[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-2219823":3,"bid-history-2219823":47,"bid-related-2219823":51,"union-latest":97},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"budgetTaxIncluded":28,"documentUrls":29,"businessExperience":26,"localOffice":26,"securityRequirement":28,"qualifications":43,"certifications":44,"organization":45},2219823,"26平和資料館本館及び展望塔全体改修設備工事",1755,11,2,21,1,"埼玉県 都市整備部 営繕・公園事務所","埼玉県","2026-07-08T15:00:00.000Z","2026-08-02T15:00:00.000Z",null,"active","電気","一般競争入札","電気工事業(電気設備工事)","東松山市岩殿241-113","15:00:00","2026-08-03T15:00:00.000Z","・埼玉県建設工事等競争入札参加資格者名簿(令和7・8年度)に電気工事業で登載されていること\n・建設業法第3条に基づく電気工事業の許可取得者\n・資格者名簿上の本店または主たる営業所が指定管内にあること\n・A級格付を取得していること\n・令和6年度及び令和7年度に完成した埼玉県発注工事の工事成績点数が65点以上\n・建築物の総合電気設備工事または電気設備工事で1回の契約金額が3,000万円以上の工事について、平成28年4月1日以降に国又は地方公共団体との請負契約による施工実績を有すること\n・民間事業者との請負契約による同種工事の施工実績(令和3年4月1日以降)を有すること\n・埼玉県発注工事の1次下請負契約による同種工事の施工実績(令和3年4月1日以降)を有すること\n・建設業法に規定された資格を有する監理技術者等を配置すること\n・配置予定技術者は確認申請書提出期限日の3月以前から恒常的雇用関係にあること\n・施行令第167条の4に該当しない者\n・埼玉県財務規則第91条による入札参加制限対象でないこと\n・会社更生法、民事再生法手続開始申立てがなされていない者\n・開札日から1年7月前以降を審査基準日とする経営事項審査を受けていること\n・資本関係又は人的関係がないこと\n・入札参加停止措置を受けていない者\n・暴力団排除措置対象でないこと\n・健康保険、厚生年金保険、雇用保険に事業主として加入していること\n・設計業務等受託者(有限会社優設計)と関連がない者\n・電子入札システムで利用可能な電子証明書を取得し、利用者登録が完了していること","【案件概要】\n埼玉県都市整備部営繕・公園事務所が、東松山市岩殿地内の平和資料館本館及び展望塔の全体改修に伴う設備工事について一般競争入札（ダイレクト入札）を実施。対象工事は電気設備工事及び機械設備工事一式。本館はRC造地上1階地下2階建て(延べ面積2,755.13㎡)、展望塔はS造地上3階建て(延べ面積175.37㎡)。予定価格等は開札後に公表予定。\n\n【業","務内容】\n- 本館及び展望塔全体改修に伴う電気設備改修工事一式\n- 本館及び展望塔全体改修に伴う機械設備改修工事一式\n- 受変電設備、自家発電設備、電灯設備、ITV設備、噴水設備電気設備、昇降機設備等の改修\n- 建築内部改修電気・機械設備、特定天井対応設備の施工\n\n【応募要件】\n- 埼玉県建設工事等競争入札参加資格者名簿(令和7・8年度)に電気工事業で登載されていること\n- 建設業法第3条に基づく電気工事業の許可取得者\n- 資格者名簿上の本店または主たる営業所が、川越市、ふじみ野市、富士見市、熊谷県土整備事務所、東松山県土整備事務所、秩父県土整備事務所、飯能県土整備事務所、北本県土整備事務所管内にあること\n- A級格付を取得していること\n- 令和6年度及び令和7年度に完成した埼玉県発注工事(電気工事業)の工事成績点数が、いずれの年度においても65点以上\n- 建築物の総合電気設備工事または電気設備工事で、1回の契約金額が3,000万円以上の工事について、平成28年4月1日以降公告日までの間に、国又は地方公共団体との請負契約による施工実績を有すること\n- 民間事業者との請負契約による同種工事の施工実績(令和3年4月1日以降)も認める\n- 埼玉県発注工事の1次下請負契約による施工実績(同種工事、令和3年4月1日以降)も認める\n- 建設業法に規定された資格を有する監理技術者等を配置すること\n- 配置予定技術者は確認申請書提出期限日の3月以前から恒常的雇用関係にあること\n- 施行令第167条の4の規定に該当しない者\n- 埼玉県財務規則第91条により一般競争入札に参加させないこととされた者でないこと\n- 会社更生法、民事再生法に基づき手続開始申立てがなされていない者\n- 開札日から1年7月前の日以降を審査基準日とする経営事項審査を受けていること\n- 資本関係又は人的関係がないこと\n- 入札に参加停止措置を受けていない者\n- 暴力団排除措置対象でないこと\n- 健康保険、厚生年金保険、雇用保険に事業主として加入していること\n- 設計業務等受託者(有限会社優設計)と資本または人事面において関連がない者\n- 電子入札システムで利用可能な電子証明書を取得し、利用者登録が完了していること\n\n【工期・期間】\n契約確定の日から令和9年5月31日まで\n\n【スケジュール】\n- 競争参加資格確認申請書受付期間：令和8年7月10日(金)9時00分から7月23日(水)15時00分まで\n- 設計図書質問受付期間：令和8年7月10日(金)9時00分から7月29日(水)17時00分まで\n- 質問回答掲示日：令和8年7月27日(月)15時00分まで\n- 入札書提出期間：令和8年7月30日(木)9時00分から8月3日(月)15時00分まで\n- 