[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-2160248":3,"bid-history-2160248":40,"bid-related-2160248":44,"union-latest":90},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":21,"deadlineTime":15,"openingDate":14,"qualificationText":22,"aiSummary":23,"aiSummaryGated":24,"aiSummaryTruncated":25,"sourceUrl":26,"dataSourceCode":27,"budgetTaxIncluded":15,"documentUrls":28,"businessExperience":25,"localOffice":34,"securityRequirement":34,"qualifications":35,"certifications":37,"organization":38},2160248,"熊谷市立奈良小学校体育館空調設備設置工事",1777,11,2,20,1,"熊谷市 総務部 契約課","埼玉県","2026-07-05T15:00:00.000Z","2026-07-30T15:00:00.000Z",null,"active","熊谋市 総務部 契約課","管・空調","一般競争入札","","熊谷市下奈良561番地3","・建設業許可（機械器具設置工事等）を有すること\n・全省庁統一資格の「役務の提供等」等級認定を有すること\n・建設業法及び関係法令を遵守できること\n・適正な労務費を確保し、労働関係法令を遵守できること\n・社会保険加入を徹底できること\n・下請契約の適正取引を実施できること\n・施工計画書を現場状況に合わせて作成し監督員の承諾を得られること\n・建設副産物情報交換システム（COBRIS）により再生資源利用計画書を作成・提出できること\n・工事登録証明書を提出できること\n・労務費ダンピング調査に対応できること","【案件概要】\n熊谷市総務部契約課が実施する一般競争入札（ダイレクト入札）案件。熊谷市立奈良小学校体育館に空調設備を設置する工事。工事場所は熊谷市下奈良561番地3。本工事は「公共建築工事積算基準等資料」及び「熊谷市営繕工事における『週休2日制モデル工事』試行要領」に基づき積算。設計図書に基づいた現場確認を十分に行ったうえで、各事業者が積算を実施する必要がある","。\n\n【業務内容】\n- 機械設備工事：体育館への空気調和設備、ガス設備、発生材処理\n- 電気設備工事：動力設備（空調設備用）\n- 建築工事：直接仮設、屋内屋外の撤去・新設、発生材処理\n- 空調機器：室外機（冷房56kW×3台）、室内機（冷房14kW×12台）、冷媒分流器、制御設備等\n- 電源切替盤（3台仕様）および関連附属機器の設置\n- 石綿含有建材の調査・報告、土壌環境測定分析（9項目）\n\n【応募要件】\n- 全省庁統一資格の「役務の提供等」又は建設業許可を有すること\n- 建設業法並びに関係法令を遵守できること\n- 適正な労務費を確保し、労働関係法令を遵守できること\n- 社会保険加入の徹底及び下請適正取引の実施\n- 施工計画書は現場状況及び工事内容を反映したもので監督員の承諾が必要\n- 建設副産物情報交換システム（COBRIS）で再生資源利用計画書を作成・提出\n- 工事登録証明書の提出\n- 低入札価格調査または最低制限価格制度に対応し、労務費ダンピング調査に応じること\n\n【工期・期間】\n契約締結日から令和9年3月31日まで。体育館内部の現場施工期間は原則として令和8年12月初旬から令和9年2月末までとし、学校行事に協力のうえ工程を調整する。ただし、学校運営に支障が生じないように工事を実施すること。天候等の影響により予期せぬ遅れが生じる場合は協議のうえ対応。週休2日制（完全週休2日Ⅱ型）の試行対象工事であり、交代制でなく現場閉所とする場合は着工前に協議が必要。",true,"(redacted)","koukai-saitama",[29,30,31,32,33],{"url":26,"name":26},{"url":26,"name":26},{"url":26,"name":26},{"url":26,"name":26},{"url":26,"name":26},false,[36],3,[],{"id":6,"name":11,"categoryId":39,"parentId":15,"parentName":15,"bidInfoUrl":15},15,[41],{"year":42,"count":43},2026,29,{"sameOrganization":45,"samePrefecture":67,"similar":89},[46,50,54,59,63],{"id":47,"title":48,"organizationName":11,"prefectureName":12,"publishedDate":49,"deadlineDate":15,"budget":15,"status":16},2710697,"年代八ツ口線道路改良事業測量・物件調査業務委託","2026-07-21T15:00:00.000Z",{"id":51,"title":52,"organizationName":11,"prefectureName":12,"publishedDate":49,"deadlineDate":53,"budget":15,"status":16},2708509,"旧大里さくら児童クラブ・大里文化財整理所解体等工事","2026-08-18T15:00:00.000Z",{"id":55,"title