[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-1950889":3,"bid-history-1950889":34,"bid-related-1950889":38,"union-latest":107},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":15,"documentUrls":29,"businessExperience":26,"localOffice":26,"securityRequirement":26,"qualifications":31,"certifications":32,"organization":33},1950889,"柏市立光ケ丘中学校受変電設備改修工事 ※添付有",2051,12,2,21,1,"柏市 財政部 契約課","千葉県","2026-06-30T15:00:00.000Z","2026-07-22T15:00:00.000Z",null,"active","電気","一般競争入札","受変電設備改修工事","柏市光ケ丘四丁目23番1号","15:00:00","2026-07-23T15:00:00.000Z","・電気工事について柏市競争入札参加資格者として登録されていること\n・本店が柏市内にあり、人的及び物的設備を充足していること（責任者が常勤していること）\n・建設業法第3条の特定建設業又は一般建設業の許可を受けていること（下請代金総額が5,000万円以上の場合は特定建設業の許可が必須）\n・総合評定値が電気工事について700点以上であること\n・契約締結日の前1年7か月以内の経営事項審査を受けていること\n・平成28年度以降に官公庁等が発注した1,000万円以上の電気工事について、元請として施工完了した実績があること\n・電気工事について監理技術者資格者証の交付を受けた者又は主任技術者を専任で配置すること（下請代金総額が5,000万円以上の場合は監理技術者資格者証保有者が必須）\n・配置技術者は入札書提出日において3か月以上の直接的かつ恒常的な雇用関係にあること\n・健康保険、厚生年金保険、雇用保険に加入していること\n・地方自治法施行令第167条の4に該当しないこと\n・電子交換所による取引停止処分を受けてから2年を経過していないこと、又は公告日前6か月以内に手形若しくは小切手を不渡りにしていないこと\n・会社更生法又は民事再生法の再生手続の申立てがなされていないこと\n・柏市建設工事請負業者等指名停止要領による指名停止又は暴力団対策措置要領による指名排除を受けていないこと\n・開札日の前3か月以内に通知された工事成績が60点未満でないこと、及び開札日の前2か月以内に通知された工事成績が60点以上65点未満でないこと\n・事業協同組合等の構成員でないこと","【案件概要】\n柏市が柏市立光ケ丘中学校の受変電設備改修工事について、制限付き一般競争入札（事後審査・申請型、総合評価落札方式）を実施します。工事場所は柏市光ケ丘四丁目23番1号で、中学校に係る受変電設備改修工事一式が対象です。工期は契約締結日の翌日から令和9年9月30日までの約14ヶ月間です。予定価格および低入札価格調査基準額は落札者決定後に公表される予定で","、電子入札システムを使用した総合評価方式による評価・落札者決定となります。\n\n【業務内容】\n- 中学校受変電設備の改修工事一式\n\n【応募要件】\n- 電気工事について柏市競争入札参加資格者として登録されていること\n- 本店が柏市内にあり、人的及び物的設備を充足していること\n- 電気工事について、建設業法の特定建設業又は一般建設業の許可を受けていること（下請代金5,000万円以上の場合は特定建設業の許可が必須）\n- 総合評定値が電気工事について700点以上であること\n- 契約締結日前1年7か月以内の審査基準日の経営事項審査を受けていること\n- 平成28年度以降に官公庁が発注した1,000万円以上の電気工事（成績65点未満を除く）について、元請として施工完了した実績があること\n- 電気工事について建設業法の監理技術者資格者証交付者又は主任技術者を専任で配置すること（下請代金5,000万円以上の場合は監理技術者資格者証交付者を配置）\n- 当該技術者は入札書提出時点で3か月以上の直接的かつ恒常的な雇用関係にあることが必要\n- 健康保険、厚生年金保険、雇用保険に加入していること\n- 地方自治法施行令第167条の4に該当しないこと\n- 電子交換所による取引停止処分を受けてから2年以内でないこと、手形・小切手の不渡り経験がないこと\n- 会社更生法又は民事再生法の手続申立てを受けていないこと（再度確認を受けた場合を除く）\n- 指名停止等を受けていないこと\n- 工事成績要件を満たしていること（開札前3か月以内で60点未満、開札前2か月以内で60点以上65点未満の成績がないこと）\n- 事業協同組合等の構成員でないこと\n\n【工期・期間】\n契約締結日の翌日から令和9年9月30日（木）まで\n\n【総合評価における加点要件】\n- 本案件と同業種の工事成績：工事成績平均が75点以上で2点、70点以上75点未満で1点、65点以上70点未満で0点（前年度に65点未満があれば-1点、平均が65点未満で-2点）\n- 優良建設工事表彰：当該年度の3年前から公告日前日までに受賞で2点\n- 指名停止：3か月以上で-2点、3か月未満で-1点\n- ISO9001認証：開札日前日までの認証取得で1点\n- 配置予定技術者：1級技術者配置で2点\n- 防災ネットワーク加入：協定締結で1点、災害応急復旧活動実績で1点\n- 建設業労働災害防止協会加入：1点",true,"(redacted)","ppi-core-chiba",[30],{"url":27,"name":27},[],[8],{"id":6,"name":11,"categoryId":15,"parentId":15,"parentName":15,"bidInfoUrl":15},[35],{"year":36,"count":37},2026,53,{"sameOrganization":39,"samePrefecture":58,"similar":80},[40,45,48,51,55],{"id":41,"title":42,"organizationName":11,"prefectureName":12,"publishedDate":43,"deadlineDate":44,"budget":15,"status":16},2709353,"永楽1号橋他50橋定期点検調査業務委託","2026-07-21T15:00:00.000Z","2026-08-13T15:00:00.000Z",{"id":46,"title":47,"organizationName":11,"prefectureName":12,"publishedDate":43,"deadlineDate":44,"budget":15,"status":16},2709352,"都市計画の変更(生産緑地地区)業務委託",{"id":49,"title":50,"organizationName":11,"prefectureName":12,"publishedDate":43,"deadlineDate":44,"budget":15,"status":16},2709351,"道路改良測量業務委託(その1)",{"id":52,"title":53,"organizationName":11,"prefectureName":12,"publishedDate":43,"deadlineDate":54,"budget":15,"status":16},2707276,"沼南消防署外装等改修工事","2026-08-18T15:00:00.000Z",{"id":56,"title":57,"organizationName":11,"prefectureName":12,"publishedDate":43,"deadlineDate":44,"budget":15,"status":16},2707275,"柏市立逆井中学校他2校屋内消火栓ポンプ修繕",[59,64,67,70,75],{"id":60,"title":61,"organizationName":62,"prefectureName":12,"publishedDate":43,"deadlineDate":63,"budget":15,"status":16},2712481,"南房総市外房地区自己搬入施設建設工事(機械設備工事)","南房総市 