[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-1906304":3,"bid-history-1906304":37,"bid-related-1906304":41,"union-latest":123},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":11,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":29,"documentUrls":30,"businessExperience":26,"localOffice":26,"securityRequirement":26,"qualifications":32,"certifications":33,"organization":34},1906304,"急傾斜地崩壊対策工事(八代2) ※添付有",2033,12,2,14,1,"成田市 総務部 契約検査課","千葉県","2026-06-09T15:00:00.000Z","2026-07-08T15:00:00.000Z",54989000,"closed","土木","一般競争入札","急傾斜地崩壊対策工事","成田市八代地先","16:00:00","2026-07-14T15:00:00.000Z","・令和8・9年度成田市入札参加資格者名簿の「建設工事」部門に登載されていること\n・成田市内業者として登載され、土木一式工事について建設業法第3条で規定する建設業許可を有すること\n・土木一式工事について経営事項審査の総合評点が740点以上1,200点未満で登載されていること\n・土木一式工事について建設業法第26条第2項の監理技術者または同条第1項の主任技術者を配置し、公告日現在3ヶ月以上の直接的・恒常的な雇用関係にあること\n・特例監理技術者を配置する場合は監理技術者補佐の専任配置等所定の要件を満たすこと\n・現場代理人を常駐で配置し、公告日現在3ヶ月以上の直接的・恒常的な雇用関係にあること\n・平成28年度以降に官公庁等が発注した土木一式工事を元請として受注し施工完了した実績があること\n・手形交換所による取引停止処分を受けて2年以内でないこと、または開札日前6ヶ月以内に小切手・手形を不渡りにしていないこと\n・会社更生法・民事再生法の適用申請を受けていないこと\n・成田市建設工事請負業者等指名停止措置要領による指名停止措置を受けていないこと\n・成田市契約に係る暴力団対策措置要綱による入札参加除外を受けていないこと\n・本工事の設計業務受託者または当該受託者と資本・人事面で関連がない者であること\n・開札日以前3ヶ月以内に工事完成検査結果通知書で60点未満の評定を受けていないこと\n・健康保険法第48条、厚生年金保険法第27条、雇用保険法第7条の規定による届出義務を履行していること\n・開札日前日現在において、自らの責めに帰すべき事由により成田市発注の工事を工期内に完成できず引渡しを行わない状況にないこと","【案件概要】\n成田市が急傾斜地崩壊対策工事（八代2）の制限付一般競争入札（事後審査型・総合評価落札方式）を実施。工事場所は成田市八代地先。予定価格は54,989,000円（消費税含む）。工期は契約締結日の翌日から令和9年1月29日まで。入札は電子入札システムにより実施され、技術資料提出期限は令和8年7月9日、入札期限は同日午後4時、開札日は令和8年7月15日","午前9時7分。\n\n【業務内容】\n- 急傾斜地崩壊対策工 一式（施工延長L=21.5m）\n- 崩壊土砂防護柵工（φ267.4-6.6 H8180）5本\n- 伐採・除根工 一式（505m²）\n- 場所打杭工（ダウンザホールハンマ工）5本\n- 支柱架設・スパン構築・金網組立工\n- 作業構台工（システム構台 436空m³）\n- 敷鉄板設置・撤去（1,849m²）\n\n【応募要件】\n- 令和8・9年度成田市入札参加資格者名簿「建設工事」部門に登載されている者\n- 成田市内業者として登載され、土木一式工事について建設業許可を有すること\n- 土木一式工事の経営事項審査総合評点740点以上1,200点未満\n- 土木一式工事について監理技術者又は主任技術者を配置すること\n- 配置技術者は公告日現在3か月以上の直接的・恒常的な雇用関係にあること\n- 現場代理人を配置し、公告日現在3か月以上の直接的・恒常的な雇用関係にあること\n- 官公庁等が平成28年度以降に発注した土木一式工事について、元請として受注し施工完了した実績があること\n- 手形交換所による取引停止処分を受けて2年間を経過していない者でないこと\n- 会社更生法・民事再生法の適用を申請している者でないこと\n- 設計業務等の受託者又は当該受託者と資本若しくは人事面において関連がある建設業者でないこと\n- 開札日以前3か月以内に工事完成検査結果通知書で評定点60点未満の通知を受けていないこと\n- 健康保険法・厚生年金保険法・雇用保険法の届出義務を履行していること\n- 開札日前日において、自らの責めに帰すべき事由により成田市発注工事を工期内に完成できず、当該工事目的物の引渡しを行っていない者でないこと\n\n【工期・期間】\n契約締結日の翌日から令和9年1月29日まで。準備期間30日間、後片付け期間20日間を見込んでいる。雨休率0.78を適用。",true,"(redacted)","ppi-core-chiba",false,[31],{"url":27,"name":27},[],[8],{"id":6,"name":11,"categoryId":35,"parentId":36,"parentName":36,"bidInfoUrl":36},15,null,[38],{"year":39,"count":40},2026,63,{"sameOrganization":42,"samePrefecture":66,"similar":90},[43,50,54,58,62],{"id":44,"title":45,"organizationName":11,"prefectureName":12,"publishedDate":46,"deadlineDate":47,"budget":48,"status":49},2718235,"物件調査委託(西三里塚大清水線)","2026-07-21T15:00:00.000Z","2026-08-05T15:00:00.000Z",1562000,"active",{"id":51,"title":52,"organizationName":11,"prefectureName":12,"publishedDate":46,"deadlineDate":47,"budget":53,"status":49},2718234,"急傾斜地崩壊対策事業実施設計委託(台方2)",4917000,{"id":55,"title":56,"organizationName":11,"prefectureName":12,"publishedDate":46,"deadlineDate":47,"budget":57,"status":49},2718233,"急傾斜地崩壊対策事業実施設計委託(伊能2)",6039000,{"id":59,"title":60,"organizationName":11,"prefectureName":12,"publishedDate":46,"deadlineDate":47,"budget":61,"status":49},2718232,"測量調査及び実施設計委託(小野羽黒台2号線)",9669000,{"id":63,"title":64,"organizationName":11,"prefectureName":12,"publishedDate":46,"deadlineDate":47