[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-1511896":3,"bid-history-1511896":35,"bid-related-1511896":39,"union-latest":115},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":10,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":14,"budget":15,"status":16,"department":17,"bidCategoryName":18,"bidTypeName":19,"categoryText":20,"regionText":11,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"budgetTaxIncluded":15,"documentUrls":28,"businessExperience":26,"localOffice":30,"securityRequirement":30,"qualifications":31,"certifications":32,"organization":33},1511896,"・07繰国補第2号−2 中川小学校体育館大規模改造(長寿命化)工事(再公告)",585,8,2,12,1,"茨城県坂東市","茨城県","2026-06-16T15:00:00.000Z","2026-07-12T15:00:00.000Z",null,"active","坂東市 教育委員会 学校教育課","建築","一般競争入札","工事","15:00:00","2026-07-13T15:00:00.000Z","・建設業法第3条の規定による建設業許可を受けていること\n・坂東市の令和7・8年度一般競争入札参加資格者名簿に登録されていること\n・直近の経営事項審査結果通知書に基づき参加資格判定されること\n・坂東市の指名停止措置を公告日から開札日までの間受けていないこと\n・会社更生法又は民事再生法に基づく更生・再生手続中でないこと\n・国税及び地方税の未納がないこと\n・法第26条の規定による技術者を適正に配置できること\n・法第27条の23第1項に規定する経営に関する客観的事項の審査を受けていること\n・政令第167条の4の規定に該当しないこと\n・公告日時点において手持ち工事件数が2件未満であること\n・監理技術者資格者証（建築一式工事対応）を有し、5年以上の建築一式工事実務経験者で、過去10年間に同種工事の施工管理経歴を有する者を専任配置すること\n・過去10年間に同種工事を元請けとして受注し、完成・引渡しが完了した実績があること\n・建築工事担当技術員を1名以上選任すること\n・現場代理人を工事現場に常駐させること","【案件概要】\n坂東市教育委員会が中川小学校体育館の大規模改造（長寿命化）工事を一般競争入札で実施する。対象工事は既存体育館（SRC造一部S造2階建て817㎡、昭和57年建築）の改造で、建築工事一式、電気設備工事一式、機械設備工事一式を含む。工事場所は坂東市小山108番地。工期は本契約締結の翌日から令和9年3月26日まで（検査期間14日間を含む）。建設業許可8","00点以上（坂東市内本店は750点以上）の者が対象。\n\n【業務内容】\n- 既存体育館の大規模改造工事の実施\n- 建築工事一式（新増改築、耐震補強、大規模改修）\n- 電気設備工事一式\n- 機械設備工事一式\n- 現場代理人の常駐配置\n- 工事管理及び施工実績の報告\n\n【応募要件】\n- 建設業法第3条の規定による建設業許可を受けていること\n- 坂東市の令和7・8年度一般競争入札参加資格者名簿に登録されていること\n- 坂東市の指名停止措置を公告日から開札日までの間受けていないこと\n- 会社更生法又は民事再生法に基づく手続中でないこと\n- 国税及び地方税の未納がないこと\n- 法第26条の規定による技術者を適正に配置できること\n- 法第27条の23第1項に規定する経営に関する客観的事項の審査を受けていること\n- 政令第167条の4の規定に該当しないこと\n- 公告日時点において手持ち工事件数が2件未満であること（坂東市発注の予定価格1,000万円以上の未完了工事）\n- 監理技術者資格者証（建築一式工事対応）を有し、5年以上の建築一式工事実務経験者で、過去10年間に同種工事の施工管理経歴を有する者を専任配置すること\n- 過去10年間に本工事と同種工事を元請けとして受注し、完成・引渡しが完了した実績があること（CORINS登録、請負金額5,000万円以上）\n- 建築工事担当技術員として監理技術者又は主任技術者のほか、建築工事実務経験者を1名以上選任すること\n- 現場代理人を工事現場に常駐させること\n\n【工期・期間】\n契約締結の翌日から令和9年3月26日まで（検査期間14日間を含む）。入札書提出期間は令和8年7月9日（木）から7月13日（月）午後3時まで。開札日は令和8年7月14日（火）午前9時。",true,"(redacted)",[29],{"url":27,"name":27},false,[],[],{"id":6,"name":11,"categoryId":34,"parentId":15,"parentName":15,"bidInfoUrl":15},52,[36],{"year":37,"count":38},2026,32,{"sameOrganization":40,"samePrefecture":58,"similar":85},[41,46,49,52,55],{"id":42,"title":43,"organizationName":11,"prefectureName":12,"publishedDate":44,"deadlineDate":45,"budget":15,"status":16},2204499,"・逆井城跡公園木橋改修工事(再公告)","2026-07-07T15:00:00.000Z","2026-07-22T15:00:00.000Z",{"id":47,"title":48,"organizationName":11,"prefectureName":12,"publishedDate":44,"deadlineDate":45,"budget":15,"status":16},2204498,"・8道維持債第10号 舗装修繕工事",{"id":50,"title":51,"organizationName":11,"prefectureName":12,"publishedDate":44,"deadlineDate":45,"budget":15,"status":16},2204497,"・8国補防安交第1号−1 7国補防安交第4号−1 合併 公園整備工事",{"id":53,"title":54,"organizationName":11,"prefectureName":12,"publishedDate":44,"deadlineDate":45,"budget":15,"status":16},2204496,"・8国補社資交狭道第7号−1 道路改良工事",{"id":56,"title":57,"organizationName":11,"prefectureName":12,"publishedDate":13,"deadlineDate":45,"budget":15,"status":16},1511897,"・令和8年度 