[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-2203783":3,"bid-history-2203783":35,"bid-related-2203783":39,"union-latest":118},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"budgetTaxIncluded":15,"documentUrls":28,"businessExperience":26,"localOffice":30,"securityRequirement":30,"qualifications":31,"certifications":32,"organization":33},2203783,"【治21】柞野新林(61)復旧治山工事(明許)",1195,37,2,14,1,"林野庁四国森林管理局香川森林管理事務所","香川県","2026-07-07T15:00:00.000Z","2026-07-30T15:00:00.000Z",null,"active","土木","一般競争入札","治山工事(山腹工)","香川県高松市","17:00:00","2026-08-17T15:00:00.000Z","・令和7・8年度の四国森林管理局における土木一式工事に係るA等級、B等級、C等級又はD(資格点数1,000点以上)等級の一般競争参加資格の認定を受けていること\n・平成23年4月1日から令和8年3月31日までの間に元請けとして完成し引き渡しを完了した同種工事(森林土木工事、治山事業の渓間工事又は山腹工事、治山事業の地すべり防止工事、林道等の開設・改良・災害復旧工事)の施工実績を有すること\n・2級土木施工管理技士又はこれと同等以上の資格を有する主任技術者又は監理技術者を配置できること\n・配置予定技術者が同種工事の経験を有していること\n・競争参加資格確認申請書提出期限から開札時までの期間に指名停止を受けていないこと\n・森林管理局長等が発注した工事で令和5年4月1日から令和8年3月31日までの3年間に完成・引き渡された工事がある場合、工事成績評定点の平均が65点以上であること\n・配置予定技術者が現場代理人・主任技術者・監理技術者として従事した工事が令和3年4月1日から令和8年3月31日までの5年間にある場合、工事成績評定点の平均が65点以上であること\n・本工事の設計業務等の受託者又は関連がある建設業者でないこと\n・入札に参加する者の間に資本関係又は人的関係がないこと\n・建設業法に基づく本店、支店又は営業所が四国全域に所在すること\n・暴力団排除に関する誓約事項に該当しないこと\n・健康保険法、厚生年金保険法、雇用保険法による届出がなされていること","【案件概要】\n林野庁四国森林管理局香川森林管理事務所が、柞野新林(61)復旧治山工事(明許)について一般競争入札(政府調達対象外)を実施。対象地域は香川県仲多度郡まんのう町柞野の国有林。工期は契約締結日の翌日から令和9年3月16日まで。本工事は施工体制確認型総合評価落札方式(簡易型)を採用し、価格と技術提案書を総合的に評価して落札者を決定する。\n\n【業務内容","】\n- 山腹工(治山工事)1.00式\n- 建設資材の再資源化等に関する法律に基づく分別解体等の実施\n- 週休2日を促進するための工事実施\n- ICT施工技術の活用(受注者希望型)\n- 省人化建設機械(チルトローテータ)を用いた施工(受注者希望型)\n- 熱中症対策に資する現場管理費の補正\n- 賃上げを実施する企業に対する総合評価での加点\n\n【応募要件】\n・令和7・8年度の四国森林管理局における土木一式工事に係るA等級、B等級、C等級又はD(資格点数1,000点以上)等級の一般競争参加資格の認定を受けていること\n・平成23年4月1日から令和8年3月31日までの間に元請けとして、治山・林道工事等の同種工事を施工した実績を有すること\n・2級土木施工管理技士又はこれと同等以上の資格を有する主任技術者又は監理技術者を配置できること\n・森林管理局長等が発注した工事で令和5年4月1日から令和8年3月31日までの3年間に完成・引き渡された工事の実績がある場合、工事成績評定点の平均が65点以上であること\n・配置予定技術者が令和3年4月1日から令和8年3月31日までの5年間に従事した工事の工事成績評定点の平均が65点以上であること\n・建設業法に基づく本店、支店又は営業所が四国全域に所在していること\n・社会保険等への届出がなされていること\n・暴力団排除に関する誓約事項を遵守すること\n\n【工期・期間】\n契約締結日の翌日(土日祝日を除く平日)から令和9年3月16日まで",true,"(redacted)",[29],{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":34,"parentId":15,"parentName":15,"bidInfoUrl":15},140,[36],{"year":37,"count":38},2026,7,{"sameOrganization":40,"samePrefecture":64,"similar":87},[41,44,49,55,59],{"id":42,"title":43,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},2203782,"柞多尾林道改良工事(明許)",{"id":45,"title":46,"organizationName":11,"prefectureName":12,"publishedDate":47,"deadlineDate":48,"budget":15,"status":16},2044507,"物品調達森林作業道等補修用鋼材(敷鉄板)香川森林管理事務所","2026-07-02T15:00:00.000Z","2026-07-15T15:00:00.000Z",{"id":50,"title":51,"organizationName":11,"prefectureName":12,"publishedDate":52,"deadlineDate":53,"budget":15,"status":54},1306341,"【治17】川浦(42)復旧治山工事","2026-06-09T15:00:00.000Z","2026-07-01T15:00:00.000Z","closed",{"id":56,"title":57,"organizationName":11,"prefectureName":12,"publishedDate":52,"deadlineDate":58,"budget":15,"status":54},1306340,"物件番号1 柞野林道外10路線除草業務","2026-06-23T15:00:00.000Z",{"id":60,"title":61,"organizationName":11,"prefectureName":12,"publishedDate":62,"deadlineDate":63,"budget":15,"status":54},1098433,"令和8年度 収穫調査業務委託(立木販売・分収育林) 柞多尾国有林63林班い3小班 