[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-2197057":3,"bid-history-2197057":35,"bid-related-2197057":39,"union-latest":111},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"budgetTaxIncluded":15,"documentUrls":28,"businessExperience":26,"localOffice":26,"securityRequirement":30,"qualifications":31,"certifications":32,"organization":33},2197057,"国道道路改築工事(仮称下金山橋第2橋P21橋脚)",1915,12,2,16,1,"千葉県 県土整備部 北千葉道路建設事務所","千葉県","2026-05-18T15:00:00.000Z","2026-06-29T15:00:00.000Z",null,"closed","橋梁","一般競争入札","国道道路改築工事","一般国道464号 成田市下金山および成田市土屋","17:00:00","2026-07-14T15:00:00.000Z","・共同企業体は2者または3者で構成すること\n・土木一式工事の格付がA等級である者を構成員に含むこと\n・特定建設業の許可を有する者を構成員に含むこと\n・県内に土木一式工事について資格者名簿に登載された主たる営業所（本店）を有する構成員が少なくとも1者あること\n・1級土木施工管理技士または土木工事業における建設業法第15条第2号イに該当する資格を有する者を配置できること\n・代表者は最大の施工能力を有する者で、経営事項審査の総合評定値等を勘案して適当性を審査される\n・最小の出資者の出資比率は2者JVで30％以上、3者JVで20％以上とすること\n・県内に主たる営業所を有する者以外の構成員は過去15年間に鋼管矢板基礎工事を元請で施工した実績があること\n・資格者名簿登載から3年以上の営業実績があること\n・指名停止措置を受けていないこと（資格確認申請期限日から落札決定時まで）\n・手形交換所による取引停止処分を受けてから2年を経過していること、または入札日前6か月以内に不渡りがないこと\n・会社更生法の適用申請がないこと（申請した場合は裁判所から更生手続開始決定を受けていないこと）\n・民事再生法の適用申請がないこと（申請した場合は裁判所から再生手続開始決定を受けていないこと）\n・設計業務等の受託者（株式会社エイト日本技術開発）でないこと\n・当該受託者と資本若しくは人事面において関連がないこと（発行済株式総数の50％超の株式保有や役員兼務がないこと）","【案件概要】\n千葉県県土整備部北千葉道路建設事務所が、一般国道464号の下金山橋第2橋における橋脚工事の一般競争入札を実施。本案件は一抜け方式対象案件で、A工事（P21橋脚）とB工事（P19・P20橋脚）の2工事が対象。事後審査Ⅱ型による資格審査と総合評価方式（簡易型）を適用。予定価格は落札決定後公表。工事箇所は成田市下金山および土屋地区、一般国道464号線","上。\n\n【業務内容】\n- A工事：仮称下金山橋第2橋P21橋脚の施工（1基）\n  躯体コンクリート1,786m³、鉄筋W=374t、鋼管矢板（φ1000・L=28.5m）44本\n- B工事：仮称下金山橋第2橋P19橋脚およびP20橋脚の施工（各1基）\n  躯体コンクリート2,131m³、鉄筋W=318t、鋼管矢板（φ1000・L=29.5m）46本\n- 工事種類：土木一式工事\n\n【応募要件】\n・共同企業体（2者または3者）による施工\n・土木一式工事の格付がA等級の者が構成員に必須\n・特定建設業の許可を有する者\n・県内に主たる営業所（本店）を有する構成員が少なくとも1者必須\n・1級土木施工管理技士または建設業法第15条第2号イに該当する資格を有する者の配置\n・県内以外の営業所のみの構成員は過去15年間に鋼管矢板基礎工事を元請で施工した実績が必須\n・資格者名簿登載から3年以上の営業実績\n・指名停止措置を受けていないこと\n・設計受託者（株式会社エイト日本技術開発）およびその関連企業でないこと\n・手形交換所の取引停止処分または不渡りがないこと（過去2年以内）\n・会社更生法・民事再生法の適用申請なし\n\n【工期・期間】\nA工事：令和12年2月28日限り（工事着手期限日：令和8年12月7日）\nB工事：令和11年9月11日限り（工事着手期限日：令和8年12月7日）\n\n【スケジュール】\n- 入札公告期間：令和8年5月19日（火）～6月8日（月）\n- 設計図書縦覧期間：令和8年5月19日（火）～6月12日（金）\n- 質問受付期間：令和8年5月20日（水）～6月1日（月）\n- 質問回答日：令和8年6月5日（金）17:00まで\n- 共同企業体資格審査申請：令和8年6月4日（木）～6月8日（月）\n- 資格確認申請受付：令和8年6月9日（火）～6月11日（木）\n- 入札書受付：令和8年6月15日（月）～6月16日（火）\n- 開札日：令和8年7月8日（水）14:10（A工事）・14:20（B工事）\n- 落札者決定通知予定日：令和8年7月30日（木）\n\n【その他条件】\n・建設リサイクル法対象\n・フレックス工期契約制度対象\n・ICT活用工事対象（土工、構造物工（橋脚・橋台）、基礎工、作業土工（床掘）等）\n・難工事として指定\n・低入札価格調査制度適用\n・債務負担行為活用\n・契約初年度の支払いあり",true,"(redacted)",[29],{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":34,"parentId":15,"parentName":15,"bidInfoUrl":15},50,[36],{"year":37,"count":38},2026,8,{"sameOrganization":40,"samePrefecture":57,"similar":81},[41,47,50,52,54],{"id":42,"title":43,"organizationName":11,"prefectureName":12,"publishedDate":44,"deadlineDate":45,"budget":15,"status":46},2230197,"県単道路改良委託(下金山・用地測量)","2026-07-07T15:00:00.000Z","2026-07-27T15:00:00.000Z","active",{"id":48,"title":49,"organizationName":11,"prefectureName":12,"publishedDate":44,"deadlineDate":45,"budget":15,"status":46},2230196,"県単道路改良委託(広報活動資料作成)",{"id":51,"title":43,"organizationName":11,"prefectureName":12,"publishedDate":44,"deadlineDate":45,"budget":15,"status":46},2186382,{"id":53,"title":49,"organizationName":11,"prefectureName":12,"publishedDate":44,"deadlineDate":45,"budget":15,"status":46},2170631,{"id":55