[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-2203600":3,"bid-history-2203600":37,"bid-related-2203600":43,"union-latest":110},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":21,"deadlineTime":22,"openingDate":23,"qualificationText":24,"aiSummary":25,"aiSummaryGated":26,"aiSummaryTruncated":27,"sourceUrl":28,"budgetTaxIncluded":15,"documentUrls":29,"businessExperience":27,"localOffice":27,"securityRequirement":31,"qualifications":32,"certifications":34,"organization":35},2203600,"岡山大学(医病)総合診療棟1階無停電電源装置蓄電池更新工事",125,33,2,21,1,"国立大学法人岡山大学","岡山県","2026-07-07T15:00:00.000Z","2026-07-28T15:00:00.000Z",null,"active","国立大学法人岡山大学施設企画部施設企画課総務・契約担当","電気","一般競争入札","工事","岡山県岡山市","11:00:00","2026-07-29T15:00:00.000Z","・文部科学省における電気工事に係るA等級又はB等級の一般競争参加資格（令和７・８年度）の認定を受けていること\n・平成23年度以降に元請として完成・引渡しが完了した工事で、直流電源設備若しくは無停電電源設備（蓄電池容量100AH以上）を含む電気設備工事に係る新営又は改修工事を施工した実績を有すること\n・2級電気工事施工管理技士又はこれと同等以上の資格を有する者を専任で配置できること\n・配置予定技術者は平成23年度以降に同種工事の施工経験を有していること\n・監理技術者にあっては、監理技術者資格者証及び監理技術者講習修了証を有すること\n・令和６年度及び令和７年度に完成した工事成績の各年度平均が2年連続65点未満でないこと\n・岡山県又は広島県に建設業法に基づく許可を有する本店、支店又は営業所が所在すること\n・契約規程第6条及び第7条の規定に該当しないこと\n・会社更生法又は民事再生法の手続開始の申立てがなされていないこと\n・文部科学省から指名停止を受けていないこと\n・設計業務等の受託者と資本若しくは人事面において関連がないこと\n・入札に参加する者の間に資本関係又は人的関係がないこと\n・暴力団員が実質的に経営を支配する建設業者でないこと","【案件概要】\n国立大学法人岡山大学が岡山大学（医病）総合診療棟１階無停電電源装置蓄電池更新工事について一般競争入札を実施。工事場所は岡山県岡山市北区鹿田町二丁目５番１号（岡山大学鹿田団地構内）。対象建物は鉄筋コンクリート造地上７階地下１階建（建築面積４，５７４㎡、延べ面積２５，０７４㎡）の総合診療棟。本工事は総合評価落札方式（実績評価型）を採用し、価格と技術","資料により総合的に評価。予定価格の制限範囲内で最高の評価値をもつ者を落札者とする。\n\n【業務内容】\n- 総合診療棟1階の無停電電源装置蓄電池の更新\n- 直流電源設備又は無停電電源設備（蓄電池容量100AH以上）を含む電気設備工事\n- 新営又は改修工事に該当する施工\n\n【応募要件】\n・文部科学省における電気工事に係るA等級又はB等級の一般競争参加資格（令和７・８年度）を取得していること\n・平成23年度以降に元請として完成・引渡しが完了した工事で、直流電源設備若しくは無停電電源設備（蓄電池容量100AH以上）を含む電気設備工事に係る新営又は改修工事を施工した実績を有すること\n・2級電気工事施工管理技士又はこれと同等以上の資格を有する主任技術者又は監理技術者を専任で配置できること\n・配置予定技術者は平成23年度以降に同種工事の施工経験を有すること\n・監理技術者にあっては、監理技術者資格者証及び監理技術者講習修了証を有すること\n・令和６年度及び令和７年度に完成した工事成績の各年度平均が2年連続65点未満でないこと\n・岡山県又は広島県に建設業法に基づく許可を有する本店、支店又は営業所が所在すること\n・契約規程第6条及び第7条の規定に該当しないこと\n・会社更生法又は民事再生法の手続開始の申立てがなされていないこと\n・文部科学省から指名停止を受けていないこと\n・設計業務等の受託者と資本若しくは人事面において関連がないこと\n・暴力団員が実質的に経営を支配する建設業者でないこと\n\n【工期・期間】\n余裕期間：契約締結日の翌日から令和８年９月４日(金)まで\n本工期：令和８年９月７日(月)から令和８年１２月２５日(金)まで\n\n【総合評価の観点】\n- 企業の技術力：企業の施工能力、配置予定技術者の能力を評価\n- 企業の信頼性・社会性：法令遵守（コンプライアンス）、地域精通度、ワーク・ライフ・バランス等の推進を評価\n- 標準点100点に対して加算点は最高20点\n- 評価値＝(標準点＋加算点)／入札価格で算出",true,"(redacted)",[30],{"url":28,"name":28},false,[33],3,[],{"id":6,"name":11,"categoryId":36,"parentId":15,"parentName":15,"bidInfoUrl":15},131,[38,40],{"year":39,"count":10},2025,{"year":41,"count":42},2026,16,{"sameOrganization":44,"samePrefecture":65,"similar":85},[45,50,53,56,61],{"id":46,"title":47,"organizationName":11,"prefectureName":12,"publishedDate":48,"deadlineDate":48,"budget":15,"status":49},2213237,"岡山大学病院時間外受付業務","2026-07-08T15:00:00.000Z","closed",{"id":51,"title":52,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":13,"budget":15,"status":49},2181364,"「再発膠芽腫患者を対象としたAd-SGE-REIC-NSの腫瘍内反復投与による有効性及び安全性を確認する非盲検非対照多施設共同医師主導治験」における支援業務",{"id":54,"title":55,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":13,"budget":15,"status":49},2181363,"TSMCサイバー試作業務",{"id":57,"title":58,"organizationName":11,"prefectureName":12,"publishedDate":59,"deadlineDate":60,"budget":15,"status":16},2173494,"岡山大学(東山(一)他(附小中特))基幹・環境整備(屋根等)改修工事","2026-07-06T15:00:00.000Z","2026-08-18T15:00:00.000Z",{"id":62,"title":63,"organizationName":11,"prefectureName":12,"publishedDate":64,"deadlineDate":64,"budget":15,"status":49},1738407,"生体分子精製用クロマトグラフィーシステム 