[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-1912414":3,"bid-history-1912414":39,"bid-related-1912414":43,"union-latest":117},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":26,"documentUrls":29,"businessExperience":26,"localOffice":26,"securityRequirement":33,"qualifications":34,"certifications":35,"organization":36},1912414,"【総合評価】07国補道災防 第07-20-205-A-001号 街路樹伐採工事",2221,8,2,17,1,"茨城県 土木部 土浦土木事務所","茨城県","2026-06-21T15:00:00.000Z","2026-07-13T15:00:00.000Z",14707000,"closed","造園","一般競争入札","造園工事","主要地方道 土浦つくば線 つくば市天久保地内","17:00:00","2026-07-14T15:00:00.000Z","・茨城県建設工事入札参加資格審査要領に基づき、一般競争参加資格の認定を単体又は経常建設共同体として受けている者\n・造園工事の建設業許可を受けていること\n・土浦土木事務所管内に建設業法に基づく主たる営業所（本店）又は営業所（支店等）があること\n・契約締結日において、契約締結日から1年7月以内の審査基準日の経営事項審査（建設業法第27条の23第1項）を受けている者\n・平成28年4月1日から令和8年3月31日までに竣工した国、地方公共団体、特殊法人等発注の同種又は類似工事について、元請として施工した実績があること（同種工事：交通規制を伴う、高木剪定を含む植栽管理工事、類似工事：植栽、剪定、伐採を含む植栽管理工事、受注金額1千万円以上）\n・1級造園施工管理技士の資格を有する等、造園工事について建設業法第26条に規定する主任技術者又は監理技術者になり得る者\n・対象工事の設計業務等の受託者でないこと\n・対象工事の設計業務等の受託者と資本又は人事面において関連がある者でないこと","【案件概要】\n茨城県土浦土木事務所が街路樹伐採工事の一般競争入札を実施する。主要地方道土浦つくば線つくば市天久保地内における造園工事で、予定価格は14,707,000円（消費税10%込み）。総合評価方式（特別簡易Ⅱ型）を適用し、施工実績及び企業の新規雇用実績を評価対象とする。令和8年6月22日公告、7月15日開札予定。\n\n【業務内容】\n- 街路樹（トウカエデ","）伐採 60本\n- 伐採木処分 180t\n- 分別解体及び特定建設資材廃棄物の再資源化\n\n【応募要件】\n- 茨城県建設工事入札参加資格審査要領に基づく一般競争参加資格の認定を受けた単体又は経常建設共同体\n- 造園工事の建設業許可を受けていること\n- 土浦土木事務所管内に建設業法に基づく主たる営業所又は営業所があること\n- 契約締結日において、契約締結日から1年7月以内の審査基準日の経営事項審査を受けていること\n- 平成28年4月1日から令和8年3月31日までに竣工した同種又は類似工事の施工実績があること（国、地方公共団体、特殊法人等発注の1千万円以上）\n- 配置予定技術者は1級造園施工管理技士の資格を有する等、造園工事について建設業法第26条に規定する主任技術者又は監理技術者になり得る者\n- 監理技術者は監理技術者講習を修了している者\n- 対象工事の設計業務等の受託者でないこと、及び受託者と資本又は人事面において関連がない者であること\n\n【工期・期間】\n120日間。契約締結日の翌日から工期開始。茨城県土木部建設工事余裕期間制度実施要領に基づき余裕期間を設定した工事（任意着手方式）であり、落札者は余裕期間の範囲内で工期の始期日を任意に設定可能。",true,"(redacted)","koukai-ibaraki",[30,31,32],{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":37,"parentId":38,"parentName":38,"bidInfoUrl":38},50,null,[40],{"year":41,"count":42},2026,44,{"sameOrganization":44,"samePrefecture":69,"similar":94},[45,52,56,61,65],{"id":46,"title":47,"organizationName":11,"prefectureName":12,"publishedDate":48,"deadlineDate":49,"budget":50,"status":51},2705584,"08県単道修 第08-59-199-0-001号 道路舗装修繕工事(その18)","2026-07-21T15:00:00.000Z","2026-08-19T15:00:00.000Z",11374000,"active",{"id":53,"title":54,"organizationName":11,"prefectureName":12,"publishedDate":48,"deadlineDate":49,"budget":55,"status":51},2705583,"08県単道改 第08-59-053-0-001号・07県単道改 第07-03-075-0-001号 合併 道路改良舗装工事",16203000,{"id":57,"title":58,"organizationName":11,"prefectureName":12,"publishedDate":59,"deadlineDate":38,"budget":60,"status":51},2681827,"(とりおり1\u002F5)08国補橋修第08-59-292-0-051号・07国補橋修第07-59-291-0-051号合併 橋梁定期点検業務委託(その2)15m未満","2026-07-20T15:00:00.000Z",19899000,{"id":62,"title":63,"organizationName":11,"prefectureName":12,"publishedDate":59,"deadlineDate":38,"budget":64,"status":51},2681826,"(とりおり2\u002F5)08国補橋修第08-59-293-0-051号・07国補橋修第07-59-292-0-051号合併 橋梁定期点検業務委託(その3)15m未満",18150000,{"id":66,"title":67,"organizationName":11,"prefectureName":12,"publishedDate":59,"deadlineDate":38,"budget":68,"status":51},2681825,"(とりおり3\u002F5)08国補橋修 第08-59-294-0-051号 