,"title":56,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16},2197058,"国道道路改築工事(仮称下金山橋第2橋P19・P20橋脚)",[58,63,66,71,76],{"id":59,"title":60,"organizationName":61,"prefectureName":12,"publishedDate":62,"deadlineDate":15,"budget":15,"status":46},2299745,"一般競争入札参加資格審査申請書・誓約書(市指定用紙) (Word:27KB)","千葉県松戸市","2026-07-09T15:00:00.000Z",{"id":64,"title":65,"organizationName":61,"prefectureName":12,"publishedDate":62,"deadlineDate":15,"budget":15,"status":46},2299744,"紙入札方式参加届出書(Word:14KB)",{"id":67,"title":68,"organizationName":61,"prefectureName":12,"publishedDate":62,"deadlineDate":69,"budget":70,"status":46},2299743,"松契一般第155号 東部クリーンセンターし尿処理施設精密機能検査業務委託(PDF:230KB)","2026-08-02T15:00:00.000Z",2550000,{"id":72,"title":73,"organizationName":61,"prefectureName":12,"publishedDate":62,"deadlineDate":74,"budget":75,"status":46},2299742,"松契一般第160号 旧クリーンセンター等残置物運搬業務委託(PDF:137KB)","2026-07-15T15:00:00.000Z",7230000,{"id":77,"title":78,"organizationName":61,"prefectureName":12,"publishedDate":62,"deadlineDate":79,"budget":80,"status":46},2299741,"松契一般第158号 松戸市新庁舎整備基本計画(現地建て替え)策定業務委託(PDF:138KB)","2026-08-06T15:00:00.000Z",217500000,[82,88,94,98,106],{"id":83,"title":84,"organizationName":85,"prefectureName":86,"publishedDate":87,"deadlineDate":74,"budget":15,"status":46},2215246,"大石田大橋下部工(P2橋脚)工事","国土交通省東北地方整備局","山形県","2026-07-08T15:00:00.000Z",{"id":89,"title":90,"organizationName":91,"prefectureName":92,"publishedDate":44,"deadlineDate":93,"budget":15,"status":46},2220020,"島根橋耐震補強工事(P2橋脚補強工)","小川町 (政策推進課) 政策推進課","埼玉県","2026-07-30T15:00:00.000Z",{"id":95,"title":96,"organizationName":97,"prefectureName":12,"publishedDate":44,"deadlineDate":45,"budget":15,"status":46},2197107,"国道道路改築工事(台田IC函渠工)","千葉県 県土整備部 長生土木事務所",{"id":99,"title":100,"organizationName":101,"prefectureName":102,"publishedDate":103,"deadlineDate":104,"budget":105,"status":46},2118328,"【電子契約】【総合評価】【余裕期間】【とりおり1】08国補地道第08-03-192-0-002号 橋梁下部工事(竹合橋 P1橋脚)","茨城県 土木部 常陸太田工事事務所","茨城県","2026-07-05T15:00:00.000Z","2026-07-28T15:00:00.000Z",110847000,{"id":107,"title":108,"organizationName":109,"prefectureName":110,"publishedDate":14,"deadlineDate":93,"budget":15,"status":46},1926949,"信濃川下流小須戸橋橋脚(P5)工事","国土交通省北陸地方整備局","新潟県",[112,118,123,129],{"title":113,"link":114,"date":115,"thumb":116,"cat":117},"入札失注対策の完全ガイド｜原因分析から次回改善まで実務で使える手順","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Flost-bid-measures\u002F","2026-07-08T13:00:17","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_lost-bid-measures-300x167.webp","実務ノウハウ",{"title":119,"link":120,"date":121,"thumb":122,"cat":117},"入札 内訳書の書き方｜2025年改正対応・記載項目・注意点を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-breakdown-statement\u002F","2026-07-08T12:54:44","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-breakdown-statement-300x167.webp",{"title":124,"link":125,"date":126,"thumb":127,"cat":128},"入札説明書とは？確認すべき主要項目と仕様書との違いを徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-instructions\u002F","2026-07-08T12:52:35","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-instructions-300x167.webp","入札の基礎",{"title":130,"link":131,"date":132,"thumb":133,"cat":117},"前払金（公共工事）とは？仕組み・割合・手続きを実務担当者向けに解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fadvance-payment\u002F","2026-07-08T12:49:53","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_advance-payment-300x167.webp"]