[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-2183254":3,"bid-history-2183254":37,"bid-related-2183254":41,"union-latest":113},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"budgetTaxIncluded":26,"documentUrls":28,"businessExperience":26,"localOffice":26,"securityRequirement":31,"qualifications":32,"certifications":33,"organization":34},2183254,"08県単河防 第08-58-728-0-001号 外合併 堤防嵩上工事",2220,8,2,14,1,"茨城県 土木部 竜ヶ崎工事事務所","茨城県","2026-07-07T15:00:00.000Z","2026-07-28T15:00:00.000Z",42900000,"active","土木","一般競争入札","土木一式工事","一級河川 谷田川 取手市 新川 地先 外","17:00:00","2026-08-02T15:00:00.000Z","・令和7・8年度茨城県建設工事入札参加資格者名簿に登載された格付けがS等級又はA等級であること\n・平成28年4月1日から令和8年3月31日の期間に、茨城県内において国、地方公共団体、特殊法人等が発注した河川工事を元請として竣工した実績があること（共同企業体の場合は出資比率20%以上）\n・土木一式工事について建設業法第26条に規定する主任又は監理技術者になり得る者を配置予定技術者として配置すること\n・監理技術者として配置する場合は、一級土木施工管理技士資格者証を有し、監理技術者講習を修了していること\n・茨城県竜ケ崎工事事務所管内に建設業法に基づく主たる営業所（本店）があること\n・建設業許可について許可を受けていること\n・契約締結日において、契約締結日から1年7月以内の審査基準日の経営事項審査を受けている者であること\n・対象工事の設計業務等の受託者（セントラルコンサルタント(株)）ではなく、当該受託者と資本又は人事面において関連がない者であること","【案件概要】\n茨城県竜ヶ崎工事事務所が一級河川谷田川の堤防嵩上工事を一般競争入札（総合評価方式・特別簡易Ⅱ型、事後審査方式）で実施する。工事場所は取手市新川地先外で、予定価格は42,900,000円（消費税及び地方消費税含む）。工期は210日間で、余裕期間制度（任意着手方式）を導入し、落札者は令和8年7月31日までの範囲内で工期の始期日を任意に設定できる。本","件は複数工事の一括審査試行工事である。\n\n【業務内容】\n- 河川堤防修繕工事（延長140m）\n- 盛土工（870m³）\n- 植生工（720m²）\n- アスファルト舗装工（929m²）\n- コンクリート舗装工（70m²）\n- 仮設工（1式）\n- 建設工事に係る資材の再資源化等に関する法律に基づく分別解体及び特定建設資材廃棄物の再資源化等\n\n【応募要件】\n- 令和7・8年度茨城県建設工事入札参加資格者名簿に登載された格付けがS等級又はA等級であること\n- 平成28年4月1日から令和8年3月31日の期間に、茨城県内において国、地方公共団体、特殊法人等が発注した河川工事を元請として竣工した実績があること（共同企業体の場合は出資比率20%以上）\n- 土木一式工事について建設業法第26条に規定する主任又は監理技術者になり得る者を配置予定技術者として申請すること\n- 監理技術者として配置する場合は、一級土木施工管理技士資格者証を有し、監理技術者講習を修了していること\n- 茨城県竜ケ崎工事事務所管内に建設業法に基づく主たる営業所（本店）があること\n- 建設業許可について許可を受けていること\n- 契約締結日において、契約締結日から1年7月以内の審査基準日の経営事項審査を受けている者であること\n- 対象工事の設計業務等の受託者（セントラルコンサルタント(株)）ではなく、当該受託者と資本又は人事面において関連がない者であること\n- 技術資料（施工実績、配置予定技術者、企業の新規雇用実績、若手又は女性技術者の配置、登録基幹技能者の配置、災害時の基礎的事業継続力認定、ICT施工技術の活用計画等）を提出すること\n\n【工期・期間】\n工期は210日間。余裕期間制度（任意着手方式）適用により、落札者は令和8年7月31日までの範囲内で工期の始期日を任意に設定することができる。低入札価格調査等により余裕期間内に契約締結とならなかった場合は、契約締結日の翌日を工期の始期日とする。なお、落札者は契約締結を令和9年4月1日とすることに留意すること。",true,"(redacted)",[29,30],{"url":27,"name":27},{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":35,"parentId":36,"parentName":36,"bidInfoUrl":36},50,null,[38],{"year":39,"count":40},2026,36,{"sameOrganization":42,"samePrefecture":65,"similar":90},[43,48,52,56,61],{"id":44,"title":45,"organizationName":11,"prefectureName":12,"publishedDate":46,"deadlineDate":36,"budget":47,"status":16},2262146,"08国補橋修 第08-58-040-0-052号 外合併 横断歩道橋定期点検業務委託(その2)","2026-07-09T15:00:00.000Z",13101000,{"id":49,"title":50,"organizationName":11,"prefectureName":12,"publishedDate":46,"deadlineDate":36,"budget":51,"status":16},2262145,"08国補橋修 第08-58-040-0-051号 外合併 横断歩道橋定期点検業務委託(その1)",12958000,{"id":53,"title":54,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":36,"budget":55,"status":16},2183261,"08県単交安 第08-58-742-0-001号 道路案内標識修繕工事",9724000,{"id":57,"title":58,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":59,"budget":60,"status":16},2183260,"【とりおり1\u002F2】【総合評価】08国補地道 第08-03-457-0-001号 外合併 交差点改良工事","2026-07-30T15:00:00.000Z",81202000,{"id":62,"title":63,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":36,"budget":64,"status":16},2183259,"【とりおり2\u002F2】【総合評価】08国補地道 