[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-2183258":3,"bid-history-2183258":37,"bid-related-2183258":41,"union-latest":113},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"budgetTaxIncluded":26,"documentUrls":28,"businessExperience":26,"localOffice":26,"securityRequirement":31,"qualifications":32,"certifications":33,"organization":34},2183258,"【とりおり1\u002F4】07国補道修 第07-58-030-0-003号 道路舗装修繕工事(その14)",2220,8,2,15,1,"茨城県 土木部 竜ヶ崎工事事務所","茨城県","2026-07-07T15:00:00.000Z","2026-07-28T15:00:00.000Z",19514000,"active","舗装","一般競争入札","舗装工事","一般国道 408号 牛久市岡見町","17:00:00","2026-08-02T15:00:00.000Z","・令和7・8年度茨城県建設工事入札参加資格者名簿にA等級格付けで登載されていること\n・平成28年4月1日から令和8年3月31日の期間に、茨城県内において、国、地方公共団体、特殊法人等が発注した道路舗装工事（路面再生工事を含む）又は道路改良舗装工事を元請として竣工した実績があること（共同企業体の場合は出資比率20%以上に限る）\n・舗装工事について建設業法第26条に規定する主任又は監理技術者になり得る資格を有する配置予定技術者を配置すること\n・監理技術者として配置する場合は、監理技術者資格者証を有し、監理技術者講習を修了していること\n・茨城県竜ケ崎工事事務所管内に建設業法に基づく主たる営業所（本店）があること\n・舗装工事の建設業許可を受けていること\n・契約締結日において、契約締結日から1年7月以内の審査基準日の経営事項審査を受けている者であること\n・対象工事の設計業務等の受託者でなく、受託者と資本又は人事面において関連がない者であること","【案件概要】\n茨城県竜ヶ崎工事事務所が一般国道408号牛久市岡見町における道路舗装修繕工事を一般競争入札で発注。予定価格は19,514,000円（消費税・地方消費税を含む）。工期は130日間で、余裕期間制度を活用し令和8年7月31日までの範囲内で任意に工期始期を設定可能。総合評価方式（特別簡易Ⅱ型）を採用し、施工実績等に加え企業の新規雇用実績を評価対象とする","。開札は令和8年8月3日の予定。\n\n【業務内容】\n- 切削オーバーレイ工（1式）\n- 路面切削工（厚さ5cm、面積880m²）\n- 中間層工（SMAII型(5)厚さ2.5cm、面積830m²）\n- 表層工（改質III型As(20)厚さ5cm、面積830m²）\n- 区画線工（延長390m）\n\n【応募要件】\n- 令和7・8年度茨城県建設工事入札参加資格者名簿にA等級格付けで登載されていること\n- 平成28年4月1日から令和8年3月31日の期間に、茨城県内において、国、地方公共団体、特殊法人等が発注した道路舗装工事（路面再生工事を含む）又は道路改良舗装工事を元請として竣工した実績があること（共同企業体の場合は出資比率20%以上に限る）\n- 舗装工事について建設業法第26条に規定する主任又は監理技術者になり得る資格を有する配置予定技術者を配置すること\n- 監理技術者として配置する場合は、監理技術者資格者証を有し、監理技術者講習を修了していること\n- 茨城県竜ケ崎工事事務所管内に建設業法に基づく主たる営業所（本店）があること\n- 舗装工事の建設業許可を受けていること\n- 契約締結日において、契約締結日から1年7月以内の審査基準日の経営事項審査を受けている者であること\n- 対象工事の設計業務等の受託者でなく、受託者と資本又は人事面において関連がない者であること\n\n【工期・期間】\n工期は130日間。落札者は余裕期間（契約締結日の翌日から令和8年7月31日までの期間）の範囲内で工期の始期日を任意に設定可能（休日を除く）。低入札価格調査等により余裕期間内に契約締結が成立しない場合は、契約締結日の翌日を工期始期日とする。",true,"(redacted)",[29,30],{"url":27,"name":27},{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":35,"parentId":36,"parentName":36,"bidInfoUrl":36},50,null,[38],{"year":39,"count":40},2026,36,{"sameOrganization":42,"samePrefecture":65,"similar":90},[43,48,52,56,61],{"id":44,"title":45,"organizationName":11,"prefectureName":12,"publishedDate":46,"deadlineDate":36,"budget":47,"status":16},2262146,"08国補橋修 第08-58-040-0-052号 外合併 横断歩道橋定期点検業務委託(その2)","2026-07-09T15:00:00.000Z",13101000,{"id":49,"title":50,"organizationName":11,"prefectureName":12,"publishedDate":46,"deadlineDate":36,"budget":51,"status":16},2262145,"08国補橋修 第08-58-040-0-051号 外合併 横断歩道橋定期点検業務委託(その1)",12958000,{"id":53,"title":54,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":36,"budget":55,"status":16},2183261,"08県単交安 第08-58-742-0-001号 道路案内標識修繕工事",9724000,{"id":57,"title":58,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":59,"budget":60,"status":16},2183260,"【とりおり1\u002F2】【総合評価】08国補地道 第08-03-457-0-001号 外合併 交差点改良工事","2026-07-30T15:00:00.000Z",81202000,{"id":62,"title":63,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":36,"budget":64,"status":16},2183259,"【とりおり2\u002F2】【総合評価】08国補地道 第08-03-643-0-001号 