[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-1912387":3,"bid-history-1912387":39,"bid-related-1912387":43,"union-latest":117},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":26,"documentUrls":29,"businessExperience":26,"localOffice":26,"securityRequirement":33,"qualifications":34,"certifications":35,"organization":36},1912387,"08国補橋修 第08-04-457-0-001号 08県単橋修 第08-56-853-0-001号 07国補橋修 第07-04-457-0-003号 合併 鹿行大橋塗装修繕工事",2218,8,2,18,1,"茨城県 土木部 鉾田工事事務所","茨城県","2026-06-25T15:00:00.000Z","2026-07-21T15:00:00.000Z",69234000,"active","塗装","一般競争入札","塗装工事","一般国道354号 行方市山田","17:00:00","2026-07-22T15:00:00.000Z","・令和7・8年度建設工事入札参加資格者名簿に塗装工事として登載されていること\n・平成18年4月1日から令和8年3月31日の期間に、茨城県内で竣工した国又は地方公共団体発注の道路工事を元請として施工した実績があること（JV構成員の場合は出資比率20%以上の場合に限る）\n・一級土木施工管理技士の資格を有する等、塗装工事について建設業法第26条に規定する主任又は監理技術者になり得る者を配置予定技術者とすること\n・塗装工事について特定建設業の許可を受けていること\n・契約締結日から1年7月以内の審査基準日の経営事項審査を受審していること\n・茨城県内に建設業法に基づく主たる営業所（本店）又は営業所（支店等）があること\n・対象工事の設計業務等の受託者でないこと及び当該受託者と資本又は人事面において関連がある者でないこと","【案件概要】\n茨城県土木部鉾田工事事務所が、一般国道354号行方市山田地先における鹿行大橋の塗装修繕工事を一般競争入札で実施。3つの工事番号（08国補橋修第08-04-457-0-001号、08県単橋修第08-56-853-0-001号、07国補橋修第07-04-457-0-003号）を合併した工事で、予定価格は69,234,000円（税込）。総合評価方式（","○○型）を採用し、施工実績に加え企業の新規雇用実績に関する技術資料を評価対象とする。工期は180日間で、公告日は令和8年6月26日。\n\n【業務内容】\n- 橋梁塗装修繕工事（P2-P4間、2径間）\n- 素地調整（1種ケレン）A=295m2\n- 橋梁塗装工 A=440m2\n- ひび割れ補修工 N=1式\n- 分別解体及び特定建設資材廃棄物の再資源化等の実施\n\n【応募要件】\n- 令和7・8年度建設工事入札参加資格者名簿に塗装工事として登載されていること\n- 平成18年4月1日から令和8年3月31日の期間に、茨城県内で竣工した国又は地方公共団体発注の道路工事を元請として施工した実績があること（JV構成員の場合は出資比率20%以上の場合に限る）\n- 一級土木施工管理技士の資格を有する等、塗装工事について建設業法第26条に規定する主任又は監理技術者になり得る者を配置予定技術者とすること\n- 塗装工事について特定建設業の許可を受けていること\n- 契約締結日から1年7月以内の審査基準日の経営事項審査を受審していること\n- 茨城県内に建設業法に基づく主たる営業所（本店）又は営業所（支店等）があること\n- 対象工事の設計業務等の受託者（いであ株式会社）でないこと、及び当該受託者と資本又は人事面において関連がある者でないこと\n- 最低制限価格が設定されており、調査基準価格も設定される\n\n【工期・期間】\n工期は180日間。契約締結日から着手日までの期間について、配置予定技術者の専任配置を要しない。競争参加資格確認申請は令和8年7月8日9時から令和8年7月10日16時まで（必着）。入札期間は令和8年7月17日9時から令和8年7月22日17時まで（必着）。開札は令和8年7月23日午前10時30分予定。",true,"(redacted)","koukai-ibaraki",[30,31,32],{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":37,"parentId":38,"parentName":38,"bidInfoUrl":38},50,null,[40],{"year":41,"count":42},2026,13,{"sameOrganization":44,"samePrefecture":69,"similar":91},[45,50,55,59,64],{"id":46,"title":47,"organizationName":11,"prefectureName":12,"publishedDate":48,"deadlineDate":38,"budget":49,"status":16},2549067,"08県単道災防 第08-56-264-0-051号 道路排水設計業務委託","2026-07-16T15:00:00.000Z",4268000,{"id":51,"title":52,"organizationName":11,"prefectureName":12,"publishedDate":53,"deadlineDate":38,"budget":54,"status":16},2262140,"07国補地道第07-03-483-0-063号 物件補償調査業務委託(その2)","2026-07-09T15:00:00.000Z",6182000,{"id":56,"title":57,"organizationName":11,"prefectureName":12,"publishedDate":53,"deadlineDate":38,"budget":58,"status":16},2262139,"07国補地道第07-03-483-0-062号 物件補償調査業務委託(その1)",9075000,{"id":60,"title":61,"organizationName":11,"prefectureName":12,"publishedDate":53,"deadlineDate":62,"budget":63,"status":16},2262126,"【総合評価:事後審査】【週休2日・快適トイレ・遠隔臨場・熱中症対策】08国補交安第08-04-713-0-001号 08県単道修第08-56-805-0-001号 合併 歩道整備工事","2026-08-03T15:00:00.000Z",68156000,{"id":65,"title":66,"organizationName":11,"prefectureName":12,"publishedDate":67,"deadlineDate":38,"budget":68,"status":16},2015091,"07県単急傾斜 第07-05-019-0-052号 