[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-1906386":3,"bid-history-1906386":37,"bid-related-1906386":41,"union-latest":109},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":29,"documentUrls":30,"businessExperience":26,"localOffice":29,"securityRequirement":29,"qualifications":32,"certifications":33,"organization":34},1906386,"新井浄水場排水処理設備更新工事(R8) ※添付有",2057,12,2,25,1,"市原市 上下水道部 水道総務課","千葉県","2026-06-25T15:00:00.000Z","2026-07-23T15:00:00.000Z",48213000,"active","上水道","一般競争入札","排水処理設備工事","市原市新井","16:00:00","2026-07-28T15:00:00.000Z","・令和8・9年度市原市入札参加資格者名簿（建設工事部門）に登載されている者のうち、機械器具設置工事の登録がある者\n・機械器具設置工事の主任技術者又は監理技術者（直接かつ恒常的に雇用している者）を専任で配置できる者\n・一般建設業又は特定建設業の許可（機械器具設置工事業）を受けている者\n・本入札の契約の締結日前1年7か月以内の審査基準日による経営事項審査を受けている者\n・平成23年度以降に完成・引渡しが完了した、上水道施設において、処理能力8,400㎥\u002F日以上の浄水場における、機械器具設置工事（公共事業）の新設工事又は更新工事を元請として行った実績を有している者\n・市原市建設工事請負業者等指名停止措置要領に基づく指名停止措置を、本工事の公告の日から落札日までの間に受けていない者\n・市原市と契約した同一業種工事において、公告日前2か月以内に工事完成認定書による評定点が60点未満、または公告日前1か月以内に評定点が60点以上65点未満の通知を受けていない者\n・市原市が行う契約からの暴力団排除に関する措置要綱に基づく排除措置を、本工事の公告の日から落札日までの間に受けていない者\n・地方自治法施行令第167条の4の規定に該当しない者\n・本工事の公告の日から起算して、前2年以内に手形交換所又は電子交換所による取引停止処分を受けた者又は前6か月以内に手形若しくは小切手の不渡り事故を出した者でないこと\n・会社更生法の適用を申請した者にあっては、本工事の公告の日までに同法に基づく裁判所からの更生手続開始決定がされている者\n・民事再生法の適用を申請した者にあっては、本工事の公告の日までに同法に基づく裁判所からの再生手続開始決定がされている者","【案件概要】\n市原市上下水道部が実施する新井浄水場排水処理設備更新工事の一般競争入札。老朽化した排水処理設備を更新するもので、稼働中の既設設備との連携を図りながら施工を行う。予定価格は48,213,000円（消費税及び地方消費税を含む）。入札方式は総合評価落札方式（特別簡易型）で、技術提案等資料を評価した上で、価格と技術力を総合的に評価して落札者を決定する。","【業務内容】\n- 排泥池撹拌機 2台の設計・製作・据付工事\n- 排泥池移送ポンプ 2台の設計・製作・据付工事\n- 重力汚泥引抜ポンプ 1台の設計・製作・据付工事\n- リングコーン無段変速機 1台の設計・製作・据付工事\n- 既設機器の撤去工事\n- 機器製作計画書及び施工計画書の作成\n- 承諾図書（設計計算書及び製作設計図）の作成\n- 段階確認及び完成図書（金文字黒表紙製本及び電子データ）の提出\n\n【応募要件】\n- 令和8・9年度市原市入札参加資格者名簿（建設工事部門）に登載されており、機械器具設置工事の登録がある者\n- 機械器具設置工事の主任技術者又は監理技術者（直接かつ恒常的に雇用している者）を専任で配置できる者\n- 一般建設業又は特定建設業の許可（機械器具設置工事業）を受けている者\n- 本入札の契約の締結日前1年7か月以内の審査基準日による経営事項審査を受けている者\n- 平成23年度以降に完成・引渡しが完了した、上水道施設において、処理能力8,400㎥\u002F日以上の浄水場における、機械器具設置工事（公共事業）の新設工事又は更新工事を元請として行った実績を有している者\n- 市原市建設工事請負業者等指名停止措置を、公告日から落札日までの間に受けていない者\n- 市原市と契約した同一業種工事において、公告日前2か月以内に工事完成認定書による評定点が60点未満、又は公告日前1か月以内に評定点が60点以上65点未満の通知を受けていない者\n- 暴力団排除措置を、公告日から落札日までの間に受けていない者\n- 地方自治法施行令第167条の4の規定に該当しない者\n- 公告日から起算して前2年以内に手形交換所等による取引停止処分を受けておらず、前6か月以内に手形若しくは小切手の不渡り事故を出していない者\n- 会社更生法の適用を申請した者にあっては、公告日までに裁判所からの更生手続開始決定がされている者\n- 民事再生法の適用を申請した者にあっては、公告日までに裁判所からの再生手続開始決定がされている者\n\n【工期・期間】\n契約締結日から令和9年3月12日まで。なお、工期は発注段階での見込みであり、工期変更時に記載の変更は行わないものとする。",true,"(redacted)","ppi-core-chiba",false,[31],{"url":27,"name":27},[],[],{"id":6,"name":11,"categoryId":35,"parentId":36,"parentName":36,"bidInfoUrl":36},15,null,[38],{"year":39,"count":40},2026,18,{"sameOrganization":42,"samePrefecture":59,"similar":82},[43,47,50,53,56],{"id":44,"title":45,"organizationName":11,"prefectureName":12,"publishedDate":46,"deadlineDate":22,"budget":36,"status":16},2477138,"新井浄水場低圧電気設備保守点検委託(R8)","2026-07-08T15:00:00.000Z",{"id":48,"title":49,"organizationName":11,"prefectureName":12,"publishedDate":46,"deadlineDate":22,"budget":36,"status":16},2477137,"瀬又配水池設備保守点検委託(R8)",{"id":51,"title":52,"organizationName":11,"prefectureName":12,"publishedDate":46,"deadlineDate":22,"budget":36,"status":16},2477136,"新井浄水場排水処理設備保守点検委託(R8)",{"id":54,"title":55,"organizationName":11,"prefectureName":12,"publishedDate":46,"deadlineDate":22,"budget":36,"status":16},2477135,"新井浄水場活性炭ろ過池設備保守点検委託(R8)",{"id":57,"title":58,"organizationName":11,"prefectureName":12,"publishedDate":46,"deadlineDate":22,"budget":36,"status":16},2477134,"高滝取水場電気計装設備保守点検委託(R8)",[60,66,69,72,77],{"id":61,"title":62,"organizationName":63,"prefectureName":12,"publishedDate":64,"deadlineDate":65,"budget":36,"status":16},2712481,"南房総市外房地区自己搬入施設建設工事(機械設備工事)","南房総市 