香川森林管理事務所","2026-06-02T15:00:00.000Z","2026-06-29T15:00:00.000Z",[65,71,76,81,84],{"id":66,"title":67,"organizationName":68,"prefectureName":12,"publishedDate":69,"deadlineDate":70,"budget":15,"status":16},2296502,"国立療養所大島青松園自家発電装置設置工事の入札公告について","厚生労働省国立療養所 大島青松園","2026-07-09T15:00:00.000Z","2026-07-29T15:00:00.000Z",{"id":72,"title":73,"organizationName":74,"prefectureName":12,"publishedDate":69,"deadlineDate":75,"budget":15,"status":16},2296501,"令和7年度高松刑務所丸亀拘置支所冷温水ポンプ等改修工事","法務省","2026-08-24T15:00:00.000Z",{"id":77,"title":78,"organizationName":79,"prefectureName":12,"publishedDate":69,"deadlineDate":80,"budget":15,"status":16},2296500,"排水ポンプ車状態監視装置通信機器更新外","国土交通省","2026-08-18T15:00:00.000Z",{"id":82,"title":83,"organizationName":74,"prefectureName":12,"publishedDate":69,"deadlineDate":75,"budget":15,"status":16},2296499,"令和8年度高松刑務所処遇管理棟屋上防水等改修工事",{"id":85,"title":78,"organizationName":86,"prefectureName":12,"publishedDate":69,"deadlineDate":22,"budget":15,"status":16},2296498,"国土交通省四国地方整備局",[88,94,99,106,112],{"id":89,"title":90,"organizationName":91,"prefectureName":92,"publishedDate":13,"deadlineDate":93,"budget":15,"status":16},2204520,"令和8年度矢板地区外有害鳥獣(ニホンジカ)誘引捕獲委託事業(R7明許)","林野庁関東森林管理局塩那森林管理署","栃木県","2026-08-05T15:00:00.000Z",{"id":95,"title":96,"organizationName":97,"prefectureName":98,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},2203776,"【治22】篠山(3072)復旧治山工事(翌債)","林野庁四国森林管理局愛媛森林管理署","愛媛県",{"id":100,"title":101,"organizationName":102,"prefectureName":103,"publishedDate":47,"deadlineDate":104,"budget":105,"status":16},2046702,"令和7年度(明許繰越)農業の振興(実験農場実証用ハウス整備事業)","鹿児島県和泊町","鹿児島県","2026-07-20T15:00:00.000Z",5726600,{"id":107,"title":108,"organizationName":109,"prefectureName":110,"publishedDate":47,"deadlineDate":111,"budget":15,"status":16},2044118,"中御所川下流(しらび平)復旧治山工事","林野庁","長野県","2026-08-16T15:00:00.000Z",{"id":113,"title":114,"organizationName":115,"prefectureName":116,"publishedDate":53,"deadlineDate":117,"budget":15,"status":16},2044084,"【山梨森林管理事務所】上佐野地区造林(下刈外)請負事業(R7当初明許)","農林水産省","山梨県","2026-08-04T15:00:00.000Z",[119,125,130,136],{"title":120,"link":121,"date":122,"thumb":123,"cat":124},"入札失注対策の完全ガイド｜原因分析から次回改善まで実務で使える手順","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Flost-bid-measures\u002F","2026-07-08T13:00:17","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_lost-bid-measures-300x167.webp","実務ノウハウ",{"title":126,"link":127,"date":128,"thumb":129,"cat":124},"入札 内訳書の書き方｜2025年改正対応・記載項目・注意点を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-breakdown-statement\u002F","2026-07-08T12:54:44","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-breakdown-statement-300x167.webp",{"title":131,"link":132,"date":133,"thumb":134,"cat":135},"入札説明書とは？確認すべき主要項目と仕様書との違いを徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-instructions\u002F","2026-07-08T12:52:35","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-instructions-300x167.webp","入札の基礎",{"title":137,"link":138,"date":139,"thumb":140,"cat":124},"前払金（公共工事）とは？仕組み・割合・手続きを実務担当者向けに解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fadvance-payment\u002F","2026-07-08T12:49:53","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_advance-payment-300x167.webp"]