[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-1912386":3,"bid-history-1912386":38,"bid-related-1912386":42,"union-latest":110},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"budgetTaxIncluded":26,"documentUrls":28,"businessExperience":26,"localOffice":26,"securityRequirement":32,"qualifications":33,"certifications":34,"organization":35},1912386,"【6\u002F26:入札公告中の一括審査方式の文言を削除しました。】【とりおり1\u002F3】【総合評価:事後審査】【ICT・週休2日・快適トイレ・遠隔臨場】07国補河改 第07-05-042-A-001号 地盤改良工事(その1)",2218,8,2,14,1,"茨城県 土木部 鉾田工事事務所","茨城県","2026-06-25T15:00:00.000Z","2026-07-21T15:00:00.000Z",110891000,"active","土木","一般競争入札","土木一式工事","一級河川 巴川 鉾田市青柳","17:00:00","2026-07-22T15:00:00.000Z","・令和7・8年度茨城県建設工事入札参加資格者名簿に登載され、土木一式工事がS又はA等級であること\n・平成28年4月1日から令和8年3月31日の期間に竣工した同種又は類似工事を元請として施工した実績があること（共同企業体の構成員としての実績は出資比率20%以上の場合のみ）\n・同種工事：施工深度11m以上の軟弱地盤処理工事（深層混合処理工法）\n・類似工事：軟弱地盤処理工事（表層混合処理工法、深層混合処理工法）\n・土木一式工事について特定建設業の許可を受けていること\n・契約締結日において、契約締結日から1年7月以内の審査基準日の経営事項審査を受けている者であること\n・一級又は二級土木施工管理技士（土木）の資格を有する、建設業法第26条に規定する主任又は監理技術者となり得る配置予定技術者を配置すること\n・配置予定技術者は直接的かつ恒常的な雇用関係があり、申請日以前に3月以上の雇用関係がある者であること\n・鉾田工事事務所管内又は潮来市内若しくは鹿嶋市内に建設業法に基づく主たる営業所又は営業所があること\n・対象工事の設計業務受託者（三井共同建設コンサルタント（株））でないこと\n・受託者と資本又は人事面において関連がない者であること","【案件概要】\n茨城県鉾田工事事務所が発注する一般競争入札（総合評価方式・事後審査）。河川改修工事に伴う地盤改良工事で、一級河川巴川の鉾田市青柳地先で実施される。予定価格は110,891,000円（消費税込み）。工期は220日間。本工事は分割発注3件（その1～その3）の同一工種工事であり、先行開札工事の落札者は後続工事への入札参加が制限される。ICT施工・週休","2日制・遠隔臨場などの施工技術活用が求められる。\n\n【業務内容】\n- 河川改修工事 延長L=143.4m\n- 掘削工 V=410m³\n- 盛土工 V=683m³\n- 地盤改良工（表層混合処理、厚さt=0.9m） A=1,460m²\n- 地盤改良工（深層混合処理、φ1400mm） L=11.6m N=261本、L=11.1m N=60本\n- 建設リサイクル法に基づく分別解体・廃棄物再資源化対応\n\n【応募要件】\n- 令和7・8年度茨城県建設工事入札参加資格者名簿に登載され、土木一式工事がS又はA等級であること\n- 平成28年4月1日～令和8年3月31日に竣工した同種又は類似工事の元請実績があること（施工深度11m以上の軟弱地盤処理工事（深層混合処理工法）が同種、表層・深層混合処理工法が類似）\n- 土木一式工事について特定建設業許可を受けていること\n- 契約締結日から1年7月以内の経営事項審査を受けていること\n- 一級又は二級土木施工管理技士（土木）の資格を有する配置予定技術者を配置すること\n- 鉾田工事事務所管内又は潮来市・鹿嶋市内に建設業法に基づく主たる営業所又は営業所があること\n- 対象工事の設計業務受託者（三井共同建設コンサルタント（株））ではなく、当該受託者と資本又は人事面で関連がないこと\n- 最低制限価格及び調査基準価格が設定される\n\n【工期・期間】\n契約締結日から220日間の工期を設定。開札予定日は令和8年7月23日（木）9時。競争参加資格確認申請は令和8年7月8日（水）9時～7月10日（金）16時、入札期間は令和8年7月17日（金）9時～7月22日（水）17時。",true,"(redacted)",[29,30,31],{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":36,"parentId":37,"parentName":37,"bidInfoUrl":37},50,null,[39],{"year":40,"count":41},2026,13,{"sameOrganization":43,"samePrefecture":67,"similar":93},[44,49,53,58,63],{"id":45,"title":46,"organizationName":11,"prefectureName":12,"publishedDate":47,"deadlineDate":37,"budget":48,"status":16},2262140,"07国補地道第07-03-483-0-063号 物件補償調査業務委託(その2)","2026-07-09T15:00:00.000Z",6182000,{"id":50,"title":51,"organizationName":11,"prefectureName":12,"publishedDate":47,"deadlineDate":37,"budget":52,"status":16},2262139,"07国補地道第07-03-483-0-062号 物件補償調査業務委託(その1)",9075000,{"id":54,"title":55,"organizationName":11,"prefectureName":12,"publishedDate":47,"deadlineDate":56,"budget":57,"status":16},2262126,"【総合評価:事後審査】【週休2日・快適トイレ・遠隔臨場・熱中症対策】08国補交安第08-04-713-0-001号 08県単道修第08-56-805-0-001号 合併 歩道整備工事","2026-08-03T15:00:00.000Z",68156000,{"id":59,"title":60,"organizationName":11,"prefectureName":12,"publishedDate":61,"deadlineDate":37,"budget":62,"status":16},2015091,"07県単急傾斜 第07-05-019-0-052号 急傾斜地測量業務委託","2026-07-02T15:00:00.000Z",2805000,{"id":64,"title":65,"organizationName":11,"prefectureName":12,"publishedDate":61,"deadlineDate":37,"budget":66,"status":16},2015084,"【とりおり1\u002F2】08県単交安 