開札日時：令和8年8月4日(火)9時40分",true,"(redacted)",false,[30,31,32,33,34,35,36,37,38,39,40,41,42],{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},[],[],{"id":6,"name":11,"categoryId":46,"parentId":15,"parentName":15,"bidInfoUrl":15},52,[48],{"year":49,"count":50},2026,13,{"sameOrganization":52,"samePrefecture":73,"similar":96},[53,57,62,67,70],{"id":54,"title":55,"organizationName":11,"prefectureName":12,"publishedDate":56,"deadlineDate":22,"budget":15,"status":16},2262784,"26熊谷スポーツ文化公園ドーム諸室照明更新ほか電気設備工事","2026-07-09T15:00:00.000Z",{"id":58,"title":59,"organizationName":11,"prefectureName":12,"publishedDate":60,"deadlineDate":61,"budget":15,"status":16},2219962,"26平和資料館本館及び展望塔全体改修工事","2026-07-07T15:00:00.000Z","2026-07-30T15:00:00.000Z",{"id":63,"title":64,"organizationName":11,"prefectureName":12,"publishedDate":65,"deadlineDate":66,"budget":15,"status":16},2160168,"26上里学園外構ほか改修工事","2026-07-06T15:00:00.000Z","2026-07-29T15:00:00.000Z",{"id":68,"title":69,"organizationName":11,"prefectureName":12,"publishedDate":65,"deadlineDate":66,"budget":15,"status":16},2160167,"26熊谷スポーツ文化公園陸上競技場ほか1所電気設備改修工事",{"id":71,"title":72,"organizationName":11,"prefectureName":12,"publishedDate":65,"deadlineDate":66,"budget":15,"status":16},2160166,"社資交(公園)工事(さきたま・体験学習広場ゾーンほか整備工その6)",[74,78,83,86,91],{"id":75,"title":76,"organizationName":77,"prefectureName":12,"publishedDate":56,"deadlineDate":15,"budget":15,"status":16},2299537,"令和8年7月10日公告(熊谷市立文化センター総合管理業務委託に係る制限付一般競争入札(事前審査型)について)","埼玉県熊谷市",{"id":79,"title":80,"organizationName":81,"prefectureName":12,"publishedDate":56,"deadlineDate":82,"budget":15,"status":16},2297584,"令和8年度富士箱根伊豆国立公園富士山麓地域インタープリテーション全体計画英語版作成業務","環境省関東地方環境事務所","2026-07-21T15:00:00.000Z",{"id":84,"title":85,"organizationName":81,"prefectureName":12,"publishedDate":56,"deadlineDate":82,"budget":15,"status":16},2297583,"令和8年度関東環境局職員等定期健康診断実施業務",{"id":87,"title":88,"organizationName":89,"prefectureName":12,"publishedDate":56,"deadlineDate":90,"budget":15,"status":16},2297582,"秩父地区砕石等単価契約","林野庁関東森林管理局埼玉森林管理事務所","2026-07-26T15:00:00.000Z",{"id":92,"title":93,"organizationName":94,"prefectureName":12,"publishedDate":56,"deadlineDate":95,"budget":15,"status":16},2297581,"高温対応 LB 膜作成装置","国立研究開発法人理化学研究所","2026-07-27T15:00:00.000Z",[],[98,104,109,115],{"title":99,"link":100,"date":101,"thumb":102,"cat":103},"入札失注対策の完全ガイド｜原因分析から次回改善まで実務で使える手順","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Flost-bid-measures\u002F","2026-07-08T13:00:17","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_lost-bid-measures-300x167.webp","実務ノウハウ",{"title":105,"link":106,"date":107,"thumb":108,"cat":103},"入札 内訳書の書き方｜2025年改正対応・記載項目・注意点を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-breakdown-statement\u002F","2026-07-08T12:54:44","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-breakdown-statement-300x167.webp",{"title":110,"link":111,"date":112,"thumb":113,"cat":114},"入札説明書とは？確認すべき主要項目と仕様書との違いを徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-instructions\u002F","2026-07-08T12:52:35","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-instructions-300x167.webp","入札の基礎",{"title":116,"link":117,"date":118,"thumb":119,"cat":103},"前払金（公共工事）とは？仕組み・割合・手続きを実務担当者向けに解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fadvance-payment\u002F","2026-07-08T12:49:53","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_advance-payment-300x167.webp"]