地盤改良工事",66473000,[66,71,77,82,85],{"id":67,"title":68,"organizationName":69,"prefectureName":12,"publishedDate":46,"deadlineDate":70,"budget":36,"status":16},2299737,"【電子入札】【電子契約】情報交流棟北ウイング非常用発電点検整備作業","国立研究開発法人日本原子力研究開発機構本部","2026-08-19T15:00:00.000Z",{"id":72,"title":73,"organizationName":74,"prefectureName":12,"publishedDate":46,"deadlineDate":75,"budget":76,"status":16},2299566,"【入札公告】福祉第1号 文化福祉会館(1階)LED照明交換工事に係る条件付一般競争入札の実施について","茨城県大子町","2026-07-29T15:00:00.000Z",11899800,{"id":78,"title":79,"organizationName":80,"prefectureName":12,"publishedDate":46,"deadlineDate":81,"budget":36,"status":16},2299565,"間接水冷金標的 一式","大学共同利用機関法人高エネルギー加速器研究機構","2026-07-20T15:00:00.000Z",{"id":83,"title":84,"organizationName":80,"prefectureName":12,"publishedDate":46,"deadlineDate":22,"budget":36,"status":16},2299564,"PFリング横方向フィードバック用高周波アンプ 5台",{"id":86,"title":87,"organizationName":88,"prefectureName":12,"publishedDate":46,"deadlineDate":89,"budget":36,"status":16},2297553,"火山観測施設観測井掘削工事及び付帯工事(蔵王山)","独立行政法人防災科学技術研究所","2026-07-27T15:00:00.000Z",[91,95,99,103,109],{"id":92,"title":93,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":59,"budget":94,"status":16},2183257,"【とりおり2\u002F4】07国補道修 第07-58-030-0-002号 道路舗装修繕工事(その13)",19470000,{"id":96,"title":97,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":59,"budget":98,"status":16},2183256,"【とりおり3\u002F4】07国補道修 第07-58-031-0-001号 道路舗装修繕工事(その15)",19360000,{"id":100,"title":101,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":59,"budget":102,"status":16},2183255,"【とりおり4\u002F4】08国補道修 第08-58-031-0-001号 外合併 道路舗装修繕工事(その16)",15004000,{"id":104,"title":105,"organizationName":106,"prefectureName":12,"publishedDate":107,"deadlineDate":75,"budget":108,"status":16},2156308,"(とりおり2\u002F5)08国補道修 第08-59-701-0-001号・07国補道修 第07-59-904-0-001号合併 道路舗装修繕工事(その7)","茨城県 土木部 土浦土木事務所","2026-07-06T15:00:00.000Z",18920000,{"id":110,"title":111,"organizationName":106,"prefectureName":12,"publishedDate":107,"deadlineDate":75,"budget":112,"status":16},2156307,"(とりおり1\u002F5)08国補道修 第08-59-702-0-001号 道路舗装修繕工事(その8)",19800000,[114,120,125,131],{"title":115,"link":116,"date":117,"thumb":118,"cat":119},"入札失注対策の完全ガイド｜原因分析から次回改善まで実務で使える手順","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Flost-bid-measures\u002F","2026-07-08T13:00:17","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_lost-bid-measures-300x167.webp","実務ノウハウ",{"title":121,"link":122,"date":123,"thumb":124,"cat":119},"入札 内訳書の書き方｜2025年改正対応・記載項目・注意点を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-breakdown-statement\u002F","2026-07-08T12:54:44","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-breakdown-statement-300x167.webp",{"title":126,"link":127,"date":128,"thumb":129,"cat":130},"入札説明書とは？確認すべき主要項目と仕様書との違いを徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-instructions\u002F","2026-07-08T12:52:35","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-instructions-300x167.webp","入札の基礎",{"title":132,"link":133,"date":134,"thumb":135,"cat":119},"前払金（公共工事）とは？仕組み・割合・手続きを実務担当者向けに解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fadvance-payment\u002F","2026-07-08T12:49:53","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_advance-payment-300x167.webp"]