急傾斜地測量業務委託","2026-07-02T15:00:00.000Z",2805000,[70,75,79,83,87],{"id":71,"title":72,"organizationName":73,"prefectureName":12,"publishedDate":14,"deadlineDate":38,"budget":74,"status":16},2710189,"08国補河改 第08-05-147-0-051号 07国補河改 第07-05-147-A-051号 合併 護岸詳細設計業務委託(その1)","茨城県 土木部 高萩工事事務所",28699000,{"id":76,"title":77,"organizationName":73,"prefectureName":12,"publishedDate":14,"deadlineDate":38,"budget":78,"status":16},2710188,"07国補河改 第07-05-148-A-055号 護岸詳細設計業務委託(その4)",21021000,{"id":80,"title":81,"organizationName":73,"prefectureName":12,"publishedDate":14,"deadlineDate":38,"budget":82,"status":16},2710187,"07国補河改 第07-05-147-A-056号 護岸詳細設計業務委託(その2)",23683000,{"id":84,"title":85,"organizationName":73,"prefectureName":12,"publishedDate":14,"deadlineDate":38,"budget":86,"status":16},2710186,"07国補河改 第07-05-148-A-052号 護岸詳細設計業務委託(その1)",16005000,{"id":88,"title":89,"organizationName":73,"prefectureName":12,"publishedDate":14,"deadlineDate":38,"budget":90,"status":16},2710185,"07国補河改 第07-05-525-A-051号 護岸詳細設計業務委託",27313000,[92,97,101,107,113],{"id":93,"title":94,"organizationName":95,"prefectureName":12,"publishedDate":14,"deadlineDate":38,"budget":96,"status":16},2707383,"08国補地道 第08-03-631-0-052号 08国補地道 第08-03-161-0-052号 合併 交差点詳細設計業務委託","茨城県 土木部 水戸土木事務所",14960000,{"id":98,"title":99,"organizationName":95,"prefectureName":12,"publishedDate":14,"deadlineDate":38,"budget":100,"status":16},2707382,"08国補地道 第08-03-631-0-051号 08国補地道 第08-03-161-0-051号 合併 路線測量業務委託",7546000,{"id":102,"title":103,"organizationName":104,"prefectureName":105,"publishedDate":14,"deadlineDate":106,"budget":38,"status":16},2706818,"県単河川改良及び県単河川維持合併工事(蟹田護岸工)","千葉県 県土整備部 夷隅土木事務所","千葉県","2026-08-06T15:00:00.000Z",{"id":108,"title":109,"organizationName":110,"prefectureName":12,"publishedDate":14,"deadlineDate":111,"budget":112,"status":16},2705583,"08県単道改 第08-59-053-0-001号・07県単道改 第07-03-075-0-001号 合併 道路改良舗装工事","茨城県 土木部 土浦土木事務所","2026-08-19T15:00:00.000Z",16203000,{"id":114,"title":115,"organizationName":95,"prefectureName":12,"publishedDate":14,"deadlineDate":111,"budget":116,"status":16},2705582,"08国補橋修 第08-04-429-0-001号 橋梁修繕工事(涸沼橋その1)※総合評価",147411000,[118,124,130,135],{"title":119,"link":120,"date":121,"thumb":122,"cat":123},"契約保証金とは？保証率・納入方法・免除条件を実務担当者向けに解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fcontract-bond\u002F","2026-07-15T12:00:35","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_contract-bond-300x167.webp","参加の準備",{"title":125,"link":126,"date":127,"thumb":128,"cat":129},"入札保証金とは？契約保証金との違い・金額・免除条件を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-bond\u002F","2026-07-15T11:59:32","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-bond-300x167.webp","実務ノウハウ",{"title":131,"link":132,"date":133,"thumb":134,"cat":129},"入札参加表明書の書き方｜記載項目・提出手順・注意点を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-participation-form\u002F","2026-07-15T11:51:41","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-participation-form-300x167.webp",{"title":136,"link":137,"date":138,"thumb":139,"cat":123},"電子入札のICカード完全ガイド｜取得方法・費用・使い方まで解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-ic-card\u002F","2026-07-15T11:45:14","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F06\u002Fthumb_e-bidding-ic-card-300x167.webp"]