[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-1921220":3,"bid-history-1921220":34,"bid-related-1921220":38,"union-latest":115},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":7,"organizationName":10,"prefectureName":11,"publishedDate":12,"deadlineDate":13,"budget":14,"status":15,"department":16,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":10,"deadlineTime":20,"openingDate":21,"qualificationText":22,"aiSummary":23,"aiSummaryGated":24,"aiSummaryTruncated":25,"sourceUrl":26,"budgetTaxIncluded":14,"documentUrls":27,"businessExperience":25,"localOffice":25,"securityRequirement":29,"qualifications":30,"certifications":31,"organization":32},1921220,"古川処理区(黒金町7丁目)下水道築造工事【7月14日】",781,1,2,26,"北海道釧路市","北海道","2026-06-28T15:00:00.000Z","2026-07-05T15:00:00.000Z",null,"closed","釧路市上下水道部下水道建設管理課建設係","下水道","一般競争入札","工事","17:00:00","2026-07-13T15:00:00.000Z","・2025・2026年度釧路市建設工事等競争入札参加資格者名簿に土木業者として登載され、格付等級「A」認定を受けていること（令和7年度釧路市優良施工業者表彰に伴う上位等級指名業者も含む）\n・施行令第167条の4に該当しないこと\n・公告日から入札執行日まで釧路市建設工事等指名停止取扱要綱による指名停止措置を受けていないこと\n・会社更生法又は民事再生法に基づく手続開始申立てがなされていないこと（再認定を受けた場合を除く）\n・釧路市暴力団排除条例第2条に規定する暴力団、暴力団員及び暴力団関係事業者でないこと\n・道路改良工事又は下水道築造工事について元請として施工実績があること（工事目的物の引渡しが完了したもの、共同企業体の場合は出資比率20%以上）\n・釧路市内に本店を有していること（釧路市規定の地元扱い業者を含む）\n・過去2年間において釧路市請負工事成績評定要綱による成績評定でEランク評価を2年連続して受けていないこと\n・本工事の設計業務等受託者又は資本・人的関係がある者でないこと\n・入札参加者間に資本関係・人的関係（親子会社、役員兼任等）がないこと\n・建設業法に基づき監理技術者又は主任技術者及び現場代理人を工事現場に適正に配置できること","【案件概要】\n北海道釧路市上下水道部が、古川処理区（黒金町7丁目）における下水道築造工事の事後審査型一般競争入札を実施する。工事場所は釧路市黒金町で、入札日は2026年7月14日、工期は契約締結翌日（2026年7月22日）から2026年12月11日まで。予定価格は事後公表とし、最低制限価格を設定。本工事は月単位の週休2日工事の対象で、関連経費は設計金額に含ま","れる。2025・2026年度釧路市建設工事等競争入札参加資格者名簿に土木業者として登載され、格付等級「A」認定を受けた事業者が対象。\n\n【工事内容】\n- 合流・開削 HPφ500～600mm 区間延長 L=76.73m\n- 組立2号人孔 2箇所\n- 工事番号: 2026003817\n- 週休2日工事の対象（関連経費は設計金額に含む）\n\n【応募要件】\n・2025・2026年度釧路市建設工事等競争入札参加資格者名簿に土木業者として登載され、格付等級「A」認定を受けていること（令和7年度釧路市優良施工業者表彰に伴う上位等級指名業者も含む）\n・施行令第167条の4に該当しないこと\n・公告日から入札執行日まで釧路市建設工事等指名停止取扱要綱による指名停止措置を受けていないこと\n・会社更生法又は民事再生法に基づく手続開始申立てがなされていないこと（再認定を受けた場合を除く）\n・釧路市暴力団排除条例第2条に規定する暴力団、暴力団員及び暴力団関係事業者でないこと\n・道路改良工事又は下水道築造工事について元請として施工実績があること（工事目的物の引渡しが完了したもの、共同企業体の場合は出資比率20%以上）\n・釧路市内に本店を有していること（釧路市規定の地元扱い業者を含む）\n・過去2年間において釧路市請負工事成績評定要綱による成績評定でEランク評価を2年連続して受けていないこと\n・本工事の設計業務等受託者又は資本・人的関係がある者でないこと\n・入札参加者間に資本関係・人的関係（親子会社、役員兼任等）がないこと\n・建設業法に基づき監理技術者又は主任技術者及び現場代理人を工事現場に適正に配置できること\n\n【入札手続】\n- 入札参加申請書提出期間: 2026年6月29日～7月6日（釧路市の休日を除く毎日9:00～17:00）\n- 申請書提出先: 釧路市総務部契約管理課契約係（持参のみ、郵送・FAX不可）\n- 設計図書閲覧期間: 2026年6月29日9:00～7月13日17:00（釧路市ホームページからダウンロード、パスワード照会申請書の提出が必要）\n- 質疑応答書受付期間: 申請書提出期間と同じ（釧路市上下水道部下水道建設管理課建設係へ持参又は郵送）\n- 質問回答閲覧期間: 2026年7月8日10:00～7月13日17:00\n- 入札日時: 2026年7月14日 午前10時\n- 入札場所: 釧路市防災庁舎5階会議室B\n- 入札回数: 3回まで\n- 落札決定: 事後審査型、予定価格以下の最低価格入札者を落札候補者として決定し、資格審査後に落札者決定\n- 入札参加資格確認書類提出期限: 2026年7月15日17:00まで（持参のみ）\n- 入札保証金: 免除\n- 契約保証金: 契約金額の10%以上（契約規則第30条該当時は免除）\n- 契約締結期限: 2026年7月21日\n\n【工期・期間】\n2026年7月22日から2026年12月11日まで",true,"(redacted)",[28],{"url":26,"name":26},false,[],[],{"id":6,"name":10,"categoryId":33,"parentId":14,"parentName":14,"bidInfoUrl":14},52,[35],{"year":36,"count":37},2026,76,{"sameOrganization":39,"samePrefecture":59,"similar":85},[40,46,49,52,55],{"id":41,"title":42,"organizationName":10,"prefectureName":11,"publishedDate":43,"deadlineDate":44,"budget":14,"status":45},2299573,"大楽毛津波避難タワー整備事業建築主体工事【8月4日】","2026-07-09T15:00:00.000Z","2026-07-26T15:00:00.000Z","active",{"id":47,"title":48,"organizationName":10,"prefectureName":11,"publishedDate":43,"deadlineDate":44,"budget":14,"status":45},2299572,"音別町津波避難タワー整備事業建築主体工事【8月4日】",{"id":50,"title":51,"organizationName":10,"prefectureName":11,"publishedDate":43,"deadlineDate":44,"budget":14,"status":45},2299571,"令和8年度堀川団地C棟公営住宅建築主体工事【8月4日】",{"id":53,"title":54,"organizationName":10,"prefectureName":11,"publishedDate":43,"deadlineDate":44,"budget":14,"status":45},2299570,"令和8年度堀川団地C棟公営住宅管設備工事【8月4日】",{"id":56,"title":57,"organizationName":10,"prefectureName":11,"publishedDate":13,"deadlineDate":58,"budget":14,"status":45},2139920,"令和7年度補正 