[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-2138411":3,"bid-related-2138411":34,"bid-history-2138411":106,"union-latest":110},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":11,"publishedDate":12,"deadlineDate":13,"budget":14,"status":15,"department":16,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":11,"deadlineTime":20,"openingDate":13,"qualificationText":21,"aiSummary":22,"aiSummaryGated":23,"aiSummaryTruncated":24,"sourceUrl":25,"budgetTaxIncluded":24,"documentUrls":26,"businessExperience":24,"localOffice":24,"securityRequirement":28,"qualifications":29,"certifications":30,"organization":31},2138411,"【建設工事】単建工第道改-5-4-1号 \u002F 県単 道路新設改良(一般分)(主)大和美並線(赤池)道路改良工事に関する一般競争入札公告",102,21,2,14,1,"岐阜県","2026-07-05T15:00:00.000Z","2026-07-29T15:00:00.000Z",18027900,"active","岐阜県郡上土木事務所","土木","一般競争入札","工事","16:00:00","・岐阜県建設工事入札参加資格者名簿登載「特定・一般（土木工事業）土木工事業・総合点数750点以上」\n・平成23年度以降申請期限日までに、元請けとして土木一式工事で工事費910万円以上の完成引き渡し実績\n・郡上区域内（郡上市八幡町、美並町、明宝、和良町内に限る）に本店が所在すること\n・主任技術者又は監理技術者は技術士（建設部門）、1級土木施工管理技士、2級土木施工管理技士（土木）以上の資格保有者\n・配置予定技術者は元請けとして土木一式工事で工事費550万円以上の主任技術者、監理技術者、監理技術者補佐、現場代理人としての従事実績\n・国及び岐阜県発注工事の工事成績評定点が65点未満のものは実績として認めない\n・共同企業体の場合は出資比率40％以上のものに限定","【案件概要】\n岐阜県郡上土木事務所が実施する県単道路新設改良事業。主要地方道大和美並線（赤池）区間における道路改良工事の一般競争入札。事後審査型・地域型総合評価落札方式を採用。予定価格18,027,900円（消費税及び地方消費税含む）。工期は契約日から180日間。郡上区域内に本店を有する土木工事業者が対象。電子入札システムを使用して実施。\n\n【業務内容】\n-","施工延長L=59m、幅員W=4.0～7.0m の道路改良\n- 土工：切土V=170m³、盛土V=220m³\n- 護岸工：練ブロック積L=40m、SL=3.3～4.0m、面積153m²\n- 防護柵工：ガードレール設置L=19m\n- 分別解体等及び特定建設資材廃棄物の再資源化実施\n- 完全週休2日制モデル工事（現場閉所）での施工\n- 建設現場環境改善モデル工事としての実施\n\n【応募要件】\n- 岐阜県建設工事入札参加資格者名簿登載「特定・一般（土木工事業）土木工事業・総合点数750点以上」\n- 平成23年度以降申請期限日までに、元請けとして建設業法規定の土木一式工事で完成引き渡し済みの工事費910万円以上の施工実績\n- 郡上区域内（郡上市八幡町、美並町、明宝、和良町内に限る）に岐阜県建設工事入札参加資格者名簿登載の本店を有すること\n- 主任技術者又は監理技術者は技術士（建設部門）、1級土木施工管理技士、2級土木施工管理技士（土木）以上の資格保有者\n- 配置技術者は元請けとして土木一式工事で工事費550万円以上の実績（主任技術者、監理技術者、監理技術者補佐、現場代理人として従事）\n- 工事成績評定点が65点未満のものは実績として認めない（国及び岐阜県発注工事のみ対象）\n- 共同企業体の場合は出資比率40％以上のものに限定\n\n【工期・期間】\n契約の日から180日間。現場施工着手予定日は令和8年9月5日。入札参加通知から7日以内に申請書提出。設計図書閲覧は令和8年7月21日～7月29日、質問書受付は7月21日～7月22日、回答書閲覧は7月21日～7月29日、入札書提出受付は7月29日～7月30日、開札は7月30日午前10時。",true,"(redacted)",[27],{"url":25,"name":25},false,[],[],{"id":6,"name":11,"categoryId":32,"parentId":33,"parentName":33,"bidInfoUrl":33},50,null,{"sameOrganization":35,"samePrefecture":56,"similar":77},[36,41,45,49,53],{"id":37,"title":38,"organizationName":11,"prefectureName":11,"publishedDate":39,"deadlineDate":13,"budget":40,"status":15},2296662,"【建設工事】第委維単橋全1号\u002F県単 橋梁指定修繕(MEを活用した小規模橋梁等の点検・修繕業務)に関する一般競争入札公告","2026-07-09T15:00:00.000Z",17158900,{"id":42,"title":43,"organizationName":11,"prefectureName":11,"publishedDate":39,"deadlineDate":44,"budget":33,"status":15},2296661,"岐阜県立中津高等学校で実施する建築基準法第12条定期点検等委託業務に関する一般競争入札公告","2026-08-03T15:00:00.000Z",{"id":46,"title":47,"organizationName":11,"prefectureName":11,"publishedDate":39,"deadlineDate":48,"budget":33,"status":15},2296660,"R8年度岐阜県立岐南工業高等学校で実施する建築基準法第12条定期点検等委託業務に関する一般競争入札公告","2026-07-15T15:00:00.000Z",{"id":50,"title":51,"organizationName":11,"prefectureName":11,"publishedDate":39,"deadlineDate":52,"budget":33,"status":15},2296659,"令和8年度 岐阜県立大垣商業高等学校で実施する建築基準法第12条定期点検等委託業務に関する一般競争入札公告","2026-07-16T15:00:00.000Z",{"id":54,"title":55,"organizationName":11,"prefectureName":11,"publishedDate":39,"deadlineDate":52,"budget":40,"status":15},2264407,"県単 