坂東インター工業団地第2取水場さく井工事",[59,65,71,76,80],{"id":60,"title":61,"organizationName":62,"prefectureName":12,"publishedDate":63,"deadlineDate":64,"budget":15,"status":16},2299737,"【電子入札】【電子契約】情報交流棟北ウイング非常用発電点検整備作業","国立研究開発法人日本原子力研究開発機構本部","2026-07-09T15:00:00.000Z","2026-08-19T15:00:00.000Z",{"id":66,"title":67,"organizationName":68,"prefectureName":12,"publishedDate":63,"deadlineDate":69,"budget":70,"status":16},2299566,"【入札公告】福祉第1号 文化福祉会館(1階)LED照明交換工事に係る条件付一般競争入札の実施について","茨城県大子町","2026-07-29T15:00:00.000Z",11899800,{"id":72,"title":73,"organizationName":74,"prefectureName":12,"publishedDate":63,"deadlineDate":75,"budget":15,"status":16},2299565,"間接水冷金標的 一式","大学共同利用機関法人高エネルギー加速器研究機構","2026-07-20T15:00:00.000Z",{"id":77,"title":78,"organizationName":74,"prefectureName":12,"publishedDate":63,"deadlineDate":79,"budget":15,"status":16},2299564,"PFリング横方向フィードバック用高周波アンプ 5台","2026-08-02T15:00:00.000Z",{"id":81,"title":82,"organizationName":83,"prefectureName":12,"publishedDate":63,"deadlineDate":84,"budget":15,"status":16},2297553,"火山観測施設観測井掘削工事及び付帯工事(蔵王山)","独立行政法人防災科学技術研究所","2026-07-27T15:00:00.000Z",[86,92,96,103,110],{"id":87,"title":88,"organizationName":89,"prefectureName":90,"publishedDate":63,"deadlineDate":91,"budget":15,"status":16},2297962,"令和7年度(補正)霧島錦江湾国立公園指宿園地長寿命化改修工事(再度公告)","環境省九州地方環境事務所","熊本県","2026-07-30T15:00:00.000Z",{"id":93,"title":88,"organizationName":94,"prefectureName":90,"publishedDate":63,"deadlineDate":95,"budget":15,"status":16},2297958,"環境省","2026-07-16T15:00:00.000Z",{"id":97,"title":98,"organizationName":99,"prefectureName":100,"publishedDate":63,"deadlineDate":101,"budget":102,"status":16},2297571,"告示第345号 地蔵橋外1橋長寿命化工事","埼玉県所沢市","埼玉県","2026-08-03T15:00:00.000Z",67034000,{"id":104,"title":105,"organizationName":106,"prefectureName":107,"publishedDate":63,"deadlineDate":108,"budget":109,"status":16},2296476,"本郷小学校屋内運動場長寿命化改修工事(建築主体工事)","広島県三原市","広島県","2026-08-04T15:00:00.000Z",211745000,{"id":111,"title":112,"organizationName":15,"prefectureName":113,"publishedDate":63,"deadlineDate":114,"budget":15,"status":16},2274858,"【総合評価方式】【余裕期間設定】相原保育園長寿命化改修工事","神奈川県","2027-08-26T15:00:00.000Z",[116,122,127,133],{"title":117,"link":118,"date":119,"thumb":120,"cat":121},"入札失注対策の完全ガイド｜原因分析から次回改善まで実務で使える手順","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Flost-bid-measures\u002F","2026-07-08T13:00:17","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_lost-bid-measures-300x167.webp","実務ノウハウ",{"title":123,"link":124,"date":125,"thumb":126,"cat":121},"入札 内訳書の書き方｜2025年改正対応・記載項目・注意点を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-breakdown-statement\u002F","2026-07-08T12:54:44","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-breakdown-statement-300x167.webp",{"title":128,"link":129,"date":130,"thumb":131,"cat":132},"入札説明書とは？確認すべき主要項目と仕様書との違いを徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-instructions\u002F","2026-07-08T12:52:35","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-instructions-300x167.webp","入札の基礎",{"title":134,"link":135,"date":136,"thumb":137,"cat":121},"前払金（公共工事）とは？仕組み・割合・手続きを実務担当者向けに解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fadvance-payment\u002F","2026-07-08T12:49:53","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_advance-payment-300x167.webp"]