[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-1912383":3,"bid-history-1912383":38,"bid-related-1912383":42,"union-latest":110},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"budgetTaxIncluded":26,"documentUrls":28,"businessExperience":26,"localOffice":26,"securityRequirement":32,"qualifications":33,"certifications":34,"organization":35},1912383,"【6\u002F26:入札公告中の一括審査方式の文言を削除しました。】【とりおり2\u002F3】【総合評価:事後審査】【ICT・週休2日・快適トイレ・遠隔臨場】07国補河改 第07-05-042-A-002号 地盤改良工事(その2)",2218,8,2,14,1,"茨城県 土木部 鉾田工事事務所","茨城県","2026-06-25T15:00:00.000Z","2026-07-21T15:00:00.000Z",107976000,"active","土木","一般競争入札","土木一式工事","一級河川 巴川 鉾田市当間","17:00:00","2026-07-22T15:00:00.000Z","・令和7・8年度茨城県建設工事入札参加資格者名簿に登載された土木一式工事の格付けがS又はA等級であること\n・平成28年4月1日から令和8年3月31日の期間に竣工した同種又は類似工事を元請として施工した実績があること（共同企業体の構成員の場合は出資比率20%以上）\n・同種工事：施工深度11m以上の軟弱地盤処理工事（深層混合処理工法）\n・類似工事：軟弱地盤処理工事（表層混合処理工法、深層混合処理工法）\n・一級又は二級土木施工管理技士（土木）の資格を有し、建設業法第26条に規定する主任又は監理技術者になり得る者を配置予定技術者とすること\n・監理技術者として配置される場合は、監理技術者資格者証（土木一式工事対応）を有し、監理技術者講習を修了していること\n・土木一式工事について特定建設業の許可を受けていること\n・契約締結日において、契約締結日から1年7月以内の審査基準日の経営事項審査を受けている者であること\n・対象工事の設計業務等の受託者（三井共同建設コンサルタント（株））でなく、かつ資本又は人事面において関連がない者であること\n・鉾田工事事務所管内又は潮来市内若しくは鹿嶋市内に建設業法に基づく主たる営業所（本店）又は営業所（支店等）があること\n・専任特例1号、2号の配置を予定する場合は、連絡員配置、CCUS等の情報通信技術措置、人員配置計画書の作成等の所定条件を全て満たすこと","【案件概要】\n茨城県土木部鉾田工事事務所が、一級河川巴川（鉾田市当間）における地盤改良工事(その2)の一般競争入札を実施する。予定価格は107,976,000円（税込）で、工期は220日間である。本工事は総合評価方式（特別簡易型(Ⅱ)）による事後審査方式であり、同一工種の分割工事(その1～その3)と同日開札される。先行開札工事の落札者は後続工事の入札に参加不","可。電子契約対象工事であり、ICT施工、週休2日制、快適トイレ、遠隔臨場に対応した工事である。\n\n【業務内容】\n- 河川改修工事（延長98.5m）\n- 掘削工（290m3）\n- 盛土工（1,180m3）\n- 地盤改良工（表層混合、厚さ0.9m、面積1,220m2）\n- 地盤改良工（深層混合、Φ1,400mm、延長12.1m、278本）\n- 建設リサイクル法に基づく分別解体及び特定建設資材廃棄物の再資源化等\n\n【応募要件】\n- 令和7・8年度茨城県建設工事入札参加資格者名簿に登載された土木一式工事の格付けがS又はA等級であること\n- 平成28年4月1日から令和8年3月31日の期間に竣工した同種又は類似工事を元請として施工した実績があること。共同企業体の構成員の場合は出資比率20%以上であること\n- 同種工事：施工深度11m以上の軟弱地盤処理工事（深層混合処理工法）\n- 類似工事：軟弱地盤処理工事（表層混合処理工法、深層混合処理工法）\n- 一級又は二級土木施工管理技士（土木）の資格を有し、建設業法第26条に規定する主任又は監理技術者になり得る者を配置予定技術者とすること\n- 監理技術者として配置される場合は、監理技術者資格者証（土木一式工事対応）を有し、監理技術者講習を修了していること\n- 土木一式工事について特定建設業の許可を受けていること\n- 契約締結日において、契約締結日から1年7月以内の審査基準日の経営事項審査を受けている者であること\n- 対象工事の設計業務等の受託者（三井共同建設コンサルタント（株））でなく、かつ資本又は人事面において関連がない者であること\n- 鉾田工事事務所管内又は潮来市内若しくは鹿嶋市内に建設業法に基づく主たる営業所（本店）又は営業所（支店等）があること\n- 建設業法施行令第27条第2項に該当する専任特例1号、及び第26条第3項第2号に該当する専任特例2号の配置については、所定の条件を全て満たす必要がある（連絡員配置、CCUS等の情報通信技術措置、人員配置計画書作成等）\n\n【工期・期間】\n契約締結日から工期220日間\n競争参加資格確認申請受付：令和8年7月8日(水)9時～7月10日(金)16時(必着)\n入札受付：令和8年7月17日(金)9時～7月22日(水)17時(必着)\n開札予定日時：令和8年7月23日(木)9時30分～",true,"(redacted)",[29,30,31],{"url":27,"name":27},{"url":27,"name":27},{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":36,"parentId":37,"parentName":37,"bidInfoUrl":37},50,null,[39],{"year":40,"count":41},2026,13,{"sameOrganization":43,"samePrefecture":67,"similar":93},[44,49,53,58,63],{"id":45,"title":46,"organizationName":11,"prefectureName":12,"publishedDate":47,"deadlineDate":37,"budget":48,"status":16},2262140,"07国補地道第07-03-483-0-063号 物件補償調査業務委託(その2)","2026-07-09T15:00:00.000Z",6182000,{"id":50,"title":51,"organizationName":11,"prefectureName":12,"publishedDate":47,"deadlineDate":37,"budget":52,"status":16},2262139,"07国補地道第07-03-483-0-062号 物件補償調査業務委託(その1)",9075000,{"id":54,"title":55,"organizationName":11,"prefectureName":12,"publishedDate":47,"deadlineDate":56,"budget":57,"status":16},2262126,"【総合評価:事後審査】【週休2日・快適トイレ・遠隔臨場・熱中症対策】08国補交安第08-04-713-0-001号 08県単道修第08-56-805-0-001号 合併 歩道整備工事","2026-08-03T15:00:00.000Z",68156000,{"id":59,"title":60,"organizationName":11,"prefectureName":12,"publishedDate":61,"deadlineDate":37,"budget":62,"status":16},2015091,"07県単急傾斜 