新釧路川左岸通道路改築工事(交付金)その2【7月28日】","2026-07-20T15:00:00.000Z",[60,64,70,75,81],{"id":61,"title":62,"organizationName":63,"prefectureName":11,"publishedDate":43,"deadlineDate":14,"budget":14,"status":45},2299589,"マニアスプレッダーの更新","日本中央競馬会",{"id":65,"title":66,"organizationName":67,"prefectureName":11,"publishedDate":43,"deadlineDate":68,"budget":69,"status":45},2299587,"森の子児童センター排煙窓改修工事 [PDFファイル\u002F102KB]","北海道江別市","2026-07-21T15:00:00.000Z",14113000,{"id":71,"title":72,"organizationName":67,"prefectureName":11,"publishedDate":43,"deadlineDate":73,"budget":74,"status":45},2299586,"江別市公共下水道 浄化センター新設系1-1次消化槽電気設備更新工事 [PDFファイル\u002F280KB]","2026-07-27T15:00:00.000Z",51183000,{"id":76,"title":77,"organizationName":78,"prefectureName":11,"publishedDate":43,"deadlineDate":79,"budget":80,"status":45},2299585,"太子町2丁目線道路改良舗装工事(PDF:237KB)","北海道深川市","2026-07-14T15:00:00.000Z",8811000,{"id":82,"title":83,"organizationName":78,"prefectureName":11,"publishedDate":43,"deadlineDate":79,"budget":84,"status":45},2299584,"住宅解体工事(多度志1093番地)(PDF:243KB)",8118000,[86,90,95,101,108],{"id":87,"title":88,"organizationName":78,"prefectureName":11,"publishedDate":43,"deadlineDate":79,"budget":89,"status":45},2299583,"一已6丁目線外2線汚水管改修工事(PDF:241KB)",17853000,{"id":91,"title":92,"organizationName":93,"prefectureName":94,"publishedDate":43,"deadlineDate":73,"budget":14,"status":45},2296449,"緑井八丁目ほか配水管布設工事","広島県広島市","広島県",{"id":96,"title":97,"organizationName":98,"prefectureName":99,"publishedDate":43,"deadlineDate":100,"budget":14,"status":45},2296256,"【URコミュニティ東日本】R08亀戸二丁目2号棟他3棟屋根防水修繕工事 (令和8年7月10日)","独立行政法人都市再生機構東日本賃貸住宅本部","東京都","2026-09-01T15:00:00.000Z",{"id":102,"title":103,"organizationName":104,"prefectureName":105,"publishedDate":43,"deadlineDate":106,"budget":107,"status":45},2262759,"東太田四丁目地先下水道工事に伴う配水管改良工事","かずさ水道 工務課 管路工事設計班","千葉県","2026-07-28T15:00:00.000Z",10109000,{"id":109,"title":110,"organizationName":111,"prefectureName":112,"publishedDate":113,"deadlineDate":114,"budget":14,"status":45},2249688,"令和8年度水道配水管敷設工事(No.5長興寺北3丁目)","大阪府豊中市","大阪府","2026-07-08T15:00:00.000Z","2026-08-17T15:00:00.000Z",[116,122,127,133],{"title":117,"link":118,"date":119,"thumb":120,"cat":121},"入札失注対策の完全ガイド｜原因分析から次回改善まで実務で使える手順","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Flost-bid-measures\u002F","2026-07-08T13:00:17","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_lost-bid-measures-300x167.webp","実務ノウハウ",{"title":123,"link":124,"date":125,"thumb":126,"cat":121},"入札 内訳書の書き方｜2025年改正対応・記載項目・注意点を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-breakdown-statement\u002F","2026-07-08T12:54:44","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-breakdown-statement-300x167.webp",{"title":128,"link":129,"date":130,"thumb":131,"cat":132},"入札説明書とは？確認すべき主要項目と仕様書との違いを徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-instructions\u002F","2026-07-08T12:52:35","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-instructions-300x167.webp","入札の基礎",{"title":134,"link":135,"date":136,"thumb":137,"cat":121},"前払金（公共工事）とは？仕組み・割合・手続きを実務担当者向けに解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fadvance-payment\u002F","2026-07-08T12:49:53","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_advance-payment-300x167.webp"]