,"budget":65,"status":49},2718231,"第7分団第10部(本三里塚)消防器具庫新築工事設計業務委託",2739000,[67,71,75,80,85],{"id":68,"title":69,"organizationName":11,"prefectureName":12,"publishedDate":46,"deadlineDate":47,"budget":70,"status":49},2718230,"第7分団第8部(十余三)消防器具庫設計業務委託",3888500,{"id":72,"title":73,"organizationName":11,"prefectureName":12,"publishedDate":46,"deadlineDate":47,"budget":74,"status":49},2718229,"根木名川雨水1号幹線測量調査委託(不動ケ岡他)",11748000,{"id":76,"title":77,"organizationName":78,"prefectureName":12,"publishedDate":46,"deadlineDate":79,"budget":36,"status":49},2718228,"千葉県立市原八幡高等学校管理諸室・特別教室空調設備設計","千葉県 教育庁(県立学校) 千葉県立市原八幡高等学校","2026-08-06T15:00:00.000Z",{"id":81,"title":82,"organizationName":83,"prefectureName":12,"publishedDate":46,"deadlineDate":84,"budget":36,"status":49},2718028,"秋田川 排水路実施設計業務","千葉県 農林水産部 海匝農業事務所","2026-08-17T15:00:00.000Z",{"id":86,"title":87,"organizationName":11,"prefectureName":12,"publishedDate":46,"deadlineDate":88,"budget":89,"status":49},2717835,"下水道管路施設改築工事(ストックマネジメント)(加良部三丁目他)","2026-08-26T15:00:00.000Z",91564000,[91,98,105,111,117],{"id":92,"title":93,"organizationName":94,"prefectureName":95,"publishedDate":96,"deadlineDate":84,"budget":97,"status":49},2696939,"(令和8年8月19日開札)奥谷尻地区急傾斜地崩壊対策工事(R8工区)","広島県大竹市","広島県","2026-07-20T15:00:00.000Z",33472000,{"id":99,"title":100,"organizationName":101,"prefectureName":102,"publishedDate":103,"deadlineDate":104,"budget":36,"status":49},2638504,"(急)出合地区 急傾斜地崩壊対策工事(その1)","兵庫県 但馬県民局 養父土木事務所","兵庫県","2026-07-12T15:00:00.000Z","2026-07-28T15:00:00.000Z",{"id":106,"title":107,"organizationName":108,"prefectureName":109,"publishedDate":103,"deadlineDate":47,"budget":110,"status":49},2393947,"08県単砂修 第08-59-807-0-004号 07国補急傾斜 第07-05-008-A-002号 合併 急傾斜地崩壊対策工事","茨城県 土木部 土浦土木事務所","茨城県",76527000,{"id":112,"title":113,"organizationName":114,"prefectureName":12,"publishedDate":115,"deadlineDate":116,"budget":36,"status":49},1975166,"千葉県立八千代高等学校長寿命化対策管理・教室棟外改修電気設備工事(不調随契) ※添付有","千葉県 教育庁企画管理部 教育施設課","2026-07-09T15:00:00.000Z","2026-07-27T15:00:00.000Z",{"id":118,"title":119,"organizationName":120,"prefectureName":12,"publishedDate":121,"deadlineDate":122,"budget":36,"status":49},2163247,"さわやかちば県民プラザホール天井改修他工事実施設計 ※添付有","千葉県 教育庁教育振興部 さわやかちば県民プラザ","2026-07-06T15:00:00.000Z","2027-01-28T15:00:00.000Z",[124,130,136,142],{"title":125,"link":126,"date":127,"thumb":128,"cat":129},"官公需適格組合とは？中小企業が入札で有利になる仕組みをわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fkankojyu-cooperative\u002F","2026-07-22T18:07:27","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_kankojyu-cooperative-300x167.webp","参加の準備",{"title":131,"link":132,"date":133,"thumb":134,"cat":135},"随意契約とは？定義・要件・金額基準をわかりやすく解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fdiscretionary-contract\u002F","2026-07-22T18:06:15","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_discretionary-contract-300x167.webp","入札の基礎",{"title":137,"link":138,"date":139,"thumb":140,"cat":141},"入札公告の見方を完全解説｜記載項目・確認手順・活用法まで","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-announcement\u002F","2026-07-22T18:04:37","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-announcement-300x167.webp","情報収集・効率化",{"title":143,"link":144,"date":145,"thumb":146,"cat":129},"電子入札のデメリットを徹底解説｜初期費用・操作スキル・システム障害まで対策付きで紹介","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-demerit\u002F","2026-07-22T18:02:16","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_e-bidding-demerit-300x167.webp"]