第07-05-019-0-052号 急傾斜地測量業務委託","2026-07-02T15:00:00.000Z",2805000,{"id":64,"title":65,"organizationName":11,"prefectureName":12,"publishedDate":61,"deadlineDate":37,"budget":66,"status":16},2015084,"【とりおり1\u002F2】08県単交安 第08-56-302-0-001号 08県単警共 第08-56-392-0-001号 07県単交安 第07-56-302-0-001号 合併 交通安全施設設置工事(鉾田地区)",9603000,[68,73,79,84,88],{"id":69,"title":70,"organizationName":71,"prefectureName":12,"publishedDate":47,"deadlineDate":72,"budget":37,"status":16},2299737,"【電子入札】【電子契約】情報交流棟北ウイング非常用発電点検整備作業","国立研究開発法人日本原子力研究開発機構本部","2026-08-19T15:00:00.000Z",{"id":74,"title":75,"organizationName":76,"prefectureName":12,"publishedDate":47,"deadlineDate":77,"budget":78,"status":16},2299566,"【入札公告】福祉第1号 文化福祉会館(1階)LED照明交換工事に係る条件付一般競争入札の実施について","茨城県大子町","2026-07-29T15:00:00.000Z",11899800,{"id":80,"title":81,"organizationName":82,"prefectureName":12,"publishedDate":47,"deadlineDate":83,"budget":37,"status":16},2299565,"間接水冷金標的 一式","大学共同利用機関法人高エネルギー加速器研究機構","2026-07-20T15:00:00.000Z",{"id":85,"title":86,"organizationName":82,"prefectureName":12,"publishedDate":47,"deadlineDate":87,"budget":37,"status":16},2299564,"PFリング横方向フィードバック用高周波アンプ 5台","2026-08-02T15:00:00.000Z",{"id":89,"title":90,"organizationName":91,"prefectureName":12,"publishedDate":47,"deadlineDate":92,"budget":37,"status":16},2297553,"火山観測施設観測井掘削工事及び付帯工事(蔵王山)","独立行政法人防災科学技術研究所","2026-07-27T15:00:00.000Z",[94,98,102,106],{"id":95,"title":96,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":97,"status":16},1912386,"【6\u002F26:入札公告中の一括審査方式の文言を削除しました。】【とりおり1\u002F3】【総合評価:事後審査】【ICT・週休2日・快適トイレ・遠隔臨場】07国補河改 第07-05-042-A-001号 地盤改良工事(その1)",110891000,{"id":99,"title":100,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":101,"status":16},1912385,"【6\u002F26:入札公告中の一括審査方式の文言を削除しました。】【総合評価:事後審査】【週休2日・快適トイレ・遠隔臨場】08県単急傾斜 第08-05-268-0-001号 外2件合併 急傾斜地崩壊対策工事",58762000,{"id":103,"title":104,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":105,"status":16},1912384,"【6\u002F26:入札公告中の一括審査方式の文言を削除しました。】【総合評価:事後審査】【週休2日・快適トイレ・遠隔臨場】08国補急傾斜 第08-05-005-0-001号 外2件合併 急傾斜地崩壊対策工事",40623000,{"id":107,"title":108,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":109,"status":16},1912382,"【6\u002F26:入札公告中の一括審査方式の文言を削除しました。】【とりおり3\u002F3】【総合評価:事後審査】【ICT・週休2日・快適トイレ・遠隔臨場】07国補河改 第07-05-042-A-003号 地盤改良工事(その3)",103026000,[111,117,122,128],{"title":112,"link":113,"date":114,"thumb":115,"cat":116},"入札失注対策の完全ガイド｜原因分析から次回改善まで実務で使える手順","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Flost-bid-measures\u002F","2026-07-08T13:00:17","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_lost-bid-measures-300x167.webp","実務ノウハウ",{"title":118,"link":119,"date":120,"thumb":121,"cat":116},"入札 内訳書の書き方｜2025年改正対応・記載項目・注意点を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-breakdown-statement\u002F","2026-07-08T12:54:44","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-breakdown-statement-300x167.webp",{"title":123,"link":124,"date":125,"thumb":126,"cat":127},"入札説明書とは？確認すべき主要項目と仕様書との違いを徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-instructions\u002F","2026-07-08T12:52:35","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-instructions-300x167.webp","入札の基礎",{"title":129,"link":130,"date":131,"thumb":132,"cat":116},"前払金（公共工事）とは？仕組み・割合・手続きを実務担当者向けに解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fadvance-payment\u002F","2026-07-08T12:49:53","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_advance-payment-300x167.webp"]