橋梁定期点検業務委託(その4)15m未満",17314000,[70,75,80,85,89],{"id":71,"title":72,"organizationName":73,"prefectureName":12,"publishedDate":48,"deadlineDate":38,"budget":74,"status":51},2707385,"508-0183-0イ 県営かんがい排水事業 那珂川沿岸地区 事業計画資料作成業務委託","茨城県 農林水産部 県央農林事務所土地改良部門",7513000,{"id":76,"title":77,"organizationName":78,"prefectureName":12,"publishedDate":48,"deadlineDate":38,"budget":79,"status":51},2707384,"08国補地道 第08-03-565-0-051号 道路詳細設計業務委託","茨城県 土木部 常陸大宮土木事務所",23177000,{"id":81,"title":82,"organizationName":83,"prefectureName":12,"publishedDate":48,"deadlineDate":38,"budget":84,"status":51},2707383,"08国補地道 第08-03-631-0-052号 08国補地道 第08-03-161-0-052号 合併 交差点詳細設計業務委託","茨城県 土木部 水戸土木事務所",14960000,{"id":86,"title":87,"organizationName":83,"prefectureName":12,"publishedDate":48,"deadlineDate":38,"budget":88,"status":51},2707382,"08国補地道 第08-03-631-0-051号 08国補地道 第08-03-161-0-051号 合併 路線測量業務委託",7546000,{"id":90,"title":91,"organizationName":92,"prefectureName":12,"publishedDate":48,"deadlineDate":93,"budget":38,"status":51},2706181,"R8霞ヶ浦導水石岡トンネル覆工整備工事","国土交通省関東地方整備局","2026-08-24T15:00:00.000Z",[95,99,103,108,113],{"id":96,"title":97,"organizationName":83,"prefectureName":12,"publishedDate":48,"deadlineDate":49,"budget":98,"status":51},2705582,"08国補橋修 第08-04-429-0-001号 橋梁修繕工事(涸沼橋その1)※総合評価",147411000,{"id":100,"title":101,"organizationName":102,"prefectureName":102,"publishedDate":48,"deadlineDate":38,"budget":38,"status":51},2705349,"令和8年度(2026年度)潜在的介護職員等活用推進事業委託業務契約に係る総合評価一般競争入札の実施について","北海道",{"id":104,"title":105,"organizationName":106,"prefectureName":107,"publishedDate":59,"deadlineDate":49,"budget":38,"status":51},2697197,"令和8年度環境配慮型製品の国際展開促進に係る調査検討業務[総合評価落札方式]","環境省","東京都",{"id":109,"title":110,"organizationName":111,"prefectureName":112,"publishedDate":59,"deadlineDate":38,"budget":38,"status":51},2697061,"特別簡易型総合評価落札方式落札者決定基準(PDF:292KB)","宮城県栗原市","宮城県",{"id":114,"title":115,"organizationName":102,"prefectureName":102,"publishedDate":59,"deadlineDate":116,"budget":38,"status":51},2697020,"総合評価一般競争入札の実施(令和8年度北海道の文化・歴史振興事業(ナイトツアー)委託業務)","2026-08-04T15:00:00.000Z",[118,124,130,135],{"title":119,"link":120,"date":121,"thumb":122,"cat":123},"契約保証金とは？保証率・納入方法・免除条件を実務担当者向けに解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fcontract-bond\u002F","2026-07-15T12:00:35","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_contract-bond-300x167.webp","参加の準備",{"title":125,"link":126,"date":127,"thumb":128,"cat":129},"入札保証金とは？契約保証金との違い・金額・免除条件を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-bond\u002F","2026-07-15T11:59:32","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-bond-300x167.webp","実務ノウハウ",{"title":131,"link":132,"date":133,"thumb":134,"cat":129},"入札参加表明書の書き方｜記載項目・提出手順・注意点を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-participation-form\u002F","2026-07-15T11:51:41","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-participation-form-300x167.webp",{"title":136,"link":137,"date":138,"thumb":139,"cat":123},"電子入札のICカード完全ガイド｜取得方法・費用・使い方まで解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-ic-card\u002F","2026-07-15T11:45:14","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F06\u002Fthumb_e-bidding-ic-card-300x167.webp"]