":56,"organizationName":11,"prefectureName":12,"publishedDate":57,"deadlineDate":58,"budget":15,"status":16},2687854,"新奈良川管理道舗装工事","2026-07-20T15:00:00.000Z","2026-08-05T15:00:00.000Z",{"id":60,"title":61,"organizationName":11,"prefectureName":12,"publishedDate":62,"deadlineDate":15,"budget":15,"status":16},2508201,"上石第一整地工事","2026-07-15T15:00:00.000Z",{"id":64,"title":65,"organizationName":11,"prefectureName":12,"publishedDate":62,"deadlineDate":66,"budget":15,"status":16},2502141,"市道20349号線道路整備工事","2026-08-03T15:00:00.000Z",[68,73,77,81,85],{"id":69,"title":70,"organizationName":71,"prefectureName":12,"publishedDate":49,"deadlineDate":72,"budget":15,"status":16},2714071,"汚水人孔清掃調査業務委託(R8-8)","草加市 総務部 契約課","2026-08-02T15:00:00.000Z",{"id":74,"title":75,"organizationName":76,"prefectureName":12,"publishedDate":49,"deadlineDate":15,"budget":15,"status":16},2710698,"会野谷浄水場管理棟他LED化工事","吉川市 都市建設部 水道課",{"id":78,"title":79,"organizationName":80,"prefectureName":12,"publishedDate":49,"deadlineDate":15,"budget":15,"status":16},2708510,"舗装復旧工事(R8-6工区)","ふじみ野市 総務部 契約・法務課",{"id":82,"title":83,"organizationName":84,"prefectureName":12,"publishedDate":49,"deadlineDate":15,"budget":15,"status":16},2708508,"(修繕)仲本児童センター照明器具LED化修繕","さいたま市 子ども未来局子ども育成部 (子ども未来局子ども育成部)",{"id":86,"title":87,"organizationName":88,"prefectureName":12,"publishedDate":49,"deadlineDate":15,"budget":15,"status":16},2708507,"6420橋りょう架換工事(物件積算業務委託その3)","埼玉県 県土整備部 越谷県土整備事務所",[],[91,97,103,108],{"title":92,"link":93,"date":94,"thumb":95,"cat":96},"契約保証金とは？保証率・納入方法・免除条件を実務担当者向けに解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fcontract-bond\u002F","2026-07-15T12:00:35","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_contract-bond-300x167.webp","参加の準備",{"title":98,"link":99,"date":100,"thumb":101,"cat":102},"入札保証金とは？契約保証金との違い・金額・免除条件を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-bond\u002F","2026-07-15T11:59:32","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-bond-300x167.webp","実務ノウハウ",{"title":104,"link":105,"date":106,"thumb":107,"cat":102},"入札参加表明書の書き方｜記載項目・提出手順・注意点を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-participation-form\u002F","2026-07-15T11:51:41","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-participation-form-300x167.webp",{"title":109,"link":110,"date":111,"thumb":112,"cat":96},"電子入札のICカード完全ガイド｜取得方法・費用・使い方まで解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-ic-card\u002F","2026-07-15T11:45:14","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F06\u002Fthumb_e-bidding-ic-card-300x167.webp"]