[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-2018801":3,"bid-history-2018801":40,"bid-related-2018801":44,"union-latest":90},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":15,"documentUrls":29,"businessExperience":26,"localOffice":26,"securityRequirement":35,"qualifications":36,"certifications":37,"organization":38},2018801,"熊谷市立江南北小学校体育館空調設備設置工事",1777,11,2,20,1,"熊谷市 総務部 契約課","埼玉県","2026-07-02T15:00:00.000Z","2026-07-28T15:00:00.000Z",null,"active","管・空調","一般競争入札","管工事業（空調設備設置工事）","熊谷市三本359番地","16:00:00","2026-07-29T15:00:00.000Z","・令和7・8年度熊谷市建設工事請負一般競争入札参加資格者名簿に登載されていること\n・市内本店で、管工事業の認可に格付けされていること\n・建設業法第26条第1項から第4項に基づき、2級管工事施工管理技士又はこれと同等以上の資格を有する者をこの工事に配置できること\n・下請代金の総額が5,000万円以上となる場合には、1級管工事施工管理技士であること\n・請負代金額が4,500万円以上となる場合に配置する者は、専任でなければならないこと\n・指定業種に関し、建設業法に基づく建設業の許可を受けていること\n・請代金の額の総額が5,000万円以上（建築工事であっては8,000万円以上）となる場合には、特定建設業の許可を受けていること\n・開札日から1年7月前の日以後の日を審査基準日とする経営事項審査を受けていること\n・施行令第167条の4の規定に該当しないこと\n・契約規則第20条の2の規定により、熊谷市の一般競争入札に参加させないこととされていないこと\n・本件公告日から落札決定までの期間に入札参加停止措置を受けていないこと\n・会社更生法、民事再生法の申し立てを受けていないこと（手続開始決定を受けている者を除く）\n・健康保険法、厚生年金保険法、雇用保険法に基づく各保険に加入していること","【案件概要】\n熊谷市総務部契約課が実施する一般競争入札（ダイレクト入札）。熊谷市立江南北小学校体育館への空調設備設置工事を発注。工事場所は熊谷市三本359番地。契約締結日から令和9年3月31日までの工期。体育館内部の現場施工期間は令和8年11月初旬から令和9年2月末を原則とし、学校都合により行事が実施される場合は工程調整に協力する。本工事は「週休2日制モデル","工事」試行対象工事である。\n\n【業務内容】\n- 体育館への空気調和設備（冷房56kW以上のマスター・サブ屋外機、天井吊り室内機12台、冷媒分流器等）の機器設備の設置\n- 配管設備・制御設備の設置\n- ガス設備（液化石油ガス設備）の設置\n- 電灯設備・動力設備（空調関連）の電気工事\n- 建築工事（直接仮設、屋内外の撤去・新設、発生材処理）\n- 石綿含有建材の事前調査・報告\n- 土壌環境測定分析\n- 仮設計画（ガードフェンス、仮設敷き鉄板、キャスターゲート等）の実施\n\n【応募要件】\n- 一般競争入札参加者としての入札参加要件を満たすこと\n- 入札金額内訳書に労務費を明示し、労務費ダンピング調査に対応すること\n- 低入札価格調査制度及び最低制限価格制度の対象となる場合、調査・確認に対応すること\n- 施工計画書・再生資源利用計画書（COBRIS登録）・工事登録証明書の提出\n- 建設副産物情報交換システム（COBRIS）による書類作成・提出\n- 現場代理人・主任技術者の配置（市の取扱要領に基づく）\n- 学校敷地内における居ながら工事のため、安全対策・環境美化に配慮\n- 建設業退職金共済制度への対応\n\n【工期・期間】\n契約締結日から令和9年3月31日まで。体育館内部の現場施工期間は原則として令和8年11月初旬から令和9年2月末。学校の行事実施時には工程調整に協力すること。なお、天候等の影響により工程に予期しない遅れが生じる場合も想定し、適切に対応すること。特定季節に業務が集中する場合は1年単位の変形労働時間制の導入も考慮。",true,"(redacted)","koukai-saitama",[30,31,32,33,34],{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":39,"parentId":15,"parentName":15,"bidInfoUrl":15},15,[41],{"year":42,"count":43},2026,29,{"sameOrganization":45,"samePrefecture":67,"similar":89},[46,50,54,59,63],{"id":47,"title":48,"organizationName":11,"prefectureName":12,"publishedDate":49,"deadlineDate":15,"budget":15,"status":16},2710697,"年代八ツ口線道路改良事業測量・物件調査業務委託","2026-07-21T15:00:00.000Z",{"id":51,"title":52,"organizationName":11,"prefectureName":12,"publishedDate":49,"deadlineDate":53,"budget":15,"status":16},2708509,"旧大里さくら児童クラブ・大里文化財整理所解体等工