[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-1928022":3,"bid-history-1928022":37,"bid-related-1928022":41,"union-latest":112},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":11,"publishedDate":12,"deadlineDate":13,"budget":14,"status":15,"department":16,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"budgetTaxIncluded":26,"documentUrls":28,"businessExperience":26,"localOffice":26,"securityRequirement":31,"qualifications":32,"certifications":33,"organization":34},1928022,"予防治山事業・県単治山事業 西ノ会津地区・家ノ洞地区工事",102,21,2,14,1,"岐阜県","2026-06-29T15:00:00.000Z","2026-07-06T15:00:00.000Z",48374700,"closed","郡上農林事務所","土木","一般競争入札","治山工事（土木工事）","郡上市白鳥町六ノ里字西ノ会津・家ノ洞地内","16:00:00","2026-07-22T15:00:00.000Z","・岐阜県建設工事入札参加資格者名簿に登載され、土木工事業で総合点数930点以上であること\n・郡上農林事務所の所管区域内に岐阜県建設工事入札参加資格者名簿に登載されている本店が所在すること\n・1級土木施工管理技士、2級土木施工管理技士、又はそれと同等以上の資格を有する者であること\n・技術士（建設部門、農業部門「農業土木」「農業農村工学」、森林部門「森林土木」）又はそれと同等以上の資格を有する者でも可\n・平成23年度以降申請期限日までに、元請けとして土木一式工事で完成引き渡し済みの工事費2,500万円以上の施工実績を有すること（国及び岐阜県発注工事のみ対象）\n・上記実績について、国及び岐阜県発注工事の場合は工事成績評定点が65点未満のものは除く\n・共同企業体の構成員としての実績は、出資比率が40％以上のものに限る\n・平成23年度以降申請期限日までに、完成引き渡し済みの土木一式工事において、元請け人として工事費1,500万円以上の主任技術者、監理技術者、監理技術者補佐又は現場代理人として従事した実績を有すること\n・配置予定技術者は本工事の契約工期の始まり時点において配置できる者であること\n・本工事の現場施工に着手する日（令和8年8月28日）には、主任技術者及び監理技術者は専任で配置できる者であること","【案件概要】\n岐阜県郡上農林事務所が予防治山事業・県単治山事業に関する工事を一般競争入札で発注する。対象地域は郡上市白鳥町六ノ里字西ノ会津・家ノ洞地内であり、予定価格は48,374,700円（消費税及び地方消費税を含む）である。本工事は総合評価落札方式（地域型）により落札者を決定する。令和8年6月30日に公告され、令和8年7月7日16時が入札申請期限、同年7","月23日10時に開札予定。契約工期は契約の日から令和9年3月25日までである。\n\n【業務内容】\n- 西ノ会津工区：前庭保護工（1式）、流路工（L=35.5m）\n- 家ノ洞工区：柵工（鋼製、L=6.0m、H=1.5m）\n\n【応募要件】\n- 岐阜県建設工事入札参加資格者名簿に登載され、土木工事業で総合点数930点以上\n- 郡上農林事務所の所管区域内に本店が所在していること\n- 1級土木施工管理技士、2級土木施工管理技士、又はそれと同等以上の資格を有する者（技術士（建設部門、農業部門「農業土木」「農業農村工学」、森林部門「森林土木」）でも可）\n- 平成23年度以降申請期限日までに、元請けとして土木一式工事で完成引き渡し済みの工事費2,500万円以上の施工実績を有すること（国及び岐阜県発注工事のみ対象。工事成績評定点が65点未満のものを除く）\n- 平成23年度以降申請期限日までに、完成引き渡し済みの土木一式工事において、主任技術者、監理技術者、監理技術者補佐又は現場代理人として従事した実績を有すること（工事費1,500万円以上。共同企業体の場合は出資比率40％以上のものに限る）\n- 配置予定技術者は本工事の現場施工着手日（令和8年8月28日）から専任配置が必要\n\n【工期・期間】\n契約の日から令和9年3月25日まで",true,"(redacted)",[29,30],{"url":27,"name":27},{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":35,"parentId":36,"parentName":36,"bidInfoUrl":36},50,null,[38],{"year":39,"count":40},2026,499,{"sameOrganization":42,"samePrefecture":65,"similar":86},[43,50,54,58,62],{"id":44,"title":45,"organizationName":11,"prefectureName":11,"publishedDate":46,"deadlineDate":47,"budget":48,"status":49},2296662,"【建設工事】第委維単橋全1号\u002F県単 橋梁指定修繕(MEを活用した小規模橋梁等の点検・修繕業務)に関する一般競争入札公告","2026-07-09T15:00:00.000Z","2026-07-29T15:00:00.000Z",17158900,"active",{"id":51,"title":52,"organizationName":11,"prefectureName":11,"publishedDate":46,"deadlineDate":53,"budget":36,"status":49},2296661,"岐阜県立中津高等学校で実施する建築基準法第12条定期点検等委託業務に関する一般競争入札公告","2026-08-03T15:00:00.000Z",{"id":55,"title":56,"organizationName":11,"prefectureName":11,"publishedDate":46,"deadlineDate":57,"budget":36,"status":49},2296660,"R8年度岐阜県立岐南工業高等学校で実施する建築基準法第12条定期点検等委託業務に関する一般競争入札公告","2026-07-15T15:00:00.000Z",{"id":59,"title":60,"organizationName":11,"prefectureName":11,"publishedDate":46,"deadlineDate":61,"budget":36,"status":49},2296659,"令和8年度 