建設環境部 環境保全課","2026-07-21T15:00:00.000Z","2026-08-19T15:00:00.000Z",{"id":67,"title":68,"organizationName":63,"prefectureName":12,"publishedDate":64,"deadlineDate":65,"budget":36,"status":16},2712480,"南房総市外房地区自己搬入施設建設工事(電気設備工事)",{"id":70,"title":71,"organizationName":63,"prefectureName":12,"publishedDate":64,"deadlineDate":65,"budget":36,"status":16},2712479,"南房総市外房地区自己搬入施設建設工事(外構工事)",{"id":73,"title":74,"organizationName":75,"prefectureName":12,"publishedDate":64,"deadlineDate":65,"budget":76,"status":16},2712478,"市道千倉111号線舗装修繕工事","南房総市 建設環境部 建設課",18887000,{"id":78,"title":79,"organizationName":80,"prefectureName":12,"publishedDate":64,"deadlineDate":65,"budget":81,"status":16},2712477,"旧富浦駅ふれあい公園構造物撤去工事","南房総市 商工観光部 観光プロモーション課",39589000,[83,89,95,99,104],{"id":84,"title":85,"organizationName":86,"prefectureName":12,"publishedDate":87,"deadlineDate":88,"budget":36,"status":16},1975166,"千葉県立八千代高等学校長寿命化対策管理・教室棟外改修電気設備工事(不調随契) ※添付有","千葉県 教育庁企画管理部 教育施設課","2026-07-09T15:00:00.000Z","2026-07-27T15:00:00.000Z",{"id":90,"title":91,"organizationName":92,"prefectureName":12,"publishedDate":93,"deadlineDate":94,"budget":36,"status":16},2163247,"さわやかちば県民プラザホール天井改修他工事実施設計 ※添付有","千葉県 教育庁教育振興部 さわやかちば県民プラザ","2026-07-06T15:00:00.000Z","2027-01-28T15:00:00.000Z",{"id":96,"title":97,"organizationName":98,"prefectureName":12,"publishedDate":93,"deadlineDate":14,"budget":36,"status":16},2163246,"手賀沼流域下水道管渠耐震診断業務委託(北部幹線318工区及び319工区) ※添付有","千葉県 県土整備部 手賀沼下水道事務所",{"id":100,"title":101,"organizationName":102,"prefectureName":12,"publishedDate":93,"deadlineDate":14,"budget":103,"status":16},2157294,"公共運動公園周辺地区整備工事(中地区外造成) ※添付有","千葉県 県土整備部 流山区画整理事務所",19833000,{"id":105,"title":106,"organizationName":107,"prefectureName":12,"publishedDate":93,"deadlineDate":36,"budget":108,"status":16},2157117,"都市計画基礎調査業務委託 ※添付有","四街道市 市長部局 経営企画部契約課",7139000,[110,116,122,127],{"title":111,"link":112,"date":113,"thumb":114,"cat":115},"契約保証金とは？保証率・納入方法・免除条件を実務担当者向けに解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fcontract-bond\u002F","2026-07-15T12:00:35","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_contract-bond-300x167.webp","参加の準備",{"title":117,"link":118,"date":119,"thumb":120,"cat":121},"入札保証金とは？契約保証金との違い・金額・免除条件を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-bond\u002F","2026-07-15T11:59:32","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-bond-300x167.webp","実務ノウハウ",{"title":123,"link":124,"date":125,"thumb":126,"cat":121},"入札参加表明書の書き方｜記載項目・提出手順・注意点を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-participation-form\u002F","2026-07-15T11:51:41","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-participation-form-300x167.webp",{"title":128,"link":129,"date":130,"thumb":131,"cat":115},"電子入札のICカード完全ガイド｜取得方法・費用・使い方まで解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-ic-card\u002F","2026-07-15T11:45:14","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F06\u002Fthumb_e-bidding-ic-card-300x167.webp"]