橋梁指定修繕(MEを活用した小規模橋梁等の点検・修繕 業務)",[57,62,66,71,74],{"id":58,"title":59,"organizationName":60,"prefectureName":11,"publishedDate":39,"deadlineDate":61,"budget":33,"status":15},2296663,"汎用超音波画像診断装置 一式","国立大学法人東海国立大学機構岐阜大学","2026-08-30T15:00:00.000Z",{"id":63,"title":64,"organizationName":65,"prefectureName":11,"publishedDate":39,"deadlineDate":44,"budget":33,"status":15},2296658,"(仮称)境川橋上部工工事","岐阜県各務原市",{"id":67,"title":68,"organizationName":69,"prefectureName":11,"publishedDate":39,"deadlineDate":70,"budget":33,"status":15},2296657,"穂積中学校校舎照明LED改修工事(pdf 158KB)","岐阜県瑞穂市","2026-07-27T15:00:00.000Z",{"id":72,"title":73,"organizationName":69,"prefectureName":11,"publishedDate":39,"deadlineDate":70,"budget":33,"status":15},2296656,"穂積北中学校校舎照明LED改修工事(pdf 159KB)",{"id":75,"title":76,"organizationName":69,"prefectureName":11,"publishedDate":39,"deadlineDate":70,"budget":33,"status":15},2296655,"巣南中学校校舎照明LED改修工事(pdf 160KB)",[78,84,91,96,100],{"id":79,"title":80,"organizationName":33,"prefectureName":81,"publishedDate":82,"deadlineDate":83,"budget":33,"status":15},2313376,"(小土工307)令和8年度 河川修繕工事 県単(その30)","神奈川県","2026-07-10T15:00:00.000Z","2026-11-29T15:00:00.000Z",{"id":85,"title":86,"organizationName":87,"prefectureName":88,"publishedDate":39,"deadlineDate":89,"budget":90,"status":15},2299559,"004 第4分団詰所建設工事(建築工事) (PDFファイル\u002F215KB)","鹿児島県志布志市","鹿児島県","2026-07-28T15:00:00.000Z",72300000,{"id":92,"title":93,"organizationName":87,"prefectureName":88,"publishedDate":39,"deadlineDate":94,"budget":95,"status":15},2299554,"009 第4分団詰所建設工事(電気設備工事) (PDFファイル\u002F215KB)","2026-07-21T15:00:00.000Z",7100000,{"id":97,"title":98,"organizationName":87,"prefectureName":88,"publishedDate":39,"deadlineDate":94,"budget":99,"status":15},2299549,"014 第4分団詰所建設工事(機械設備工事) (PDFファイル\u002F216KB)",11120000,{"id":101,"title":102,"organizationName":103,"prefectureName":104,"publishedDate":39,"deadlineDate":105,"budget":33,"status":15},2276898,"県単つくばエクスプレス沿線整備委託(区8-44号線道路修正設計)","千葉県 県土整備部 柏区画整理事務所","千葉県","2026-07-23T15:00:00.000Z",[107],{"year":108,"count":109},2026,499,[111,117,122,128],{"title":112,"link":113,"date":114,"thumb":115,"cat":116},"入札失注対策の完全ガイド｜原因分析から次回改善まで実務で使える手順","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Flost-bid-measures\u002F","2026-07-08T13:00:17","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_lost-bid-measures-300x167.webp","実務ノウハウ",{"title":118,"link":119,"date":120,"thumb":121,"cat":116},"入札 内訳書の書き方｜2025年改正対応・記載項目・注意点を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-breakdown-statement\u002F","2026-07-08T12:54:44","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-breakdown-statement-300x167.webp",{"title":123,"link":124,"date":125,"thumb":126,"cat":127},"入札説明書とは？確認すべき主要項目と仕様書との違いを徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-instructions\u002F","2026-07-08T12:52:35","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-instructions-300x167.webp","入札の基礎",{"title":129,"link":130,"date":131,"thumb":132,"cat":116},"前払金（公共工事）とは？仕組み・割合・手続きを実務担当者向けに解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fadvance-payment\u002F","2026-07-08T12:49:53","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_advance-payment-300x167.webp"]