第08-03-643-0-001号 地盤改良工事",66473000,[66,71,77,82,85],{"id":67,"title":68,"organizationName":69,"prefectureName":12,"publishedDate":46,"deadlineDate":70,"budget":36,"status":16},2299737,"【電子入札】【電子契約】情報交流棟北ウイング非常用発電点検整備作業","国立研究開発法人日本原子力研究開発機構本部","2026-08-19T15:00:00.000Z",{"id":72,"title":73,"organizationName":74,"prefectureName":12,"publishedDate":46,"deadlineDate":75,"budget":76,"status":16},2299566,"【入札公告】福祉第1号 文化福祉会館(1階)LED照明交換工事に係る条件付一般競争入札の実施について","茨城県大子町","2026-07-29T15:00:00.000Z",11899800,{"id":78,"title":79,"organizationName":80,"prefectureName":12,"publishedDate":46,"deadlineDate":81,"budget":36,"status":16},2299565,"間接水冷金標的 一式","大学共同利用機関法人高エネルギー加速器研究機構","2026-07-20T15:00:00.000Z",{"id":83,"title":84,"organizationName":80,"prefectureName":12,"publishedDate":46,"deadlineDate":22,"budget":36,"status":16},2299564,"PFリング横方向フィードバック用高周波アンプ 5台",{"id":86,"title":87,"organizationName":88,"prefectureName":12,"publishedDate":46,"deadlineDate":89,"budget":36,"status":16},2297553,"火山観測施設観測井掘削工事及び付帯工事(蔵王山)","独立行政法人防災科学技術研究所","2026-07-27T15:00:00.000Z",[91,97,101,105,109],{"id":92,"title":93,"organizationName":94,"prefectureName":12,"publishedDate":46,"deadlineDate":95,"budget":96,"status":16},2262129,"【とりおり2\u002F2】08県単河防 第08-61-214-0-003号 07国補河改 第07-05-259-A-002号 合併 河川改修工事(その2)","茨城県 土木部 常総工事事務所","2026-08-03T15:00:00.000Z",30987000,{"id":98,"title":99,"organizationName":94,"prefectureName":12,"publishedDate":46,"deadlineDate":95,"budget":100,"status":16},2262128,"【とりおり1\u002F2】08県単河防 第08-61-214-0-002号 07国補河改 第07-05-259-A-001号 合併 河川改修工事(その1)",31735000,{"id":102,"title":103,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":59,"budget":104,"status":16},2183255,"【とりおり4\u002F4】08国補道修 第08-58-031-0-001号 外合併 道路舗装修繕工事(その16)",15004000,{"id":106,"title":107,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":59,"budget":108,"status":16},2183253,"【とりおり1\u002F5】【総合評価】08県単河防 第08-58-728-0-003号 堤防嵩上工事(その2)",149325000,{"id":110,"title":111,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":59,"budget":112,"status":16},2183252,"【とりおり5\u002F5】【総合評価】08国補河改 第08-05-745-0-001号 外合併 河川付帯工事",73007000,[114,120,125,131],{"title":115,"link":116,"date":117,"thumb":118,"cat":119},"入札失注対策の完全ガイド｜原因分析から次回改善まで実務で使える手順","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Flost-bid-measures\u002F","2026-07-08T13:00:17","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_lost-bid-measures-300x167.webp","実務ノウハウ",{"title":121,"link":122,"date":123,"thumb":124,"cat":119},"入札 内訳書の書き方｜2025年改正対応・記載項目・注意点を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-breakdown-statement\u002F","2026-07-08T12:54:44","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-breakdown-statement-300x167.webp",{"title":126,"link":127,"date":128,"thumb":129,"cat":130},"入札説明書とは？確認すべき主要項目と仕様書との違いを徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-instructions\u002F","2026-07-08T12:52:35","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-instructions-300x167.webp","入札の基礎",{"title":132,"link":133,"date":134,"thumb":135,"cat":119},"前払金（公共工事）とは？仕組み・割合・手続きを実務担当者向けに解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fadvance-payment\u002F","2026-07-08T12:49:53","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_advance-payment-300x167.webp"]