岐阜県立大垣商業高等学校で実施する建築基準法第12条定期点検等委託業務に関する一般競争入札公告","2026-07-16T15:00:00.000Z",{"id":63,"title":64,"organizationName":11,"prefectureName":11,"publishedDate":46,"deadlineDate":61,"budget":48,"status":49},2264407,"県単 橋梁指定修繕(MEを活用した小規模橋梁等の点検・修繕 業務)",[66,71,75,80,83],{"id":67,"title":68,"organizationName":69,"prefectureName":11,"publishedDate":46,"deadlineDate":70,"budget":36,"status":49},2296663,"汎用超音波画像診断装置 一式","国立大学法人東海国立大学機構岐阜大学","2026-08-30T15:00:00.000Z",{"id":72,"title":73,"organizationName":74,"prefectureName":11,"publishedDate":46,"deadlineDate":53,"budget":36,"status":49},2296658,"(仮称)境川橋上部工工事","岐阜県各務原市",{"id":76,"title":77,"organizationName":78,"prefectureName":11,"publishedDate":46,"deadlineDate":79,"budget":36,"status":49},2296657,"穂積中学校校舎照明LED改修工事(pdf 158KB)","岐阜県瑞穂市","2026-07-27T15:00:00.000Z",{"id":81,"title":82,"organizationName":78,"prefectureName":11,"publishedDate":46,"deadlineDate":79,"budget":36,"status":49},2296656,"穂積北中学校校舎照明LED改修工事(pdf 159KB)",{"id":84,"title":85,"organizationName":78,"prefectureName":11,"publishedDate":46,"deadlineDate":79,"budget":36,"status":49},2296655,"巣南中学校校舎照明LED改修工事(pdf 160KB)",[87,93,97,104,108],{"id":88,"title":89,"organizationName":11,"prefectureName":11,"publishedDate":90,"deadlineDate":91,"budget":92,"status":49},2247528,"【下治第0805号】公共 緊急予防治山事業 万場地区工事に関する一般競争入札公告","2026-07-08T15:00:00.000Z","2026-07-30T15:00:00.000Z",32907600,{"id":94,"title":95,"organizationName":11,"prefectureName":11,"publishedDate":90,"deadlineDate":96,"budget":92,"status":49},2215283,"公共 緊急予防治山事業 万場地区工事","2026-07-13T15:00:00.000Z",{"id":98,"title":99,"organizationName":100,"prefectureName":101,"publishedDate":102,"deadlineDate":36,"budget":103,"status":49},1902092,"県単治山事業 広瀬町渓間工事","越前市 企画部 財産管理課","福井県","2026-07-07T15:00:00.000Z",2784000,{"id":105,"title":106,"organizationName":11,"prefectureName":11,"publishedDate":13,"deadlineDate":79,"budget":107,"status":49},2173337,"【建設工事】揖治第0807号 予防治山事業 上ケ瀬地区工事に関する一般競争入札公告",34975600,{"id":109,"title":110,"organizationName":11,"prefectureName":11,"publishedDate":13,"deadlineDate":47,"budget":111,"status":49},2173334,"【建設工事】可治工第0801号\u002F公共予防治山事業大谷工事に関する一般競争入札公告",66925100,[113,119,124,130],{"title":114,"link":115,"date":116,"thumb":117,"cat":118},"入札失注対策の完全ガイド｜原因分析から次回改善まで実務で使える手順","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Flost-bid-measures\u002F","2026-07-08T13:00:17","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_lost-bid-measures-300x167.webp","実務ノウハウ",{"title":120,"link":121,"date":122,"thumb":123,"cat":118},"入札 内訳書の書き方｜2025年改正対応・記載項目・注意点を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-breakdown-statement\u002F","2026-07-08T12:54:44","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-breakdown-statement-300x167.webp",{"title":125,"link":126,"date":127,"thumb":128,"cat":129},"入札説明書とは？確認すべき主要項目と仕様書との違いを徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-instructions\u002F","2026-07-08T12:52:35","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-instructions-300x167.webp","入札の基礎",{"title":131,"link":132,"date":133,"thumb":134,"cat":118},"前払金（公共工事）とは？仕組み・割合・手続きを実務担当者向けに解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fadvance-payment\u002F","2026-07-08T12:49:53","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_advance-payment-300x167.webp"]