第08-56-302-0-001号 08県単警共 第08-56-392-0-001号 07県単交安 第07-56-302-0-001号 合併 交通安全施設設置工事(鉾田地区)",9603000,[68,73,79,84,88],{"id":69,"title":70,"organizationName":71,"prefectureName":12,"publishedDate":47,"deadlineDate":72,"budget":37,"status":16},2299737,"【電子入札】【電子契約】情報交流棟北ウイング非常用発電点検整備作業","国立研究開発法人日本原子力研究開発機構本部","2026-08-19T15:00:00.000Z",{"id":74,"title":75,"organizationName":76,"prefectureName":12,"publishedDate":47,"deadlineDate":77,"budget":78,"status":16},2299566,"【入札公告】福祉第1号 文化福祉会館(1階)LED照明交換工事に係る条件付一般競争入札の実施について","茨城県大子町","2026-07-29T15:00:00.000Z",11899800,{"id":80,"title":81,"organizationName":82,"prefectureName":12,"publishedDate":47,"deadlineDate":83,"budget":37,"status":16},2299565,"間接水冷金標的 一式","大学共同利用機関法人高エネルギー加速器研究機構","2026-07-20T15:00:00.000Z",{"id":85,"title":86,"organizationName":82,"prefectureName":12,"publishedDate":47,"deadlineDate":87,"budget":37,"status":16},2299564,"PFリング横方向フィードバック用高周波アンプ 5台","2026-08-02T15:00:00.000Z",{"id":89,"title":90,"organizationName":91,"prefectureName":12,"publishedDate":47,"deadlineDate":92,"budget":37,"status":16},2297553,"火山観測施設観測井掘削工事及び付帯工事(蔵王山)","独立行政法人防災科学技術研究所","2026-07-27T15:00:00.000Z",[94,98,102,106],{"id":95,"title":96,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":97,"status":16},1912385,"【6\u002F26:入札公告中の一括審査方式の文言を削除しました。】【総合評価:事後審査】【週休2日・快適トイレ・遠隔臨場】08県単急傾斜 第08-05-268-0-001号 外2件合併 急傾斜地崩壊対策工事",58762000,{"id":99,"title":100,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":101,"status":16},1912384,"【6\u002F26:入札公告中の一括審査方式の文言を削除しました。】【総合評価:事後審査】【週休2日・快適トイレ・遠隔臨場】08国補急傾斜 第08-05-005-0-001号 外2件合併 急傾斜地崩壊対策工事",40623000,{"id":103,"title":104,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":105,"status":16},1912383,"【6\u002F26:入札公告中の一括審査方式の文言を削除しました。】【とりおり2\u002F3】【総合評価:事後審査】【ICT・週休2日・快適トイレ・遠隔臨場】07国補河改 第07-05-042-A-002号 地盤改良工事(その2)",107976000,{"id":107,"title":108,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":109,"status":16},1912382,"【6\u002F26:入札公告中の一括審査方式の文言を削除しました。】【とりおり3\u002F3】【総合評価:事後審査】【ICT・週休2日・快適トイレ・遠隔臨場】07国補河改 第07-05-042-A-003号 地盤改良工事(その3)",103026000,[111,117,122,128],{"title":112,"link":113,"date":114,"thumb":115,"cat":116},"入札失注対策の完全ガイド｜原因分析から次回改善まで実務で使える手順","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Flost-bid-measures\u002F","2026-07-08T13:00:17","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_lost-bid-measures-300x167.webp","実務ノウハウ",{"title":118,"link":119,"date":120,"thumb":121,"cat":116},"入札 内訳書の書き方｜2025年改正対応・記載項目・注意点を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-breakdown-statement\u002F","2026-07-08T12:54:44","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-breakdown-statement-300x167.webp",{"title":123,"link":124,"date":125,"thumb":126,"cat":127},"入札説明書とは？確認すべき主要項目と仕様書との違いを徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-instructions\u002F","2026-07-08T12:52:35","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-instructions-300x167.webp","入札の基礎",{"title":129,"link":130,"date":131,"thumb":132,"cat":116},"前払金（公共工事）とは？仕組み・割合・手続きを実務担当者向けに解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fadvance-payment\u002F","2026-07-08T12:49:53","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_advance-payment-300x167.webp"]