[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-2117265":3,"bid-history-2117265":35,"bid-related-2117265":39,"union-latest":95},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":21,"deadlineTime":22,"openingDate":14,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"budgetTaxIncluded":15,"documentUrls":28,"businessExperience":26,"localOffice":30,"securityRequirement":30,"qualifications":31,"certifications":32,"organization":33},2117265,"児島湾沿岸農地防災事業 締切堤防(福島工区)その7工事",11,33,2,14,1,"農林水産省中国四国農政局","岡山県","2026-07-05T15:00:00.000Z","2026-08-23T15:00:00.000Z",null,"active","岡山南土地改良建設事業所","土木","一般競争入札","土木工事（堤防耐震化対策工）","岡山県岡山市南区築港栄町地内","16:00:00","・中国四国農政局における令和7・8年度一般競争入札参加資格のうち「土木工事B等級」の認定を受けていること\n・平成23年度から令和7年度の間に元請として完成・引渡しが完了した土留め・仮締切工事の施工実績を有すること（各地方農政局発注工事の場合は工事成績評定点65点以上）\n・共同企業体の場合は出資比率20%以上のものに限定\n・一級又は二級土木施工管理技士（又は同等以上の資格）を有する監理技術者又は主任技術者を専任で配置可能であること\n・配置予定技術者は、平成23年度から令和7年度の間に元請として完成・引渡しが完了した土工事の経験を有すること\n・配置予定技術者と入札参加者は申請書提出日以前に3ヶ月以上の直接的かつ恒常的な雇用関係にあること\n・監理技術者にあっては、監理技術者資格者証及び監理技術者講習修了証を有する者であること\n・申請書及び確認資料提出期限から開札日時までの期間に中国四国農政局長から指名停止を受けていないこと\n・設計業務等の受託者又は当該受託者と資本若しくは人事面において関連がない建設業者であること\n・不誠実な行為、経営状況の悪化、安全管理の不備、労働福祉の状況が良好であること\n・同一入札に参加する複数者との間に資本関係又は人的関係がないこと\n・暴力団排除に関する要件を満たすこと\n・健康保険、厚生年金保険、雇用保険の届出を行っていること\n・会社更生法又は民事再生法に基づく手続開始申立中でないこと（再認定を受けた者を除く）\n・予決令第70条、第71条の規定に該当しないこと","【案件概要】\n農林水産省中国四国農政局岡山南土地改良建設事業所が、児島湾沿岸農地防災事業の締切堤防耐震化対策工事（福島工区その7工事）について一般競争入札（標準型）を実施する。対象地域は岡山県岡山市南区築港栄町地内。本工事は国営児島湾沿岸緊急耐震工事計画に基づく耐震化対策工事で、鋼矢板打設及び被覆コンクリートブロック工の施工を予定している。工期は令和8年9月","から令和9年3月までの180日間（余裕期間30日間を含む）。総合評価落札方式（簡易型）の施工体制確認型により落札者を決定する。\n\n【業務内容】\n- 耐震化対策工 L＝58ｍ（施工区間 No.0+48.200～No.1+6.100）の実施\n- 鋼矢板打設 L=27ｍ（湾側・湖側各27ｍ、鋼矢板Ⅲｗ型L=23.0ｍ）\n- 被覆コンクリートブロック（2ｔ型）N＝160個の施工\n- 施工パッケージ型積算基準への対応\n- 契約後の技術提案受付（契約後VE方式）\n- 建設資材の分別解体等及び特定建設資材廃棄物の再資源化\n- 週休2日制の履行及び履行実績取組証明書の発行対応\n- 熱中症対策に資する現場管理費補正への対応\n- 快適トイレの整備に関する協議・契約変更対応\n\n【応募要件】\n・中国四国農政局における令和7・8年度一般競争入札参加資格のうち「土木工事B等級」の認定を受けていること\n・平成23年度から令和7年度の間に元請として完成・引渡しが完了した土留め・仮締切工事の施工実績を有すること（各地方農政局発注工事の場合は工事成績評定点65点以上）\n・共同企業体の場合は出資比率20%以上のものに限定\n・建設業法に従い、一級又は二級土木施工管理技士（又は同等以上の資格）を有する監理技術者又は主任技術者を専任で配置可能であること\n・配置予定技術者は、平成23年度から令和7年度の間に元請として完成・引渡しが完了した土工事の経験を有すること\n・配置予定技術者と入札参加者は申請書提出日以前に3ヶ月以上の直接的かつ恒常的な雇用関係にあること\n・監理技術者にあっては、監理技術者資格者証及び監理技術者講習修了証を有する者であること\n・申請書及び確認資料提出期限から開札日時までの期間に中国四国農政局長から指名停止を受けていないこと\n・設計業務等の受託者又は当該受託者と資本若しくは人事面において関連がない建設業者であること\n・不誠実な行為、経営状況の悪化、安全管理の不備、労働福祉の状況が良好であること\n・同一入札に参加する複数者との間に資本関係又は人的関係がないこと\n・暴力団排除に関する要件を満たすこと\n・健康保険、厚生年金保険、雇用保険の届出を行っていること\n・会社更生法又は民事再生法に基づく手続開始申立中でないこと（再認定を受けた者を除く）\n・予決令第70条、第71条の規定に該当しないこと\n\n【工期・期間】\n契約締結後、令和8年9月から令和9年3月まで180日間（余裕期間30日間を含む）",true,"(redacted)",[29],{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":34,"parentId":15,"parentName":15,"bidInfoUrl":15},141,[36],{"year":37,"count":38},2026,30,{"sameOrganization":40,"samePrefecture":66,"similar":87},[41,46,52,56,61],{"id":42,"title":43,"organizationName":11,"prefectureName":12,"publishedDate":44,"deadlineDate":45,"budget":15,"status":16},2246652,"令和8年度実践技術研修(ストックマネジメントコース)業務","2026-07-08T15:00:00.000Z","2026-08-26T15:00:00.000Z",{"id":47,"title":48,"organizationName":11,"prefectureName":49,"publishedDate":50,"deadlineDate":51,"budget":15,"status":16},2149993,"道前道後用水農業水利事業 