[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bid-1495790":3,"bid-history-1495790":36,"bid-related-1495790":40,"union-latest":106},{"id":4,"title":5,"organizationId":6,"prefectureId":7,"bidCategoryId":8,"bidCategoryChildId":9,"bidTypeId":7,"organizationName":10,"prefectureName":11,"publishedDate":12,"deadlineDate":13,"budget":14,"status":15,"department":16,"bidCategoryName":17,"bidTypeName":18,"categoryText":19,"regionText":20,"deadlineTime":21,"openingDate":22,"qualificationText":23,"aiSummary":24,"aiSummaryGated":25,"aiSummaryTruncated":26,"sourceUrl":27,"dataSourceCode":28,"budgetTaxIncluded":14,"documentUrls":29,"businessExperience":26,"localOffice":26,"securityRequirement":31,"qualifications":32,"certifications":33,"organization":34},1495790,"堰堤維持の内 漁川ダム堆砂土掘削外工事",12,1,2,14,"国土交通省北海道開発局","北海道","2026-06-16T15:00:00.000Z","2026-06-29T15:00:00.000Z",null,"closed","千歳川河川事務所","土木","一般競争入札","工事","北海道札幌市","11:00:00","2026-09-03T15:00:00.000Z","・北海道開発局における工事区分「一般土木」に係る令和7・8年度一般競争参加資格でB等級、C等級、又は格付特例C等級の決定を受けていること\n・C等級又は格付特例C等級の場合は、「一般土木」の技術評価点数が500点以上又は「維持」の技術評価点数が500点以上\n・平成23年4月1日から公告開始日までに、1級又は2級河川における掘削又は切土工の元請施工実績を有すること（共同企業体の構成員としての実績は出資比率20%以上の場合）\n・1級又は2級河川における掘削又は切土工で土量10,000m3以上の施工実績（より同種性の高い工事条件）\n・1級土木施工管理技士又はこれと同等以上の資格を有する主任技術者又は監理技術者を配置できること\n・監理技術者資格者証及び監理技術者講習修了証を有すること\n・令和5年度及び令和6年度に完成した北海道開発局発注工事に係る工事成績評定点の平均点が65点以上\n・札幌開発建設部管内に本工事を施工するために必要な建設業許可を受けた本店が所在すること\n・設計業務等の受託者又は当該受託者と資本関係若しくは人的関係がある建設業者でないこと\n・申請書提出期限から開札時までの期間に指名停止を受けていないこと\n・暴力団員が実質的に経営を支配する者又はこれに準ずるものでないこと","【案件概要】\n国土交通省北海道開発局千歳川河川事務所が、漁川ダム堆砂土掘削外工事の一般競争入札（総合評価落札方式）を実施。対象地域は北海道恵庭市。予算規模は公告に記載なし。工事期間は契約締結日の翌日から令和9年3月12日まで。\n\n【業務内容】\n- 漁川ダムの貯水池に堆積している土砂を掘削し、貯水池機能を維持（掘削工：約15,000m3、工事延長150m）\n-","ダム管理用設備である放流警報局舎の改築（局舎設置1基、盛土160m3、局舎撤去1基、工事延長約14m）\n- 起工測量、設計図書照査、施工、出来形管理、検査は3次元データを活用したICT活用工事\n- BIM\u002FCIM適用工事（受注者希望型）\n- 新技術活用工事（原則1技術以上の選定と活用）\n\n【応募要件】\n・北海道開発局における工事区分「一般土木」に係る令和7・8年度一般競争参加資格でB等級、C等級、又は格付特例C等級の決定を受けていること（経常建設共同企業体の場合はB等級)\n・C等級又は格付特例C等級の場合は、「一般土木」の技術評価点数が500点以上又は「維持」の技術評価点数が500点以上\n・平成23年4月1日から公告開始日までに、1級又は2級河川における掘削又は切土工（土量10,000m3以上の実績が必要）の元請施工実績を有すること\n・1級土木施工管理技士又はこれと同等以上の資格を有する主任技術者又は監理技術者を配置できること\n・監理技術者資格者証及び監理技術者講習修了証を有すること\n・令和5年度及び令和6年度に完成した北海道開発局発注工事に係る工事成績評定点の平均点が65点以上であること\n・札幌開発建設部管内に本工事を施工するために必要な建設業許可を受けた本店が所在すること（共同企業体の場合は構成員のいずれか1社が有し、その他の構成員は北海道内に本店、支店又は営業所を有すること）\n・設計業務等の受託者又は当該受託者と資本関係若しくは人的関係がある建設業者でないこと\n・指名停止を受けていないこと\n・暴力団員が実質的に経営を支配する者又はこれに準ずるものでないこと\n\n【工期・期間】\n契約締結日の翌日から令和9年3月12日まで。局舎工区施工は10月1日以降の非洪水期。掘削工は1月13日以降。",true,"(redacted)","ippi-koji",[30],{"url":27,"name":27},false,[],[],{"id":6,"name":10,"categoryId":35,"parentId":14,"parentName":14,"bidInfoUrl":14},17,[37],{"year":38,"count":39},2026,796,{"sameOrganization":41,"samePrefecture":64,"similar":82},[42,48,53,57,60],{"id":43,"title":44,"organizationName":10,"prefectureName":11,"publishedDate":45,"deadlineDate":46,"budget":14,"status":47},2706202,"手稲山地区直轄地すべり対策事業の内 管理用通路整備工事","2026-07-21T15:00:00.000Z","2026-08-03T15:00:00.000Z","active",{"id":49,"title":50,"organizationName":10,"prefectureName":11,"publishedDate":51,"deadlineDate":52,"budget":14,"status":47},2697027,"除雪機械後方安全対策装置購入取付 (PDF:178KB)","2026-07-20T15:00:00.000Z","2026-09-14T15:00:00.000Z",{"id":54,"title":55,"organizationName":10,"prefectureName":11,"publishedDate":51,"deadlineDate":56,"budget":14,"status":47},2697026,"パーソナルコンピュータ229式の借入(再リース) (PDF:190KB)","2026-08-02T15:00:00.000Z",{"id":58,"title":59,"organizationName":10,"prefectureName":11,"publishedDate":51,"deadlineDate":56,"budget":14,"status":47},2697025,"北海道開発局RPAシナリオ保守等業務 (PDF:150KB)",{"id":61,"title":62,"organizationName":10,"prefectureName":11,"publishedDate":51,"deadlineDate":63,"budget":14,"status":47},2697024,"農地及び基幹水利施設に係る整備状況調査 (PDF:147KB)","2026-07-29T15:00:00.000Z",[65,70,73,76,79],{"id":66,"title":67,"organizationName":68,"prefectureName":11,"publishedDate":45,"deadlineDate":69,"budget":14,"status":47},2706175,"名寄(8)隊庁舎新設等機械工事","防衛省北海道防衛局","2026-08-23T15:00:00.000Z",{"id":71,"title":72,"organizationName":68,"prefectureName":11,"publishedDate":45,"deadlineDate":69,"budget":14,"status":47},2706174,"北恵庭(8)医務室等新設電気その他工事",{"id":74,"title":75,"organizationName":68,"prefectureName":11,"publishedDate":45,"deadlineDate":69,"budget":14,"status":47},2706173,"倶知安(8)隊庁舎等新設機械工事",{"id":77,"title":78,"organizationName":68,"prefectureName":11,"publishedDate":45,"deadlineDate":69,"budget":14,"status":47},2706172,"近文台(8)敷地造成工事",{"id":80,"title":81,"organizationName":11,"prefectureName":11,"publishedDate":45,"deadlineDate":14,"budget":14,"status":47},2705349,"令和8年度(2026年度)潜在的介護職員等活用推進事業委託業務契約に係る総合評価一般競争入札の実施について",[83,88,92,96,101],{"id":84,"title":85,"organizationName":86,"prefectureName":11,"publishedDate":87,"deadlineDate":56,"budget":14,"status":47},2043114,"漁川ダム管理支所庁舎屋上防水作業(千歳川河川事務所)","国土交通省北海道開発局札幌開発建設部","2026-07-02T15:00:00.000Z",{"id":89,"title":90,"organizationName":10,"prefectureName":11,"publishedDate":91,"deadlineDate":13,"budget":14,"status":15},1482131,"札内川ダム堰堤維持の内 ダム管理用制御処理設備工事","2026-06-15T15:00:00.000Z",{"id":93,"title":94,"organizationName":86,"prefectureName":11,"publishedDate":95,"deadlineDate":12,"budget":14,"status":15},955263,"漁川ダム漏水観測警報表示盤外取替(千歳川河川事務所)","2026-05-28T15:00:00.000Z",{"id":97,"title":98,"organizationName":10,"prefectureName":11,"publishedDate":99,"deadlineDate":100,"budget":14,"status":15},444014,"堰堤維持の内 夕張シューパロダム管理用道路法面対策工事","2026-05-12T15:00:00.000Z","2026-05-25T15:00:00.000Z",{"id":102,"title":103,"organizationName":10,"prefectureName":11,"publishedDate":104,"deadlineDate":105,"budget":14,"status":15},56237,"堰堤維持の内 漁川ダム周辺維持工事","2026-04-14T15:00:00.000Z","2026-05-11T15:00:00.000Z",[107,113,119,124],{"title":108,"link":109,"date":110,"thumb":111,"cat":112},"契約保証金とは？保証率・納入方法・免除条件を実務担当者向けに解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fcontract-bond\u002F","2026-07-15T12:00:35","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_contract-bond-300x167.webp","参加の準備",{"title":114,"link":115,"date":116,"thumb":117,"cat":118},"入札保証金とは？契約保証金との違い・金額・免除条件を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-bond\u002F","2026-07-15T11:59:32","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-bond-300x167.webp","実務ノウハウ",{"title":120,"link":121,"date":122,"thumb":123,"cat":118},"入札参加表明書の書き方｜記載項目・提出手順・注意点を徹底解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fbid-participation-form\u002F","2026-07-15T11:51:41","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F07\u002Fthumb_bid-participation-form-300x167.webp",{"title":125,"link":126,"date":127,"thumb":128,"cat":112},"電子入札のICカード完全ガイド｜取得方法・費用・使い方まで解説","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fe-bidding-ic-card\u002F","2026-07-15T11:45:14","https:\u002F\u002Fbid-scope.jp\u002Funion\u002Fwp-content\u002Fuploads\u002F2026\u002F06\u002Fthumb_e-bidding-ic-card-300x167.webp"]