentId":15,"parentName":15,"bidInfoUrl":15},[34],{"year":35,"count":36},2026,5,{"sameOrganization":38,"samePrefecture":64,"similar":91},[39,44,49,54,59],{"id":40,"title":41,"organizationName":11,"prefectureName":12,"publishedDate":42,"deadlineDate":13,"budget":15,"status":43},2000599,"ソフトウェア購入","2026-07-01T15:00:00.000Z","closed",{"id":45,"title":46,"organizationName":11,"prefectureName":12,"publishedDate":47,"deadlineDate":48,"budget":15,"status":16},1809711,"七尾港(大田地区)航路(−13m)浚渫外1件工事","2026-06-25T15:00:00.000Z","2026-08-19T15:00:00.000Z",{"id":50,"title":51,"organizationName":11,"prefectureName":12,"publishedDate":52,"deadlineDate":53,"budget":15,"status":16},1771048,"「港湾情報処理システム」無線LANシステム構築業務","2026-06-24T15:00:00.000Z","2026-07-22T15:00:00.000Z",{"id":55,"title":56,"organizationName":11,"prefectureName":12,"publishedDate":57,"deadlineDate":58,"budget":15,"status":43},1384478,"輪島港(輪島崎地区)防波堤(第6)築造工事","2026-06-11T15:00:00.000Z","2026-07-07T15:00:00.000Z",{"id":60,"title":61,"organizationName":11,"prefectureName":12,"publishedDate":62,"deadlineDate":63,"budget":15,"status":43},878759,"総合胃腸薬外30点購入","2026-05-26T15:00:00.000Z","2026-06-03T15:00:00.000Z",[65,71,77,81,87],{"id":66,"title":67,"organizationName":68,"prefectureName":12,"publishedDate":69,"deadlineDate":70,"budget":15,"status":16},2296276,"令和8年度金沢河川国道事務所伐採木売払その3","国土交通省北陸地方整備局金沢河川国道事務所","2026-07-09T15:00:00.000Z","2026-07-23T15:00:00.000Z",{"id":72,"title":73,"organizationName":74,"prefectureName":12,"publishedDate":69,"deadlineDate":75,"budget":76,"status":16},2296275,"【一般競争入札公告】宝達中学校体育館空調設置工事","石川県宝達志水町","2026-08-03T15:00:00.000Z",304600000,{"id":78,"title":79,"organizationName":74,"prefectureName":12,"publishedDate":69,"deadlineDate":75,"budget":80,"status":16},2296274,"【一般競争入札公告】宝達志水町古墳の湯改修工事",213130000,{"id":82,"title":83,"organizationName":84,"prefectureName":12,"publishedDate":13,"deadlineDate":85,"budget":86,"status":16},2299143,"市道千代野環状線 道路改良工事(消雪配管工1工区)\u002F公共下水道管渠支障移設工事(R8湊町第1工区) (PDF 225.7KB)","石川県白山市","2026-07-21T15:00:00.000Z",47520000,{"id":88,"title":89,"organizationName":84,"prefectureName":12,"publishedDate":13,"deadlineDate":85,"budget":90,"status":16},2299142,"市道ダム1号線(白尾境隧道坑口)法面補修工事 (PDF 211.7KB)",24090000,[92],{"id":93,"title":5,"organizationName":94,"prefectureName":12,"publishedDate":13,"deadlineDate":95,"budget":15,"status":16},2215268,"国土交通省北陸地方整備局","2026-07-28T15:00:00.000Z",[97,103,108,114],{"title":98,"link":99,"date":100,"thumb":101,"cat":102},"入札失注対策の完全ガイド｜原因分析から次回改善まで実務で使える手順","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Flost-bid-measures\u002F","2026-07-08T13:00:17","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_lost-bid-measures-300x167.webp","実務ノウハウ",{"title":104,"link":105,"date":106,"thumb":107,"cat":102},"入札 内訳書の書き方｜2025年改正対応・記載項目・注意点を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-breakdown-statement\u002F","2026-07-08T12:54:44","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-breakdown-statement-300x167.webp",{"title":109,"link":110,"date":111,"thumb":112,"cat":113},"入札説明書とは？確認すべき主要項目と仕様書との違いを徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-instructions\u002F","2026-07-08T12:52:35","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-instructions-300x167.webp","入札の基礎",{"title":115,"link":116,"date":117,"thumb":118,"cat":102},"前払金（公共工事）とは？仕組み・割合・手続きを実務担当者向けに解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fadvance-payment\u002F","2026-07-08T12:49:53","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_advance-payment-300x167.webp"]