道後北部幹線用水路(その1)改修工事","愛媛県","2026-07-06T15:00:00.000Z","2026-08-25T15:00:00.000Z",{"id":53,"title":54,"organizationName":11,"prefectureName":49,"publishedDate":13,"deadlineDate":55,"budget":15,"status":16},2117266,"南予用水施設機能保全事業 南北分水工改修工事","2026-08-31T15:00:00.000Z",{"id":57,"title":58,"organizationName":11,"prefectureName":49,"publishedDate":59,"deadlineDate":60,"budget":15,"status":16},2022191,"令和 8年度 防災情報ネットワーク事業 【取止め】道前平野地区転送サーバ整備工事","2026-07-02T15:00:00.000Z","2026-07-27T15:00:00.000Z",{"id":62,"title":63,"organizationName":11,"prefectureName":12,"publishedDate":64,"deadlineDate":65,"budget":15,"status":16},1973481,"令和 8年度 吉井川農業水利事業 大用水路幸崎川サイホン整備工事","2026-07-01T15:00:00.000Z","2026-08-20T15:00:00.000Z",[67,73,78,81,84],{"id":68,"title":69,"organizationName":70,"prefectureName":12,"publishedDate":71,"deadlineDate":72,"budget":15,"status":16},2296088,"岡山療護センター 生化学分析装置および臨床検査部門システムの更新","独立行政法人自動車事故対策機構","2026-07-09T15:00:00.000Z","2026-07-30T15:00:00.000Z",{"id":74,"title":75,"organizationName":76,"prefectureName":12,"publishedDate":71,"deadlineDate":77,"budget":15,"status":16},2296087,"入札情報【7月30日 市道旭が丘19号線外送水管布設替(耐震化)工事】","岡山県笠岡市","2026-07-29T15:00:00.000Z",{"id":79,"title":80,"organizationName":76,"prefectureName":12,"publishedDate":71,"deadlineDate":77,"budget":15,"status":16},2296086,"入札情報【7月30日 市道笠岡311号宮地南平宮地線道路改良工事】",{"id":82,"title":83,"organizationName":76,"prefectureName":12,"publishedDate":71,"deadlineDate":77,"budget":15,"status":16},2296085,"入札情報【7月30日 鴨方浄水場 No.2送水ポンプ用インバータ設置工事】",{"id":85,"title":86,"organizationName":76,"prefectureName":12,"publishedDate":71,"deadlineDate":77,"budget":15,"status":16},2296084,"入札情報【7月30日 金風呂漁港高潮対策工事】",[88],{"id":89,"title":90,"organizationName":91,"prefectureName":92,"publishedDate":93,"deadlineDate":59,"budget":15,"status":94},1072858,"令和8年度高梁川・小田川締切堤防流向流速測定他","国土交通省中国地方整備局","広島県","2026-06-01T15:00:00.000Z","closed",[96,102,107,113],{"title":97,"link":98,"date":99,"thumb":100,"cat":101},"入札失注対策の完全ガイド｜原因分析から次回改善まで実務で使える手順","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Flost-bid-measures\u002F","2026-07-08T13:00:17","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_lost-bid-measures-300x167.webp","実務ノウハウ",{"title":103,"link":104,"date":105,"thumb":106,"cat":101},"入札 内訳書の書き方｜2025年改正対応・記載項目・注意点を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-breakdown-statement\u002F","2026-07-08T12:54:44","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-breakdown-statement-300x167.webp",{"title":108,"link":109,"date":110,"thumb":111,"cat":112},"入札説明書とは？確認すべき主要項目と仕様書との違いを徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-instructions\u002F","2026-07-08T12:52:35","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-instructions-300x167.webp","入札の基礎",{"title":114,"link":115,"date":116,"thumb":117,"cat":101},"前払金（公共工事）とは？仕組み・割合・手続きを実務担当者向けに解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fadvance-payment\u002F","2026-07-08T12:49:53","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_advance-payment-300x167.webp"]