一式","2026-06-24T15:00:00.000Z",[66,72,76,79,82],{"id":67,"title":68,"organizationName":69,"prefectureName":12,"publishedDate":70,"deadlineDate":71,"budget":15,"status":16},2296088,"岡山療護センター 生化学分析装置および臨床検査部門システムの更新","独立行政法人自動車事故対策機構","2026-07-09T15:00:00.000Z","2026-07-30T15:00:00.000Z",{"id":73,"title":74,"organizationName":75,"prefectureName":12,"publishedDate":70,"deadlineDate":23,"budget":15,"status":16},2296087,"入札情報【7月30日 市道旭が丘19号線外送水管布設替(耐震化)工事】","岡山県笠岡市",{"id":77,"title":78,"organizationName":75,"prefectureName":12,"publishedDate":70,"deadlineDate":23,"budget":15,"status":16},2296086,"入札情報【7月30日 市道笠岡311号宮地南平宮地線道路改良工事】",{"id":80,"title":81,"organizationName":75,"prefectureName":12,"publishedDate":70,"deadlineDate":23,"budget":15,"status":16},2296085,"入札情報【7月30日 鴨方浄水場 No.2送水ポンプ用インバータ設置工事】",{"id":83,"title":84,"organizationName":75,"prefectureName":12,"publishedDate":70,"deadlineDate":23,"budget":15,"status":16},2296084,"入札情報【7月30日 金風呂漁港高潮対策工事】",[86,92,98,102,107],{"id":87,"title":88,"organizationName":89,"prefectureName":90,"publishedDate":13,"deadlineDate":91,"budget":15,"status":16},2204976,"入札公告 : 総合診療棟新築整備工事監理業務 (PDF 128KB)","厚生労働省国立療養所 菊池恵楓園","熊本県","2026-08-26T15:00:00.000Z",{"id":93,"title":94,"organizationName":95,"prefectureName":96,"publishedDate":97,"deadlineDate":71,"budget":15,"status":16},1935855,"国立療養所多磨全生園 総合診療棟新築工事に伴う電源切り回し工事","厚生労働省","東京都","2026-06-29T15:00:00.000Z",{"id":99,"title":100,"organizationName":101,"prefectureName":96,"publishedDate":97,"deadlineDate":71,"budget":15,"status":16},1935839,"R08.06.30 国立療養所多磨全生園 総合診療棟新築工事に伴う電源切り回し工事(PDF206KB)","厚生労働省国立療養所多摩全生園",{"id":103,"title":104,"organizationName":89,"prefectureName":90,"publishedDate":105,"deadlineDate":106,"budget":15,"status":16},1572775,"入札公告 : 総合診療棟新築整備工事(電気) (PDF 143KB)","2026-06-18T15:00:00.000Z","2026-08-23T15:00:00.000Z",{"id":108,"title":109,"organizationName":89,"prefectureName":90,"publishedDate":105,"deadlineDate":106,"budget":15,"status":16},1572774,"入札公告 : 総合診療棟新築整備工事(機械) (PDF 143KB)",[111,117,122,128],{"title":112,"link":113,"date":114,"thumb":115,"cat":116},"入札失注対策の完全ガイド｜原因分析から次回改善まで実務で使える手順","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Flost-bid-measures\u002F","2026-07-08T13:00:17","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_lost-bid-measures-300x167.webp","実務ノウハウ",{"title":118,"link":119,"date":120,"thumb":121,"cat":116},"入札 内訳書の書き方｜2025年改正対応・記載項目・注意点を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-breakdown-statement\u002F","2026-07-08T12:54:44","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-breakdown-statement-300x167.webp",{"title":123,"link":124,"date":125,"thumb":126,"cat":127},"入札説明書とは？確認すべき主要項目と仕様書との違いを徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-instructions\u002F","2026-07-08T12:52:35","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-instructions-300x167.webp","入札の基礎",{"title":129,"link":130,"date":131,"thumb":132,"cat":116},"前払金（公共工事）とは？仕組み・割合・手続きを実務担当者向けに解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fadvance-payment\u002F","2026-07-08T12:49:53","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_advance-payment-300x167.webp"]