建設環境部 環境保全課","2026-08-19T15:00:00.000Z",{"id":65,"title":66,"organizationName":62,"prefectureName":12,"publishedDate":43,"deadlineDate":63,"budget":15,"status":16},2712480,"南房総市外房地区自己搬入施設建設工事(電気設備工事)",{"id":68,"title":69,"organizationName":62,"prefectureName":12,"publishedDate":43,"deadlineDate":63,"budget":15,"status":16},2712479,"南房総市外房地区自己搬入施設建設工事(外構工事)",{"id":71,"title":72,"organizationName":73,"prefectureName":12,"publishedDate":43,"deadlineDate":63,"budget":74,"status":16},2712478,"市道千倉111号線舗装修繕工事","南房総市 建設環境部 建設課",18887000,{"id":76,"title":77,"organizationName":78,"prefectureName":12,"publishedDate":43,"deadlineDate":63,"budget":79,"status":16},2712477,"旧富浦駅ふれあい公園構造物撤去工事","南房総市 商工観光部 観光プロモーション課",39589000,[81,87,93,97,102],{"id":82,"title":83,"organizationName":84,"prefectureName":12,"publishedDate":85,"deadlineDate":86,"budget":15,"status":16},1975166,"千葉県立八千代高等学校長寿命化対策管理・教室棟外改修電気設備工事(不調随契) ※添付有","千葉県 教育庁企画管理部 教育施設課","2026-07-09T15:00:00.000Z","2026-07-27T15:00:00.000Z",{"id":88,"title":89,"organizationName":90,"prefectureName":12,"publishedDate":91,"deadlineDate":92,"budget":15,"status":16},2163247,"さわやかちば県民プラザホール天井改修他工事実施設計 ※添付有","千葉県 教育庁教育振興部 さわやかちば県民プラザ","2026-07-06T15:00:00.000Z","2027-01-28T15:00:00.000Z",{"id":94,"title":95,"organizationName":96,"prefectureName":12,"publishedDate":91,"deadlineDate":22,"budget":15,"status":16},2163246,"手賀沼流域下水道管渠耐震診断業務委託(北部幹線318工区及び319工区) ※添付有","千葉県 県土整備部 手賀沼下水道事務所",{"id":98,"title":99,"organizationName":100,"prefectureName":12,"publishedDate":91,"deadlineDate":22,"budget":101,"status":16},2157294,"公共運動公園周辺地区整備工事(中地区外造成) ※添付有","千葉県 県土整備部 流山区画整理事務所",19833000,{"id":103,"title":104,"organizationName":105,"prefectureName":12,"publishedDate":91,"deadlineDate":15,"budget":106,"status":16},2157117,"都市計画基礎調査業務委託 ※添付有","四街道市 市長部局 経営企画部契約課",7139000,[108,114,120,125],{"title":109,"link":110,"date":111,"thumb":112,"cat":113},"契約保証金とは？保証率・納入方法・免除条件を実務担当者向けに解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fcontract-bond\u002F","2026-07-15T12:00:35","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_contract-bond-300x167.webp","参加の準備",{"title":115,"link":116,"date":117,"thumb":118,"cat":119},"入札保証金とは？契約保証金との違い・金額・免除条件を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-bond\u002F","2026-07-15T11:59:32","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-bond-300x167.webp","実務ノウハウ",{"title":121,"link":122,"date":123,"thumb":124,"cat":119},"入札参加表明書の書き方｜記載項目・提出手順・注意点を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-participation-form\u002F","2026-07-15T11:51:41","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-participation-form-300x167.webp",{"title":126,"link":127,"date":128,"thumb":129,"cat":113},"電子入札のICカード完全ガイド｜取得方法・費用・使い方まで解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-ic-card\u002F","2026-07-15T11:45:14","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F06\u002Fthumb_e-bidding-ic-card-300x167.webp"]