事","2026-08-18T15:00:00.000Z",{"id":55,"title":56,"organizationName":11,"prefectureName":12,"publishedDate":57,"deadlineDate":58,"budget":15,"status":16},2687854,"新奈良川管理道舗装工事","2026-07-20T15:00:00.000Z","2026-08-05T15:00:00.000Z",{"id":60,"title":61,"organizationName":11,"prefectureName":12,"publishedDate":62,"deadlineDate":15,"budget":15,"status":16},2508201,"上石第一整地工事","2026-07-15T15:00:00.000Z",{"id":64,"title":65,"organizationName":11,"prefectureName":12,"publishedDate":62,"deadlineDate":66,"budget":15,"status":16},2502141,"市道20349号線道路整備工事","2026-08-03T15:00:00.000Z",[68,73,77,81,85],{"id":69,"title":70,"organizationName":71,"prefectureName":12,"publishedDate":49,"deadlineDate":72,"budget":15,"status":16},2714071,"汚水人孔清掃調査業務委託(R8-8)","草加市 総務部 契約課","2026-08-02T15:00:00.000Z",{"id":74,"title":75,"organizationName":76,"prefectureName":12,"publishedDate":49,"deadlineDate":15,"budget":15,"status":16},2710698,"会野谷浄水場管理棟他LED化工事","吉川市 都市建設部 水道課",{"id":78,"title":79,"organizationName":80,"prefectureName":12,"publishedDate":49,"deadlineDate":15,"budget":15,"status":16},2708510,"舗装復旧工事(R8-6工区)","ふじみ野市 総務部 契約・法務課",{"id":82,"title":83,"organizationName":84,"prefectureName":12,"publishedDate":49,"deadlineDate":15,"budget":15,"status":16},2708508,"(修繕)仲本児童センター照明器具LED化修繕","さいたま市 子ども未来局子ども育成部 (子ども未来局子ども育成部)",{"id":86,"title":87,"organizationName":88,"prefectureName":12,"publishedDate":49,"deadlineDate":15,"budget":15,"status":16},2708507,"6420橋りょう架換工事(物件積算業務委託その3)","埼玉県 県土整備部 越谷県土整備事務所",[],[91,97,103,108],{"title":92,"link":93,"date":94,"thumb":95,"cat":96},"契約保証金とは？保証率・納入方法・免除条件を実務担当者向けに解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fcontract-bond\u002F","2026-07-15T12:00:35","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_contract-bond-300x167.webp","参加の準備",{"title":98,"link":99,"date":100,"thumb":101,"cat":102},"入札保証金とは？契約保証金との違い・金額・免除条件を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-bond\u002F","2026-07-15T11:59:32","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-bond-300x167.webp","実務ノウハウ",{"title":104,"link":105,"date":106,"thumb":107,"cat":102},"入札参加表明書の書き方｜記載項目・提出手順・注意点を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-participation-form\u002F","2026-07-15T11:51:41","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-participation-form-300x167.webp",{"title":109,"link":110,"date":111,"thumb":112,"cat":96},"電子入札のICカード完全ガイド｜取得方法・費用・使い方まで解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-ic-card\u002F","2026-07-15T11:45:14","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F06\u002Fthumb_e-bidding-ic-card-300x167.webp"]